NBS Source
I'm a manufacturer

"floor decking metal"

7,886 results found

Sort by:

Showing 1-36 of 782

Sponsored
Lightweight structural concrete for composite metal deck floor extension

Lightweight structural concrete for composite metal deck floor extension

Tarmac

A complete rework of a postmodern office building (60 London Wall), situated in the heart of the City of London. The project aim was to extensively refurbish, reconfigure, reinvent and reposition the building.Due to the addition of a composite metal deck floor extension and additional steel frame for the top floors, Tarmac’s Toplight C lightweight structural concrete was seen as the perfect solution as it could be pumped and ensured a weight loss of 30% whiel maintaining the necessary structural performance.
Sponsored
CV Pumping

CV Pumping

Anhydritec Ltd

A faster drying screed required over Lewis metal decking system on a first floor. Gyvlon FD, the screed is compatible with the Lewis system and gave the client the re assurance that the 6 week deadline would comfortably be achieved. Floor was dry for floor coverings after 28 days.
Sponsored
Laon Parliament  House - Metal Ceilings, Floor and More arena and Luminaires

Laon Parliament House - Metal Ceilings, Floor and More arena and Luminaires

Lindner Group

It was designed and produced by Lindner in Germany. Thus, the dome with the adjoining flat ceiling was divided into different sections and executed as a metal ceiling. In addition, there are artistic ornaments made of Lincrete and LED lights that bathe the hall in a pleasant light. Furthermore, Lindner was commissioned with the project planning and delivery of the floor system: the FLOOR and more® arena hollow floor system impresses with high load-bearing capacity and quick installation.Completed Works:CeilingsMetal CeilingsFloorsCalcium sulphate panels - FLOOR and more® arena LuminairesDownlights
Sponsored
Nile Street - Grad Decking System

Nile Street - Grad Decking System

Alfresco Floors Ltd

Alfresco Floors were commissioned to refurbish the external terrace of a top floor apartment located on Nile Street, London. The brand new GRAD invisible fixings clip system was supplied and installed by Alfresco Floors, their first ever GRAD installation in the UK. The unique clip and groove design at the heart of the GRAD system means that decks can be installed about 30% faster than competing products. The GRAD system can be retrofitted onto existing timber joists, installed from scratch on top of a new timber sub-frame, or mounted onto the bespoke rail system.
Sponsored
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors

HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors

Lindner Group

HAUSER is a traditional supplier of turnkey refrigeration systems, for example in the form of refrigerated shelves, counters and freezer cabinets. Besides its headquarters inLinz, Austria, the company also operates a plant in Budweis, Czech Republic. An office building was equipped with ceiling and floor systems from Lindner. In cooperation with the local partner Konstruktis Delta s. r. o., Lindner Plafotherm® DS 320 Type 1 metal ceilings with integrated heating and cooling functions were supplied. With regard to the floor systems, LIGNA and NORTEC raised floors were used.
Sponsored
Goldman Sachs

Goldman Sachs

CDM Stravitec

The new Headquarters of Goldman Sachs in London is in a great location on Farringdon Street in the City of London. This massive office development of 1.1 million square feet includes a large auditorium which is isolated to protect it from tube train noise and to protect the rest of the building.Sandy Brown specified that the box-in-box construction needed 10Hz bearings supporting it.Our local branch worked with Byrne Brothers to design supply and install the concrete floating floors and structural bearings. The complicated 3-dimensional space is supported on 5 separate floating floors with bearings beneath designed to take the column loads.The floating floors consist of Stravifloor Deck isolation rails supporting composite metal decking, reinforcement and concrete.Some of the columns are supported on Stravibase SEB bearings located outside of the floating floor areas.The new building has been named the ‘groundscraper’ due to its mammoth size – it will become one of London’s new collection of landmark buildings.
Sponsored
External decking on roof terrace

External decking on roof terrace

New Era Floor Systems Ltd

New Era cradles were used to lay a level decking system on a roof terrace that had natural sloped drainage. We used UC4 treated external swedish softwood battens and composite decking to ensure long lasting and maintenance free-use.
Sponsored
Conversion of a Grade II listed building into apartments

Conversion of a Grade II listed building into apartments

CDI Innovative Construction Materials Ltd

The project involved the conversion of the 1st floor of the Grade II listed Princes Building in Newcastle’s Quay side area into 10 apartments. The building, which was designed by William Parnel, who was responsible for some of the best architecture in the City, was built back in 1863 and as such posed some interesting problems when it came to bringing the building up to current standards. The introduction of the Lewis Dovetailed Metal Deck and screed system on top of the existing joists provided the necessary performance for airborne and impact sound and fire separation.
Sponsored
Grad `Hidden Fixing` Decking System Project

Grad `Hidden Fixing` Decking System Project

The Outdoor Deck Company Ltd

The Outdoor Deck Company were commissioned to refurbish the external terraces of several top floor apartments located on Nile Street, London. The brand new `grad` invisible fixing clip deck system was supplied and installed by the Outdoor Deck Company, their first ever `grad` installation in the UK. The unique clip and groove design at the heart of the `grad` system means that decks can be installed about 30% faster than competing products. The `grad` system can be retrofitted onto existing timber joists, installed from scratch on top of a new timber sub-frame, or mounted onto the bespoke rail system.
Sponsored
Royal Opera House

Royal Opera House

The Outdoor Deck Company Ltd

On the fourth floor of the Royal Opera House is a decking area of around 600sqm. For the last 25 years this was a hardwood deck, but when Stanton Williams Architects were asked to oversee the redevelopment of this area a new deck was an integral part of the plan. The Outdoor Deck Company were commissioned to install the Grad Decking System supplied by Alfresco Floors. The finished deck is part of a major transformation of the Royal Opera House by Stanton Williams and has been open to the public from September 2018.
Sponsored
Degafloor Top Deck Car Park - Dublin City University - Resin Flooring

Degafloor Top Deck Car Park - Dublin City University - Resin Flooring

Degafloor Ltd

Car park refurbishment for Dublin City UniversityMcKeon Construction Limited, were looking for a durable and innovative resin waterproofing system for one of their clients, Dublin City University (DCU). The university required car park refurbishment to a multi-storey car park where the existing deck coating had started to fail.McKeon discussed the client requirements with Larsen Contracts (Ireland) Ltd, a specialist resin contractor. Larsen recommended the Degafloor Top Deck System for the car park refurbishment.The Degafloor Car Park Top Deck System is designed to offer the outstanding flexibility and performance required for top decks of multi-storey car parks. The unique formulation allows installation to occur extremely quickly, with the main system of 23mm being installed in a single application process.The project was completed according to specification, within budget and on time. DCU and McKeon Construction Ltd are delighted with the results and the numerous benefits that the Degafloor Top Deck System has delivered, including: outstanding durability, flexibility, a totally seamless and impervious finish, exceptional slip resistance and visually pleasing aesthetics.Eddie O’Brien of Larsen Contracts Ltd commented: “The Degafloor Car Park Top Deck System enabled us to complete the installation within the short window of time available (weather wise). Traditionally, we have been unable to complete car park projects outside of summer months due to weather and temperature constraints, but this new system has made it possible for us to complete car park installations all year round.”
Sponsored
Redevelopment of Insworke Mill, Lewis Decking used for acoustics and under floor heating

Redevelopment of Insworke Mill, Lewis Decking used for acoustics and under floor heating

CDI Innovative Construction Materials Ltd

Insworke Mill was originally built in 1590 and survived as a working Mill until the First World War. After falling into disrepair it’s now undergoing a major refurbishment to convert it to its new life as commercial properties to the ground floor with a luxury residential dwelling above. To the first floor a Lewis® Deck/screed solution was used to provide acoustic separating floors with timber beams left exposed, replicating the original beams. On the ground floor; Lewis® was used as part of a warm floor solution above the cellar areas. U/F heating was incorporated in all floors.
Sponsored
Central Station Berlin
Completed Works:
- Metal Ceiling
- FLOOR and more
- NORTEC
- Plasterboard partition systems
- Fire protection doors

Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors

Lindner Group

Completed Works:- Metal Ceiling- FLOOR and more- NORTEC- Plasterboard partition systems- Fire protection doors
Sponsored
Rescuing a Poolside Deck from failed Decking Oils

Rescuing a Poolside Deck from failed Decking Oils

Owatrol UK Ltd

We’re always pleased to hear about how our products have helped customers with their renovation projects. However, we were particularly delighted when one of our Partners Roger, of R and A Pressure Washing Services, sent us these photographs of a poolside deck renovation he recently completed.The customer had previously treated their poolside deck with a decking oil, purchased on the high street. As you can see from the photo, the decking looked dull and tired and was not at all complementing the lovely rooftop views from the pool.We’ve had many customers tell us that the high street decking oils they had previously bought had failed. They were continuously having to sand and re-oil their decking to keep it looking smart. By investing in a good quality product, you could reduce both the time and money it takes you to constantly strip and re-oil your decking and replacing it with easy, low maintenance decking.Aquadecks, for example, is water-based and is easy to apply and maintain, with no sanding or stripping required. Sometimes, it’s worth investing in a more expensive product, such as Aquadecks, at the beginning, to save you money in the future.So, how did Roger rescue his customer’s poolside deck?Firstly, he mechanically sanded the deckingTo remove all the old oil from the surface of the decking, Roger sanded the decking with an electric sander. How the decking looked after sanding can be seen in the photo below.Whilst this step is often completed by professionals, for the DIYer it’s going to be easier to remove the old oils using Aquanett wood oil remover (if it’s a different sort of coating you’re removing then use Dilunett or Prepdeck).If you don’t want to sand back your decking, follow the steps below if you’re removing oils.Aquanett can be used to remove teak and other oils from all woods blackened by UV rays. It will prepare your decking for a new coating and improve penetration and adhesion. Its gel-like consistency means that it’s easy to apply.Even better, it’s suitable for environmentally sensitive areas, as it does not contain solvent or paraffin and it’s biodegradable.If you choose to use Aquanett instead of sanding, you’ll then need to neutralise the decking with Net-Trol before applying your finish.Then, he applied AquadecksNo matter how many times we see photos of decking renovations using Aquadecks water-based penetrative wood finish, we’re always really impressed with how it turns out.First of all, Roger applied a liberal amount of Aquadecks. Applying in the direction of the grain, he worked in sections that he could complete within 30 minutes.As soon as the ‘wet look’ of the first application had disappeared, Roger applied a second coat. He then allowed this to penetrate for 15 minutes.He then removed any excess Aquadecks that hadn’t penetrated the decking. This avoids it drying as shiny spots on the surface. The place for Aquadecks is in the wood, not on the surface.As Aquadecks is water-based, Roger was then able to clean his tools with soap and water.We think that the decking now looks as good as new – if not better!
Sponsored
Rivervale Barn - Wedding Venue using Rustic Decking

Rivervale Barn - Wedding Venue using Rustic Decking

SAiGE Longlife Decking

Saige’s Rustic Decking in Walnut has been supplied by SAiGE Stockist Kebur Garden Materials to beautiful wedding venue Rivervale Barn in Yateley. The traditional weathered effect decking compliments Rivervale's Spinney area perfectly. It blends seamlessly into the natural environment complimenting the stunning oak arch amongst the trees. SAiGE’s Rustic Decking has all the advantages of composite decking which will continue to look as if it has just been installed for years to come. It's long lasting, has excellent anti-slip ratings, resistant to mould and fungus attacks, low maintenance and will outperform wooden decking every time.
Sponsored
Garden deck transformed with Owatrol Decking Paint

Garden deck transformed with Owatrol Decking Paint

Owatrol UK Ltd

Last summer, we heard from Alex of Tiny Victorian Home on Instagram who reached out to us about her garden decks. Alex explained that they were in need of a makeover and that she really wanted to use a paint to give them a new lease of life.After previously speaking with her followers, she was warned about using paint on her decks as paint finishes always fail. However, after doing some of her own research, Alex then found Owatrol Decking Paint and after reading that it does not peel or flake, she decided to reach out to us for some further information.We recommended that Alex first use Net-Trol to clean her decks (as there were no previous finishes on them she did not need to use a stripping product) and then finish them with Decking Paint once dry. We sent her out a free colour card (which you can also order on our Decking Paint page) which shows off all 35 of our colours, so she could decide which samples she wanted to try.After a little deliberation, Alex decided to try out 3 colours; Traditional Grey, Light Grey and White. After painting the samples on to some off cuts of wood, she decided to go with Traditional Grey.
Sponsored
Metal Technology exemplifies best practice at Leeds College of Building

Metal Technology exemplifies best practice at Leeds College of Building

Metal Technology Ltd

Metal Technology has contributed to achieving the desired aesthetic for the flagship Leeds College of Building Campus designed by Fuse (Leeds). The scheme utilised Metal Technology’s System 17 High Rise capped curtain walling and incorporated manual and automatic 4-20Hi+ casement opening vents. System 5-20D Hi+ doors completed the range of products used. These systems combined to deliver complete design flexibility, achieving not only a very high level of thermal performance, but also exceptional structural, security and acoustic performance. All Metal Technology systems comply with the latest British Standards and are Secured by Design certified.
Sponsored
Aluminium decking fire-safe replacement for flammable composite balcony decking

Aluminium decking fire-safe replacement for flammable composite balcony decking

AliDeck

Recent installation to a low-rise block of flats in High Wycombe. With flammable composite decking on the balconies, the building owner was keen to find a non-combustible alternative and our aluminium decking system was just the ticket!
Sponsored
Stratford-upon-Avon Racecourse - Rustic Decking, Grey Hollow & Solid Contemporary Decking, Balustrades & Saige Subframe

Stratford-upon-Avon Racecourse - Rustic Decking, Grey Hollow & Solid Contemporary Decking, Balustrades & Saige Subframe

SAiGE Longlife Decking

Stratford racecourse has utilised Saige products (Saige rustic decking, Saige Hollow & Solid Contemporary Decking, Saige subframe and Saige balustrade - spindles and glass options) for their outside dining area, winners podium, photo image area, wheelchair viewing area, tv camera areas and main walkways.
Sponsored
Home House

Home House

The Outdoor Deck Company Ltd

Home House is an award winning private members club, located in Portman Square, London. The Outdoor Deck Company were commissioned to install over 220sqm of new Ecodek composite decking on Buzon support pedestals to create a large decked terrace area within the club’s private garden. Home House were looking for a durable, minimal-maintenance, anti-slip deck with superior safety qualities without compromising on aesthetics for this glamorous outdoor space. The carefully selected Ecodek Heritage composite deck boards delivered all this and more….
Sponsored
Laminate Metal Lockers at St James

Laminate Metal Lockers at St James

Helmsman

St James School is part of Ted Wragg Multi-Academy Trust, with their mission is to provide students with excellent education and to build their communities. The school provides its students with the tools they need to use their education to become the best versions of themselves, succeed in rewarding occupations, and create wonderful lives.Helmsman manufactured and installed 245 four-compartment Laminate Metal Lockers. The specification of the lockers was 1775mm high, 300mm wide, and 450mm deep. When the lockers were being manufactured, the school requested that they have a sloping top. Sloping tops are a common choice for school lockers because they reduce the accumulation of dust and allow for storage without risking a safety hazard if something falls off.The laminate Metal locker was manufactured with the body to be metal and the doors to be laminate. The body of the lockers was coated in our standard colour of ‘Ice’. Whilst the doors were powder coated in Blue Iris, Blue Tiber, and Paradise Blue, which symbolised the colours of the school. The lockers were finished with oval number plates above the Camlocks, which is a fantastic choice for school lockers as the students will feel assured that their personal items are safe in their laminate metal locker.Laminate Metal lockers are fantastic materials for school lockers as they give the look of freshness and stylish as the material of laminate doors does better withstanding dents, and scratches and can be more long-term for the schools.
Sponsored
Gardens of Peace

Gardens of Peace

The Outdoor Deck Company Ltd

Founded in 2002, the Gardens of Peace Muslim cemetery is located in a green belt area in Chigwell, London. Beautifully landscaped and purpose-built, the cemetery is a calm, comforting space for the local Muslim community. Earlier this year the Outdoor Deck Company were commissioned to supply and install high quality composite deck boards to create a large deck area surrounding the new cemetery building. Providing an attractive but future-proof solution, composite decking was specified for its anti-slip, mould-free and low-maintenance attributes providing a safe, less slippery surface for the year-round cemetery visitors.
Sponsored
McMillan House Apartment Decking

McMillan House Apartment Decking

EnviroBuild Materials Ltd

A large commercial client of EnviroBuild required a contemporary and low maintenance decking solution for their purpose built flat refurbishment project in South London. The decking would be supported over a flat roof surface, plug on balconies and garden decking areas, so required a versatile decking bearing system.The SolutionThe project used 400 m² of Hyperion Granite Pioneer decking installed on a sub-frame made of non-rot Manticore recycled plastic lumber. To support the decking over the low profile balconies and taller flat roof sections, adjustable decking supports were used. The various sizes of pedestals, allowed both very shallow decking heights and other sections to be supported securely with minimal installation time.Customer FeedbackThe client loved the look of the Granite Pioneer decking against the classic redbrick building. Combined with the modern glass balustrade, they created the perfect outdoor living spaces.Project DetailsSize: 400 m²Product: Granite Hyperion Composite DeckingSubstructure: Mesa Adjustable pedestals & Manticore Plastic LumberLocation: London
Sponsored
Laminate Metal Lockers at Isca Academy

Laminate Metal Lockers at Isca Academy

Helmsman

Isca Academy is Part of Ted Wragg Multi-Academy Trust to raise the aspirations and outcomes for their students enabling them to become fulfilled, and confident students. The school prides itself on being a true full school with students having a broad range of skills and ambitions on entry. Helmsman supplied and installed 205 four-compartment Laminate Metal Lockers. The specifications of the lockers were 1775mm high, 300mm wide, and 450mm deep. The school requested a mixture of sloping top and flat top. Sloping tops are a popular option for schools as they can prevent safety hazards as items can’t be stored on the top as well as accumulation of dust and dirt.It was requested to have a Laminate Metal Locker. The metal body of the lockers was coated in our standard shade of ‘Ice’. Whereas the Laminate doors were powder coated in Paradise blue, Yellow Crisp, Orange, and Hot Pepper. The laminate metal lockers were finished with oval laminated number plates above the Camlocks. Camlock is a great lock option for school lockers as it secures students’ personal belongings safe.Laminate metal lockers are a great option for schools since the material gives the look modern and sleek. In addition, the material will hold up better to dents, scratches, and other damage over time, which is an excellent material for schools as it can last long term.It was great working with Ted Wragg Multi-Academy Trust on this project again! Get in touch today if you have a similar project, give us a call at 01284 530 427.
Sponsored
Garden Pavilion Decking

Garden Pavilion Decking

EnviroBuild Materials Ltd

For two existing units, a delicate garden terrace pavilion provides additional kitchen dining space and outdoor utility.Project BreakdownThe pavilion is set inside a planted terrace with special focus put on complimenting the existing structure with a delicate palette of materials.Customer FeedbackPioneer Granite Composite Decking set a muted charcoal backdrop for a stage of vibrant vegetation. The sustainable credentials of the materials reflect the harmony of the natural overgrowth and the use of Manticore plastic lumber and MESA Decking Pedestals ensured quick and easy installation.Project DetailsSize: 75 m²Product: Granite Hyperion DeckingSubstructure: Manticore Plastic Lumber, MESA Adjustable Decking PedestalsClient: Birds Portchmouth Russum ArchitectsLocation: London
Sponsored
Godalming College - A solution to slippery decking

Godalming College - A solution to slippery decking

Watco UK Ltd

Project DetailsGodalming College in Surrey had a problem with slippery decking on their campus. It is a highly trafficked area in the middle of the campus and is used as a seating area at lunchtime for staff and students. In dry weather the area does not cause any concerns but in wet or frosty weather the potential for slip hazards was huge. The college had used Watco products on internal floors so they called us to ask for advice. Our Solution"Slippery decking is a major safety issue throughout the year, but more so during winter months." An alternative solution was needed as the college had tried applying anti slip coatings (recommended by another supplier) but these had been applied to slightly damp wood and had flaked off. The potential slip issue was increased by the fact that the decking did not have any grooves in the top surface to offer traction underfoot. To solve these issues, Watco recommended and supplied 50mm wide GRP chamfered edge decking strips.The stone coloured strips were chosen to allow the strips to blend in with the decking but still provide the all important slip resistance underfoot, yellow strips are used to highlight the edges and steps to help meet DDA regulations. The strips are supplied already pre-drilled so the installation was completed in just two days over the Easter break allowing the area to be put back into service in plenty of time for the start of the new term. 
Sponsored
Non-combustible aluminium decking- Acton Gardens

Non-combustible aluminium decking- Acton Gardens

EnviroBuild Materials Ltd

We provided 260m² of our Hyperion non-combustible aluminium 145 Pro-Grip Decking for Acton Gardens Phase 9.2. Acton Gardens is the regeneration of the former South Acton Estate - this particular phase consisted of a 15 storey structure, totalling 203 units. This project demonstrated an amazing approach to mindful practise through fantastic external appearances and brilliant work with the local community. The assurances made in terms of the environment, safety, and personnel were outstanding.Our client sought a dependable and contemporary non-combustible aluminium decking for their residential balconies. The hidden fastener system used in conjunction with Hyperion 145 Pro-Grip provided a robust flooring solution with a crisp finish that could easily be installed on aluminium joists. The end result is balcony flooring which fulfils legislative requirements as well as our clients aesthetic desires.Project DetailsSize: 260m²Colour:Anthracite GreyProduct:145 Pro-Grip Aluminium DeckingSubstructure: Aluminium JoistsLocation: LondonClient: AYM Services
Sponsored
Laminate Metal Lockers at St Luke’s

Laminate Metal Lockers at St Luke’s

Helmsman

St Luke’s Church of England School is part of Ted Wragg Multi-Academy Trust. They are all about their community to treat one another with dignity and respect and follow their Christian ethos. The school prioritises making students under their care to know and feel that they are highly valued as human beings and are worthy of an outstanding education.Here at Helmsman, we have manufactured and installed 179 four-compartment laminate metal lockers. The specification of the lockers was 1775mm high, 300mm wide, and 450mm deep. The school requested for the lockers to have a sloping top when they were fabricated. For school lockers, sloping tops are a popular option as they prevent the increase of dust and prevent the top of the lockers from being used as storage which can create a safety hazard if any items fall off.The school requested for the body of the locker to be Metal, and the door was to be Laminate. The doors were coated in multiple colours between Paradise Blue, Yellow Crisp, Orange, Hot Pepper, and Stone Grey, and the body of the lockers was powder coated in our standard colour ‘Ice’. The lockers were all finished with oval number plates above the Camlocks which is a great choice for school lockers as students can feel secure that their belonging is safe in the laminate metal lockers.Laminate metal lockers are an excellent choice for school lockers as it’s modern and stylish. Additionally, the material will do better at withstanding scratches, and dents.
Sponsored
Islington Square, London

Islington Square, London

The Outdoor Deck Company Ltd

The Outdoor Deck Company are delighted to have started work at Islington Square. Located in the heart of Islington, Islington Square is set to become one of London’s newest residential neighbourhoods. The former Edwardian Mail Centre and Post Office buildings are being transformed into a selection of apartments, maisonettes and penthouses including high-end retail units and restaurants. The Outdoor Deck Company have been commissioned to supply and install premium grade Ipe timber decking for the eleven Penthouse roof-top gardens, which include `endless` swimming pools and private decked entertaining areas.
Sponsored
Beech Cottage - UK

Beech Cottage - UK

The Outdoor Deck Company Ltd

The owners of Beech Cottage, a private residence located in Maidenhead commissioned us to install a composite deck spanning the back of their newly refurbished family home. The project involved the removal of the old deck and frame. Our in-house team designed a brand new 100sqm deck area including steps and facias to the rear and side. The new Durapine posts and joists were installed to create a solid raised frame to prevent rotting. High quality Composite deck boards were chosen for their durability plus they require minimal maintenance which was important to the client.
Sponsored
Metal pipe boxing protects sprinkler pipework

Metal pipe boxing protects sprinkler pipework

Pendock

Metal pipe boxing from the Pendock Profiles range is being used at a London tower block to conceal and protect fire sprinkler pipework, cabling and other services as part of a fire safety upgrade and refurbishment programme.Bespoke manufactured to the exact dimensions and project requirements, the metal boxing is non-combustible, which makes it suitable for use in public areas, such as lift lobbies, landings and corridors, where no sprinkler heads are present.Finished in white PPC, the metal pipe boxing not only improves the overall aesthetics, but also provides durable protection for pipework and services, while the integrated hinged inspection panels allow easy access for routine checks and maintenance.
Sponsored
Google HQ King's Cross, London

Google HQ King's Cross, London

The Outdoor Deck Company Ltd

The current Google HQ, with vast external floor space over several levels. The decking is a bespoke solid section 230 x 30mm composite, commissioned for this site. All fixings are hidden, giving a seamless look to the terraces, and clean lines. The main terrace areas are level and by using the DPH slope correction system, the wheelchair access ramps were easily achieved. A clever feature; the BM Unit travels over the decking, hiding the steel rails below. This enlarges the overall usable terrace space considerably, and gives uninterrupted views from the entire terrace.
Sponsored
Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex

Dura Composites Ltd

Dura Deck Flip® Composite Decking | Case StudyOver the past six years this Georgian property has been lovingly restored by Ciara and her husband Ben, including underpinning work to the foundations and a new roof.Journalist Ciara’s passion for the unique and creative really shone through in her design for her composite decking area. With a love for creamy based neutrals to complement the earthy red brick tones the house, she chose pretty Dura Deck Flip composite decking in the colour Weathered Cedar for the main decking area. UV resistance, scratch and stain resistant and with a Class C fire rating, it was installed on rot-free Dura Deck Aluminium pedestals and bearers for a low-maintenance ‘fit-and-forget’ decking solution.
Sponsored
Royal Opera House

Royal Opera House

Alfresco Floors Ltd

On the fourth floor of the Royal Opera House is a fourth floor decking area of around 600sqm. Originally a rest area for staff at the Royal Opera House, the decking area was to be re-purposed as part restaurant, part relaxation area, part meeting space and part open air dance training studio. Alfresco Floors were commissioned to supply and install the Grad Decking System supplied by Alfresco Floors. The finished deck is part of a major transformation of the Royal Opera House by Stanton Williams and has been open to the public from September 2018.
Sponsored
Walsall - Metal Roof Coating

Walsall - Metal Roof Coating

Liquasil Ltd

This 6,500m² metal roof at Axcess 10 Business Park, Walsall was soiled, delaminating and affected by spot corrosion in numerous areas, which would have eventually spread and perforated the sheets if a treatment was not applied.Bosworth Cladding Services Ltd ensured that the roof was cleaned and the peeling factory finish was removed with a 4000 psi pressure washer. The laps were ground back and primed as necessary.The whole roof area was then coated with Liquasil's single-coat BBA Certified Metalseal 20 system to provide a 20 year product guarantee upon completion.The completed installation left a metal roof on its way to failure looking brand new, with a protective silicone coating that will last 20 years.For more information, or to make an enquiry, contact Liquasil on 0121 709 5352.
Sponsored
Spitfire Homes Head Office - using Saige Solid Grey Decking & Subframe System

Spitfire Homes Head Office - using Saige Solid Grey Decking & Subframe System

SAiGE Longlife Decking

Spitfire Homes chose to use Saige's Solid Grey Decking board for their walkways between offices to create a sleek and safe space.

Showing 1-36 of 782

Feedback