NBS Source
I'm a manufacturer

"fan"

349 results found

Sort by:

Showing 1-36 of 41

Sponsored
8 Bishopsgate Part 3: Fan Coil Units

8 Bishopsgate Part 3: Fan Coil Units

FLOCONTROL LTD

The 51 storey tower in the heart of London’s financial district will offer 52,900m² of office, retail and event space. Sustainability has been a key design driver, aiming for a BREEAM Outstanding Rating. Only the most energy efficient technology will be considered to deliver on the BREEAM Outstanding Rating objective. In line with the building’s sustainability design strategy, Belimo EPIVs were specified to be fitted on the Fan Coil Units. A space-saving flushing bypass assembly that incorporated the EPIV and fitted well over the drip tray of the Fan Coil Unit was required. The successful supplier had to work closely with the fan coil unit manufacturers to design the most compact, space saving configuration for the Fan Coil Unit of choice.FloControl offers a prefabrication service, liasing with any Fan Coil manufacturer to work out the best-fitting configuration for the model selected, incorporating any control valve including the EPIV into a DZR ByPass configuration assembled with FlowCon component parts. FloControl was appointed to prefabricate 2500 FloSets Contract for the entire building. FloControl was able to not only incorporate the specified control valve, but also offer bespoke copper pipe connections, saving space, as well as a reliable management process, for testing, pallet and product labelling as well as the call-offs.
Sponsored
Crystal Palace Football Ground Fan Zone

Crystal Palace Football Ground Fan Zone

Buzon UK Ltd

Crystal Palace Football Club play at the legendary Selhurst Park Stadium, based in London. Crystal Palace Football Club has created a brand new 900m² `Fan Zone` which is divided into various settings, including stages, a huge LCD screen, dining areas, shops and a football skills exhibition space. Buzon UK were specified to supply the components to achieve the high live load requirements, which included voids of up to 500mm. The DPH Pedestal system was used, along with the Alfresco Floors Ebema range of high impact concrete pavers. Other areas on pedestals include artificial turf lawns, stages, walkways and ramps.
Sponsored
Organisation for all baking fans

Organisation for all baking fans

Blum UK

Organise your baking accessories.
Sponsored
Droylsden Marina Apartment Mechanical Smoke Ventilation

Droylsden Marina Apartment Mechanical Smoke Ventilation

Powrmatic Ltd

OverviewMechanical Smoke ventilation system designed and installed by Dyers Environmental Controls Ltd at Droylsden Marina.Project BackgroundThe Wharf, set alongside Droylsden Marina offers a collection of modern 1, 2 and 3 bedroom apartments which required a mechanical smoke ventilation system. Dyer Environmental Controls Ltd supplied and installed a mechanical smoke ventilation solution in a Watkin Jones Homes development. The fully automatic EN certified system allows safe escape for residents and clear access for firefighters.Project SolutionDyer Environmental Controls Ltd supplied and installed a mechanical smoke ventilation solution in a Watkin Jones Homes development. The apartment block has 6 levels connected by a central staircase. Dyers installed EN certified dampers to each floor along with local smoke detection. The fans were placed within the smoke shaft with a Powrmatic N-SHEV Roof Opensky louvred ventilator situated above them, providing weather protection. A control panel operates the duty and standby fans. Two AOV smoke dome vents are in place to provide smoke clearance, one located on level 6 and the other on the central staircase.Project ResultThe Powrmatic open sky louvre is situated above the smoke extract fans, providing weather protection. If smoke is detected in the building the system will open the corridor AOV, smoke shaft damper, head of stair vent and open sky louvre. The duty fan will run to extract any smoke located in the corridor. In the event of a power failure the standby fan will engage. Dyer’s fully automatic system allows safe escape for residents and clear access for firefighters.
Sponsored
Barnsley FC

Barnsley FC

HD Sharman Ltd.

The Plygene Gutterline system guarantees an end to leaks after years of wet seats for Barnsley FC fans.
Sponsored
SuperLag Quietslab used at ExxonMobil Oil Refinery

SuperLag Quietslab used at ExxonMobil Oil Refinery

CMS Danskin Acoustics

CMS DANSKIN ACOUSTICS recommended a bespoke combination of industrial acoustic materials to ensure noise at work compliance at ExxonMobil Oil Refinery. The ChallengeFawley Oil Refinery is the largest oil refinery in the UK. When ExxonMobil found that the noise output from two industrial fans at the refinery exceeded the levels specified by The Control of Noise at Work Regulations, it consulted CMS Danskin Acoustics for advice. To ensure the most cost effective and high performing materials were specified, CMS Danskin Acoustics evaluated the noise reduction required on-site. Evaluation of the acoustic data revealed that noise levels in excess of 118dB at 125Hz were being emitted by the fans. Based on these criteria, the technical team at CMS Danskin Acoustics recommended the use of a combination of specialist materials from its industrial acoustic range. The SolutionTo control the low frequency-biased sound, CMS Danskin Acoustics recommended and supplied the SuperLag Quietslab Laminate with Acoustic Barrier Type WB10 combination for the fan casings and associated ductwork. Creating a multi-layered, high performance system, two layers of SuperLag Quietslab Laminate, totalling 250mm thickness, with a core of 5mm Acoustic Barrier Type WB10, were bonded onto the fan casings and ductwork. A direct coupled lagging system, SuperLag Quietslab Laminate comprises long-stranded mineral fibres thermo-set with resins for the absorption of sound at the surface, as well as a high mass inner acoustic barrier core to reduce the transmission of sound through the material. Manufactured from a weight-enhanced, high-density material, Acoustic Barrier Type WB10 provides a flexible and cost effective treatment for chemical and refinery applications. In total, 1,000m2 of the SuperLag Quietslab Laminate/Acoustic Barrier Type WB10 materials were installed around the fans and ductwork to achieve the high levels of sound reduction required.ResultsThe high performance bespoke system specified by CMS Danskin Acoustics, significantly reduced the noise generated by the fans. This enabled ExxonMobil to comply with The Control of Noise at Work Regulations by bringing noise levels under the 85dB compliance level.
Sponsored
Schroders London Wall Place London

Schroders London Wall Place London

FLOCONTROL LTD

Large scale project featuring 1036 Fan Coil Units with FlowCon Green PICVs and E-Just ABVs.
Sponsored
Walkie Talkie 20 Fenchurch Street London

Walkie Talkie 20 Fenchurch Street London

FLOCONTROL LTD

Features an early design of the FloSet Compact with Strainer. FlowCon Green PICVs for Fan Coil Units, Heat Exchangers and Air Handling Units.
Sponsored
Fidelity Offices Cannon Street London

Fidelity Offices Cannon Street London

FLOCONTROL LTD

Features early versions of FloSet Compact, FloSet 80 PICV and FloSet 105 for Fan Coil Units, Air Handling Units and CRAC Units.
Sponsored
No.1 Court All England Lawn Tennis and Croquet Club

No.1 Court All England Lawn Tennis and Croquet Club

FLOCONTROL LTD

PICV and ABV EOL Valve sets for the Fan Coil Unit Installation and Air Handling Units as the retractable roof was installed over No.1 Court.
Sponsored
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Kompozit'All UK

application area: domestic heatinguse type: gas fireplaceproject scope: reline leaking chimneys while maximising the flue sizeadded value: 25-year guarantee on liner, no need to fit and maintain chimney fansBackgroundTwo chimneys failed the smoke test in this heritage property located in Hertfordshire. The chimneys had to be lined to comply with fire safety regulations. Domestic chimneys often require a chimney fan after lining as traditional rigid liners restrict much of the original flue opening. Chimney fans can be expensive to fit and maintain. FuranFlex-25 linings use the maximum flue opening, which often means there's no need to fit a noisy fan.Statement of workThe had to line both chimneys and prevent further leaks before the gas fireplaces could be fitted. This was achieved using FuranFlex-25 RWV liners, which are rated for operating temperatures up to 450 degrees C. The liners were specially produced to fit the flue diameter and length, accommodating any flue bends. The soft FuranFlex liners tube are inflated using pressurised steam which will gently push the liners to extend into the chimney flue. Inflating with steam will also cause a chemical reaction which sets the material harder than steel. The finished liner is smooth, jointless and highly corrosion resistant. Thanks to the expert installation and strong product quality control, both liners are guaranteed to work for 25 years.
Sponsored
The London Fruit & Wool Exchange

The London Fruit & Wool Exchange

FLOCONTROL LTD

Showcases our capability to supply large scale projects with a mix of product for Fan Coil Units and Air Handling Units and and to liaise with third parties (FCU manufacturers), to meet complex call off schedule deadlines.
Sponsored
Manufacturing Facility Heating- Manchester

Manufacturing Facility Heating- Manchester

Powrmatic Ltd

OverviewPowrmatic was selected to supply a manufacturing facility heating system in a new 60,000sq.ft building in Manchester which was expertly installed by our trusted and long-standing engineers at Swiftheat Gas Services Limited. Four LX60 heaters, one LX90, and eight CECx4500 destratification fans were installed into the facility.Project BackgroundSystem 3 Limited, a leading manufacturer of high-specification insulating glazing sealed units and toughened-laminated glass, was expanding production into new premises. They needed a reliable and efficient heating solution for their newly refurbished premises. Swiftheat was recommended by Powrmatic, a family-run business with a reputation for providing commercial heating solutions and industrial heating installation.SolutionSwiftheat Gas Services Ltd provided a complete installation of the heating system for System 3’s new premises. The installation consisted of 5 ErP-compliant suspended LX60 and LX90 warm air gas heaters and eight CECx destratification fans to assist with air circulation. The building size was 60,000sq.ft, and the entire project required an 88.9mm stainless steel gas line.ResultSwiftheat Gas Services Ltd provided a complete installation of the heating system for System 3’s new premises. The installation consisted of 5 ErP-compliant suspended LX60 and LX90 warm air gas heaters and eight CECx destratification fans to assist with air circulation. The building size was 60,000sq.ft, and the entire project required an 88.9mm stainless steel gas line.
Sponsored
FalcoBloc Picnic Table - Manchester City Football Club

FalcoBloc Picnic Table - Manchester City Football Club

Falco UK Ltd

Back in 2010, the picnic tables formed part of the club’s new development for a City Square entertainment zone, a vibrant and state-of-the-art fan experience which was a new concept in British football, located on Joe Mercer Way outside the City store. Thirty nine FalcoBloc benches were supplied along with another 20 robust FalcoSwing tables to form a seating and ‘perch’ arrangement at the Blue Moon Café. 
Sponsored
Old Trafford

Old Trafford

Lionweld Kennedy Group

Lionweld Kennedy designed, fabricated and supplied the vomitory stairs and handrails for Old Trafford, the home of Manchester United, East Stand Development.Due to an expansion in 1999, Manchester Unites ground undergone works to add a second tier to the East stand of Old Trafford, this increased the capacity to 61,000.We supplied and designed the stairs to ensure all fans were comfortable, while ensuring all health and safety standards were met.
Sponsored
Woking Shopping Centre - THGT

Woking Shopping Centre - THGT

S&P UK Ventilation Systems Ltd

Woking Borough Council instructed main contractors Sir Robert McAlpine who then engaged Airflow Design Services to carry out the design, supply and installation of Market Walk’s smoke extraction system at Woking Shopping Centre in Surrey. S&P UK Ventilation Systems was selected to support the new smoke extraction system by providing smoke axial flow fans which also help to optimise ventilation and indoor air quality.
Sponsored
Nando's Warrington

Nando's Warrington

INTRAsystems

Those wanting their PERi-PERi fix in Stockton Heath can now rest easy as NANDO’s has re-opened following its refurbishment last month. What better way to open the doors to the starving PERi PERi fans than by making a great first impression on them as they enter the restaurant with our innovative INTRAshape Entrance Matting system – the first installation of our brand new product! Read more in our latest case study
Sponsored
Crystal Palace FC Training Ground

Crystal Palace FC Training Ground

GDL Air Systems Ltd

This multi-million-pound training facility at CPFC’s new-look academy includes a full-size indoor 3G training pitch.A state-of-the-art indoor training facility that will allow the football players to train in all weather conditions. GDL were approached to help with the ventilation requirements for the space. Six large rectangular recessed louvres were manufactured and installed to meet the demands of extracting the air from the indoor space generated by eight large fans each with a duty of 12900 m³/hr. 
Sponsored
Naylor supply lintels to Rolls Royce project

Naylor supply lintels to Rolls Royce project

Naylor Concrete Products Ltd

Naylor Concrete Ltd supplied Ultrafire and HiSpec Lintels to the Rolls-Royce project in Washington. Miller Construction has landed the contract to build a multi-million pound Rolls-Royce factory in Sunderland. The 20,000m2 facility, at Washington’s Radial Business Park, will manufacture fan and turbine discs for jet engines and is expected to be ready for production to start late next year. The construction contract, thought to be worth £35m, is part of a £950m five-year-investment programme on the part of the company.
Sponsored
Church Cottage

Church Cottage

PARTEL

This ventilation system was key for this oak frame cottage in Herefordshire. After achieving an airtightness of 1.51, it was imperative to integrate ventilation to ensure the cottage was as energy-efficient and comfortable as possible.Partel consulted with Oakwrights to design a smart ventilation system that improved air quality and reduced energy costs. LUNOS e2 heat recovery ventilation units supplied by Partel were installed in all living spaces such as the living room, kitchen, and bedrooms. The versatile installation option, extremely compact fans, and highly energy-efficiency operation made them ideal for this residential project.
Sponsored
London Olympic Stadium

London Olympic Stadium

Brett Martin Daylight Systems

The Olympic Stadium’s transformation into a multi-use stadium has seen the specification of Marlon CS polycarbonate rooflights. The 44,000m² roof is the largest cantilevered roof worldwide and includes 4,484 polycarbonate sheets. The project was a feat of production and delivery logistics with each sheet cut to size forming 2,756 unique shapes and labelled with a unique placement code to ease installation. With the stadium width 84 metres at its deepest, the transparent roof covers all 54,000 spectator seats protecting fans from the elements as well as ensuring optimum grass growth for pitch perfect conditions.
Sponsored
Consider colour outdoors with Sandtex Trade

Consider colour outdoors with Sandtex Trade

Sandtex Trade, product of Crown Paints Ltd

With thousands of shades available across the paint range, all backed by time-proven and trusted formulas, Sandtex Trade brings colour and protection outdoors for trim and masonry paint projects. The Sandtex Trade shades available are featured in the Crown Trade colour fan deck, which places them in colour families for easy reference, enabling specifiers to see the options at a glance. Further advice can also be gained by using the Crown MyRoomPainter® app which is designed to enable property professionals to offer instant schemes using a smartphone or tablet to show how any palette will look in situ.
Sponsored
Universe – Norburg, Denmark

Universe – Norburg, Denmark

Redlynch Leisure Installations Ltd

Sliding, climbing & water play in one facility is not possible? Sure, it works! And how! In the Universe we show you how. Four K&K pumps distributed over more than 50 m of water feature around the Universe Lake provide fun in summer, where hardly anyone – in the truest sense of the word – stays dry. More water play is not possible! Right in the middle of this ingenious playground is our facility, where up to one hundred children can play at the same time. Embedded in a huge area of special fall protection gravel, this is the dream for all water play fans.
Sponsored
Aviation Hangar Heating - Boscombe Down

Aviation Hangar Heating - Boscombe Down

Powrmatic Ltd

OverviewA successful installation of 40 x Powrmatic SRP U Tubes at a hangar facility in Boscombe. With the system design by Powrmatic, ABS, a leading HVAC and installation company, was entrusted with this significant installation project. The installation aimed to provide efficient heating performance, reduce energy costs, and improve the overall comfort and functionality of the hangar.Project BackgroundThe Weighbridge Hangar Building 499 at MOD Boscombe Down operated by QinetiQ required a new heating system due to the life-expired existing system. The hangar required a powerful heating system that would operate efficiently during the cold winter months while reducing energy costs. A new Powrmatic SRP U-tube herringbone radiant heating system was produced in line with the design intent of WYG on their tender documents. J & B Hopkins secured the M & E contract and employed the services of ABS Ltd to undertake the installation of the radiant heating system. ABS Ltd, formed in 1978, offers a full range of professional services including the installation and maintenance of both radiant and warm air heating systems to both commercial and industrial properties throughout the UK.SolutionThe MOD hangar facility, situated on an exposed location, at Boscombe Down required a robust heating solution to withstand the cold winter months. 40 Powrmatic SRP radiant U Tube PVU50 Hi/Low heaters each rated at 50kW on a herringbone system layout with ducted fresh air onto each burner to comply with fire safety standards were installed by ABS Ltd. To maximize efficiency, the heaters mounted at an impressive height of 23 meters in line with Powrmatic’s design drawings were arranged in 8 lines of 5, with 3 heaters connected to one fan and 2 heaters connected to another fan. The heating system incorporated Powrmatic MC200 controllers and black bulb sensors for precise temperature control across the hangar.ResultThe final stage of the installation was completed by J & B Hopkins, arranging for the necessary gas and electrical distribution services to the radiant heaters and discharge fans. The 40 Powrmatic SRP radiant U Tubes installed by ABS Ltd effectively heated the facility, providing a comfortable and conducive environment for the workforce during the winter season. Additionally, the new heating system reduced energy costs and eliminated the need for multiple exhausts on the rooftop hence retaining the aesthetic design principles of the hangar. The commissioning was successfully carried out when all services were completed, providing a satisfied client with a capable heating installation within the hangar, for the exposed site location.
Sponsored
Chelsea Football Club Westview Hospitality

Chelsea Football Club Westview Hospitality

Knauf Ceiling Solutions Limited

Blue Is the ColourChelsea Football Club stadium’s refurbished Westview Hospitality Area represents the biggest single investment in years and is hailed a triumph by enthusiastic club supporters.To dramatically improve the match day experience of fans by providing new state-of-the-art hospitality facilities at Chelsea’s landmark stadium in London.Merging two small hospitality restaurants with an upper Guest Area concourse area into one single wide open plan space represented a technical and design challenge.Now on offer: a new welcoming open and flexible concourse, two panoramic bars offering views of the stadium interior and west London, with ample room to take a seat, new comfortable padded seats in the stands and three additional video screens.
Sponsored
Our Contribution to Cwmglas Primary School Retrofit Project

Our Contribution to Cwmglas Primary School Retrofit Project

Towelrads

In February of 2022, Towelrads embarked on a collaborative venture, joining a 36-month ongoing initiative aimed at retrofitting Cwmglas Primary School. To ensure minimal disruption to the school’s daily operations, this project has been thoughtfully divided into several stages.Stage 1The initial phase, designated as Stage 1, focused on the top floor of the school premises. Specifically, attention was directed towards the music education and nurture rooms situated on this level. A noticeable difference in temperature existed within these spaces, making them colder than other areas throughout the school. These rooms sported aging standing convector heaters, rendering them ineffective. Furthermore, the characteristics of the building’s construction, the room dimensions, and the heat load posed challenges that rendered conventional low surface temperature radiators insufficient.In response, the decision was made to utilise the Towelrad TZT convector heater equipped with an integrated fan. This selection proved suitable for the low-temperature wet heating system, offering an elevated heating capacity. Notably, the rounded edges of the TZT convector heater not only enhanced its aesthetic appeal but also elevated the safety of the products, rendering it an ideal choice for a school.The thermostat-controlled fan speed of the TZT convector heater ensured continuous and responsive temperature management within the room, promoting optimal thermal comfort.Although the solution was successfully implemented within the designated rooms, the challenge persisted in the corridors. Enter our Vertical and Horizontal LST Ultra Radiators, serving as the perfect antidote to this issue. Our Ultra LST radiators deliver impressive heat output while maintaining a low surface area. Moreover, their covers, measuring a substantial 2mm in thickness (above industry standards), guaranteed safety across the entirety of the top floor.The Future: Stage 2With the successful completion of Stage 1, marked by the seamless integration of our products into the design framework, we have been entrusted with an extension of our role into Stage 2. This forthcoming phase encompasses the lower floor of the school, encompassing the dining hall, corridors, and classrooms. This work will be carried out over the summer months so that come the start of the school term the students can tackle the winter months in a comfortable learning environment.
Sponsored
Mercedes F1 AMG Operations Facility

Mercedes F1 AMG Operations Facility

TaperedPlus

Our Team were delighted to have assisted in the designing and supply of a Tapered TR/MG PIR scheme to the F1 Mercedes AMG Operations Centre.It has been the home of the Mercedes-AMG Petronas Formula One Team ever since the three-pointed star returned to F1 with its own works team in 2010. With helping to develop cutting edge technology and assemble the Formula one cars, this facility also homes the Mercedes-Benz applied science, a new operation which leverages the best of aerospace and motorsport technologies to help performances across land, sea, and air.Our design office manager Hitesh Patel loved working on this project: ‘This project based in Brackley, was a nice and simple roof with straight falls, where we utilised a Tissue Faced PIR. Being a massive F1 fan, I was happy to work on this project for Mercedes AMG F1 and I am very much looking forward to the new season as Lewis Hamilton chases a record winning 7th Championship”
Sponsored
Ventilated Nursery, Raised Steel Floor - Gothenburg, SE

Ventilated Nursery, Raised Steel Floor - Gothenburg, SE

Floor Levelling Systems Ltd

SubFloor flooring was used to help renovate, raise and ventilate a 700 m² floor into a Nursery near Gothenburg, Sweden.The Subfloor ventilation system was ideal for this nursery, as it allowed for multiple floor height adjustments and for ventilation installations under the floor. Associated floor ventilation material such as ducts, air distribution strips, fans, etc. was also provided. The negative pressure the ventilation generates under the floor creates a fresh and healthy indoor environment.This simple and elegant solution raised and levelled the floor to allow for installations and insulation. The joist and screw system allows for quick and easy assembly so that the floor can reach the desired height.Products:Steel Joist 45x30x3800 mmSubFloor Screw 100 mmInsulation Bearer 45 mmHeight Variation: 46 - 100 mmJoist separation: c/c 600 mmSystem Weight - c/c 600 mm: 2.06 kg/m²Materials:Steel, Z100 GalvFibre-reinforced polypropylenePoint Load Limit (50 x 50 mm): Between screws over joist - 7.08 kNOver screws over joist - 8.78 kN
Sponsored
OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS

OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS

MIDDAS

BACKGROUNDT-Squared were selected by Oxford Nanopore Technologies as Main Contractor for their new cleanroom production facility on the prestigious Harwell Campus. The production cleanrooms had to be ultra-clean to manufacture DNA/RNA sequencing devices.BRIEFThe production cleanrooms for the sequencing devices required ISO 4 & 7 Classifications and had to meet the stringent requirements for their specialist manufacturing process which are aligned with semiconductor processing. Due to the high level of process services required and strict operating conditions, the cleanroom had to support the specialist services and HVAC solutions to meet the critical operating parameters and production processes.SOLUTIONMIDDAS designed, manufactured, and installed structural cleanrooms from their proven M100/M200 range and specialist M-WOC walk-on ceiling with plenum cap. The M100/M200 framework was engineered to support the sensible cooling coils and HVAC supplies, along with the process utilities used within the facility. The cleanroom wall panels could also be removed to access the services throughout the life of the facility and had inert aluminium cores to ensure the cleanroom classifications were met. A unique feature of the MIDDAS solution was the plenum cap, designed and engineered to support the fan filter ceiling below. Integrated handrails to the walk-on ceilings also ensured a safe maintenance platform.
Sponsored
Emshield DFR System was used at the new Tottenham Hotspur Stadium for Fire Resistant Sealing of the High Movement, Wide Structural Movement Joints

Emshield DFR System was used at the new Tottenham Hotspur Stadium for Fire Resistant Sealing of the High Movement, Wide Structural Movement Joints

NCC – Emseal Movement Joints

Client: Tottenham Hotspur Football Club Design: Populous Main Contractor: Mace Main Products Used: Emshield DFR2 and Emseal Security Seal SSW2Tottenham Hotspur Football Club has moved into its new home which also has a partnership with the American NFL that will see at least two major American football games played at the stadium each season. This was made possible by the innovation of a retractable natural grass pitch, which will be used for Spurs home fixtures and an artificial multi-use surface underneath for the NFL matches, plus concerts and other events. With a seating capacity of 62,000, the Tottenham stadium is designed to ensure that the spectators are closer to the pitch than at any other comparable ground in the UK. It also includes the UK’s largest single tier stand, which will hold up to 17,000 fans in the Spurs home-end. As is typical for modern stadium design, there was a critical requirement for wide and high movement joint sealing systems in several important areas. These included joints in the plant service areas and walkways over prestige VIP and hospitality suites that also had to provide fire resistance, plus the important and often difficult heads-of-doors joints. These requirements were all safely and securely met using Emseal DFR-2 and Emseal SecuritySeal SSW2 respectively
Sponsored
Emseal SJS System installed to seal wide seismic movement joints for the main Stadium at Basra Sports City, Basra, Iraq

Emseal SJS System installed to seal wide seismic movement joints for the main Stadium at Basra Sports City, Basra, Iraq

NCC – Emseal Movement Joints

Client: Basra Sports City, Iraq Project Design: 360-Architecture Structural Engineering: Thornton Tomasetti Main Products Used: EMSEAL SJS SystemThis spectacular 65,000-seat, combined FIFA and Olympic event compliant stadium in the City of Basra, Southern Iraq, is built on geology that dictated the need for substantial seismic stadium expansion joints up to 400mm wide. The Project Design team had good experience on major projects with EMSEAL jointing systems for use in demanding situations such as stadium concourses, so they specified the EMSEAL SJS-Seismic Joint System. Each custom assembly was produced in our Toronto facility to the measured field dimensions for installation according to a detailed plan, with training at EMSEAL’s Boston, USA Training Centre, with a full-size mock-up of a tread-riser-tread assembly to match those in Basra. The EMSEAL SJS System ensures continuity of a watertight seal through changes in plane and direction, whilst accommodating the potentially high movement within the joints and without transferring any tensile stress to the structure. The system is free of any additional hard, noisy anchors or connections and does not present any slip or trip hazards. It also safely accommodates the high point loads of small-wheeled fork lifts and stacker trucks for facility maintenance crews and of course, the food and drink wagons and millions of footfalls per game from the fans. 
Sponsored
Grade II Listed Kitchen Extract

Grade II Listed Kitchen Extract

Kompozit'All UK

application area: commercial kitchen extractuse type: school kitchen air extractionproject scope: line brick duct with four linersadded value: 25-year guarantee on liner, no need to fit and maintain chimney fansBackgroundVentilFlex-25 engineers were to supply and install a bespoke kitchen canopy solution for a grade 2 listed school building in Hampshire. The bespoke canopy could not be fixed to the walls or the ceiling, which was 14 meters high.The 20-metre ventilation shaft had metal supporting crossbars. This made it impossible for any rigid extraction ducting system to be installed without affecting the integrity of the structure. The client opted for a kitchen extraction system with a different approach – VentilFlex-25 RKV – a composite liner solution supplied in a flat and soft state. The bespoke-made liners are useful for ducts where access is difficult or if the duct has bends and offsets.The main challenge of this installation was to insert and inflate 4 VentilFlex-25 RKV liners simultaneously. This way the liners would fill the available duct space evenly and act as a single large liner.Statement of workThe steaming took a few hours, during which the high temperature started a chemical reaction in the composite structure which solidified the resin and gave the liners their final physical characteristics – tensile strength, high corrosion-resistance, high heat-resistance and an air-tight finish. The new VentilFlex-25 RKV liners provide an outlet for the gases coming from 3 combi ovens, 2 range ovens a fryer and a grill.
Sponsored
Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester

Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester

NCC – Emseal Movement Joints

Client: Bruntwood Estates Specialist Contractor: Grade-2 Structural Repairs Main Products Used: Emseal SJS SystemThis busy, multi-storey, prime location, car park is located between Manchester United’s Old Trafford Football Stadium, Lancashire’s Old Trafford Cricket Ground and Trafford House, a 12-Storey commercial development. The businesses use the car park during the week and then it is reserved for MUFC fans on matchdays and weekends. The car park was undergoing scheduled structural inspection, when it was discovered that the traditional compression joints were failing in the wide structural movement joints on the access ramps. This meant they were now leaking and allowing water ingress, which could lead to damaging salt deposits on expensive vehicles, as well as potential corrosion and damage to the reinforced concrete decks and the structural frame itself. These joints needed to be made watertight and accommodate significant horizontal and vertical movement, as well as traffic impact and weathering. The engineers looked for a solution that could safely repair and seal the joints, but with only minimal ramp closure or downtime, and the Emseal SJS System was selected as the ideal solution, as it could be installed in just two short, phased closures at weekends, when there were no home games. In the first weekend, with only one lane closed, the failed compression joint was removed and the joint arrisses made good with fast setting resin, then on the next weekend closure, the bespoke lengths of Emseal SJS were installed with access only required from above.  
Sponsored
Derby Innovation Centre

Derby Innovation Centre

GDL Air Systems Ltd

Project detailsDerby City Council’s new Innovation Centre is at the heart of Infinity Park, Derby’s new 250-acre commercial and technology park.Designed to embrace the characteristics of transport engineering, the centre will play a vital role in supporting companies in the aerospace, automotive and transport industries by helping existing companies to grow and new ones to develop. Project overviewThe Innovation Centre demonstrates its environmental credentials through a number of sustainable features to reduce the carbon footprint. These include GDL natural ventilation products to help provide efficient heating and cooling.GDL worked in conjunction with Derry Ltd to provide and install Intelivent Wall Units and Penthouse Turrets.Designed to meet the ventilation demand of the occupied spaces, our in-house design team assisted making the correct system choices. Our Intelivent products are particularly effective in offices, seminar rooms & workshops where occupancy levels vary throughout the day and a controlled ventilation rate is required.Benefits of using GDL Products on the projectThe Wall Units allow a controlled environment by allowing natural fresh air to enter the building via external weather louvres. The heating coil within the unit is used as a front line heating source during winter.Our Intelivent Turrets offer a balanced supply of fresh air whilst removing warm stale air, an ideal product to ventilate the workshops effectively and efficiently.Intelivent Transfer Fans have been installed to ductwork to assist with the supply and extract of air within the offices and seminar rooms.
Sponsored
Friars Road Student Accommodation Smoke Ventilation

Friars Road Student Accommodation Smoke Ventilation

Powrmatic Ltd

OverviewHead of stairwell High Rise Student Accommodation Ventilation designed and installed by ADS (Air Design Systems) at a brand new student accommodation on Friars Road, Coventry.Project BackgroundTrinity View is a brand-new student accommodation in Coventry with Six iconic blocks for 614 students, all set around a private courtyard which required a smoke ventilation system.Project SolutionADS (Air Design Systems)  installed Powrmatic N-SHEV Stirling natural and smoke ventilators at the head of three stairs along with Stirling vents above the smoke extract fans in two smoke shafts. Along side these smoke ventilators, a Powrmatic N-SHEV Wall Opensky was installed at the head of a separate smoke shaft that terminated in the Façade. The Stirling Casement Ventilators were operated by 24v drive open/drive close actuators opening to 90° and painted to a RAL 7016 colour to match the existing building. The Roof Opensky N-SHEV ventilator was also operated by an electric 24v drive open/drive close actuator with single skin aluminium blades mounted on a turndown base.Project ResultADS (Air Design Systems)  delivered an expectational high rise student accommodation smoke ventilation installation which was handed over on time and in budget with their customer. The student accommodation now benefits from a life safety smoke ventilation system. ADS also provided the smoke shaft dampers, the facade FLW Fieger louvred vents and the full control system for the accommodation. The 4 different sized Stirling Casement ventilators offered 1.04m² (x2) , 1.32m², and 1.15m² Free area to Approved Document B.
Sponsored
Blackburn Rovers Football Club

Blackburn Rovers Football Club

dormakaba UK & Ireland Ltd

A secure and flexible solution with DORVISIONAs part of a programme of reducing maintenance costs whilst improving security across its stadium and ancillary club buildings, Blackburn Rovers FC has launched a new “open and closed doors” policy. As part of the policy, the football club has installed DORVISION, an innovative GPRS based door controls system developed by dormakaba, global leader in the development of door technology products and systems. Enabling the remote opening and closing of multiple doors from one central location, the system has enabled the Football Club to significantly achieve its goals of reduced costs and increased security.dormakaba’s contribution to the projectAn extensive review of the way the club manned the many entrances associated with its estate and the costs involved with using staff to maintain security, highlighted the rising costs associated with manually unlocking and locking its doors plus emergency and regular maintenance visits. Requiring a solution that would cut man hours associated with manually opening and closing doors as well as reduced service costs, and having been satisfied with the dormakaba automatic door controls used throughout the stadium, Blackburn Rovers Football Club turned to the company’s innovative DORVISION solution.DORVISION was installed onto the existing twelve sets of doors which included dormakaba’S automatic sliding door operators ES200 and ES90 and the electro-hydraulic swing door operator ED200. These were located at various parts of the stadium including entrances for fans and players, a reception area and a retail shop. The club had the additional requirement for a retail shop, located offsite in Blackburn city centre which also required a remote opening, closing and locking facility on the existing dormakaba automatic doors

Showing 1-36 of 41

Feedback