NBS Source
I'm a manufacturer

"electrical inspection and testing"

3,044 results found

Sort by:

Showing 1-36 of 655

Sponsored
Scottish Fire & Rescue Service – Fire Door Inspections for Mitie

Scottish Fire & Rescue Service – Fire Door Inspections for Mitie

Fire DNA Ltd

In our first in a series of case studies, we’ve invited FireDNA Alliance Partner, Steve Neilson to share his experiences using the FireDNA system to inspect and catalogue 9422 fire doors in three months, on behalf of Mitie, for the Scottish Fire and Rescue Service.The Scottish Fire & Rescue Service is the fourth largest in the world and ensures the safety and wellbeing of the people in Scotland. Operating out of 547 buildings across 357 sites, these centres are managed by the UK’s largest ‘Facilities Management’ provider Mitie.Following several months of discussion between Mitie and the Scottish Fire & Rescue Service regarding the status of the fire doors across their property portfolio, a tender was issued for an extensive fire door inspection and evaluation programme to be undertaken.Having secured the works through competitive tender, we further engaged with Mitie and the Scottish Fire & Rescue Service team. Working through their property asset registers in detail we gained a full understanding of the scope and requirements of the project.Following weeks of detailed project planning and final agreement on the timeline, it was evident that we had just over 3 months to inspect and report our findings on 9422 fire doors across the 357 site locations, and this all had to be done during the winter months of late 2021 and early 2022.In order to deliver on such a tight timescale, absolute dedication and collaboration was required from all parties…the project managers, admin staff and fire inspectors as well as the teams at Mitie and Scottish Fire & Rescue Service. To support this challenging task we armed our resources with a new cloud based system called ‘FireDNA’.We had been approached by FireDNA a couple of years earlier to see if we would be interested in helping to beta test their new ‘Fire Door Inspection and Monitoring Software’, to which we agreed, little did we know at the time that this software would prove invaluable to us further down the line!Deploying teams of up to 10 Fire Inspectors at a time, armed with the new and now completed FireDNA Inspection and Monitoring App, we set about working through the phased inspection schedule.Having been involved in the development testing of the FireDNA software, we had no doubt this system would, increase the speed in which the surveys were carried out, and dramatically reduce the time and effort in reporting the findings. Working closely with the FireDNA software support team, who assisted us in the initial software training, our Fire Inspectors were able to work efficiently and effectively ‘at pace’ through the challenge. The FireDNA App also has ‘LiveChat’ built in so any questions or queries by our operatives in the field were easily and quickly dealt with by the FireDNA team, which meant there was very little downtime during the inspection process.One of the great benefits of using the FireDNA App is that everything is ‘real-time’ so our office-based project managers could immediately see how the inspections were progressing. Once the inspection data and supporting photography was in the system report generation was largely automated and nicely formatted into MS Word and Excel documents.These reports could then be initially shared internally with our remedial work/replacement estimators for accurate cost estimates, who in turn could then produce accurate cost estimates and quotes for the works required as each buildings inspection was completed. This created a very fast, efficient and accessible workflow process for the whole team.FireDNA is not only a fantastic fire inspection and reporting tool, but also initiates the ‘golden thread’ of information, allowing building owners and managers like the Scottish Fire & Rescue Service and Mitie to take ownership of the ‘live data’ in the system, which can easily be updated and shared as each fire door asset is inspected, monitored and maintained year-on-year, which will soon become the minimum legal requirement.FireDNA also enables building owners and facility managers to create status reports for O&M compliance, which can be shared with insurers and the like, as well as appointing contractors and maintenance teams to carry out and catalogue remedial works and new installations, which are all date-stamped and locked into the system.In our view, anyone involved in fire inspections, installations, planned preventative maintenance and asset recording of passive fire products, such as fire doors, doorsets and fire screens should be using the FireDNA system. For duty holders such as building owners, facility managers, landlords and surveyors to make sure the assets they are responsible for are safe and compliant and the data unambiguous and accessible by all that need it, including residents.We believe FireDNA is the best system on the market and anyone who uses it will appreciate not only the time and money savings but importantly how this centralised system improves work standards across the full lifecycle of passive fire products. Steve Neilson – FireDNA Alliance Partner – Scotland
Sponsored
Electricity House

Electricity House

SE Controls

Electricity House, Crest Nicholson Homes’ stylish city centre apartment development in Bristol is using an advanced smoke ventilation system from leading smoke and natural ventilation specialist, SE Controls, to help keep residents safe if a fire should occur.
Sponsored
Knotwood CWCT Structural testing

Knotwood CWCT Structural testing

Knotwood

Knotwood's interlocking cladding testing: CWCT (Centre for Window & Cladding Technology) Standard Test Methods for Building Envelopes determine the level of serviceability of a façade or rain-screen cladding system when subjected to typical climactic levels of water, air and solid object impact.Knotwood also offers the following benefits:✅ 100% all aluminium systems which are non combustible and compliant with high rise buildings ✅ Powder coating warranty of 15 years ✅ T6 marine grade aluminium which which is corrosion resistant ✅ Interpon, AkzoNobel architectural grade powder coatings
Sponsored
Mary Tavy Hydro-Electric Power Station

Mary Tavy Hydro-Electric Power Station

Eternit

England’s first hydro-electric power station has fitted Eternit’s fibre cement Profile 6 sheeting as part of major refurbishment work.Built in 1932 and based in Tavistock, Devon, Mary Tavy Hydro-electric Power Station generates enough electricity for 2,500 homes, and was once the largest hydro-electric scheme in England.It is owned and operated by South West Water, who took the decision to specify Profile 6 sheeting after realising that the original fibre cement sheets used for the roof of the turbine hall had lasted for over seventy years.
Sponsored
SECURING BRITAIN’S ELECTRICITY SUPPLY

SECURING BRITAIN’S ELECTRICITY SUPPLY

Zaun Limited

Electricity interconnectors play a crucial role in the EU’s strategy to achieve a competitive and integrated European energy market to increase energy security and apply downward pressure to wholesale electricity prices.The 500MW EirGrid East–West Interconnector links the British and Irish markets and brings Britain’s interconnector capacity to 4GW with the 2GW IFA to France, 1GW BritNed cable to Holland and 500MW Moyle interconnector to Northern Ireland.The SolutionThe East-West Interconnector project was financed by a €300 million loan from the European Investment Bank, capital investments from commercial banks, EirGrid equity and a €110 million grant from the European Commission.With such huge sums and massive power in play, security is vital on the 47 miles of subsoil and 116 of submarine cable that connects the Woodland HVDC static inverter plant at Rush North Beach, County Meath, and the Shotton plant on Barkby Beach in North Wales.Zaun secured the two inverter plants for Irish national grid operator EirGrid with around 600 metres of ArmaWeave fencing to 3 metres in height, buried in a concrete cill and combined with a 4.6 metre high Harper Chalice electric fence, which systems integrator Crime & Fire Defence Systems installed.The fence line had to be connected to an intricate underground earthing grid and to incorporate vehicular sliding gates, pedestrian turnstiles and manual gates.ArmaWeave achieves the highest rated standards for fencing defending against forcible attacks. Its unique properties and tight mesh pattern provide no climbing aids and resist cutting attacks with hand, powered and non-contact tools.
Sponsored
Electrically Sliding Biomass Access - Scotland

Electrically Sliding Biomass Access - Scotland

Surespan

Project:Surespan designed and manufactured a massive Biomass access hatch for a fuel plant in Coatbridge, Scotland.ProductBiomass Cover features an opening 3500 (137?) x 4000 (157?) with a sliding cover features fixed external rails and electric operation. A further two sliding covers were supplied sized 2500 x 4000 and 1500 x 4000mm
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
Parvalux Electric Motors

Parvalux Electric Motors

Fixfast Ltd

Designing and manufacturing gearbox motors for industrial uses, Parvalux Electric Motors Ltd is a 75-year-old British manufacturing firm based on the south coast of England.To accommodate existing operations and add capacity for the future, Parvalux repurposed an 8.75-acre brownfield site in Poole that combines both an HQ and factory onto the same location.Work began in 2020 on the 160,000 sq ft site - which includes a £3 million investment in new manufacturing capabilities.Putting it at the forefront of efforts to decarbonise construction, the eco-friendly building has achieved a net zero rating.ChallengeStructural steel and industrial cladding specialists Jade-Aden Services were contracted to deliver the complete design and build of the new facility. Selected through previous working relationships with locally based larger companies, Jade-Aden brought in a local supply chain to complete the project, ensuring high quality throughout the entire project build.SolutionThe large roof and wall area gave Jade-Aden the opportunity to install Kingspan composite panels with the use of Fixfast DrillFast A4/316 stainless steel composite fastener range. Fasteners are irreplaceable and meant to match the lifespan of the construction they sit within, so using A4/316 stainless steel fasteners ensure the lifespan of this building is secure, even though the building is situated in a coastal environment.As a demonstration of Fixfast's continuing commitment to quality, the fasteners were supplied as part of the QuadCore Assured warranty from Kingspan - providing reassurance for the lifetime of the building."Jade-Aden wishes to thank all their supply partners for the support given to deliver the Parvalux project."Jade-Aden Services
Sponsored
Inverness COVID-19 Testing Centre

Inverness COVID-19 Testing Centre

CLD Physical Security Systems

Since the COVID-19 outbreak, CLD Fencing Systems has helped to protect a number of testing centres and temporary hospitals. So earlier in 2020 we were contacted to help protect a testing centre that was being constructed in Inverness. This site offered key workers the ability to use the drive thru centre as part of the UK wide Government Scheme. The client needed a full perimeter fence line which was completely temporary and could be moved and dismantled as fast as it was installed. They also needed the system to offer visitors privacy whilst they attend the site. The original FenceSafe Temporary Fencing System was selected for this project, offering a rigid security demarcation with additional privacy screens.
Sponsored
Engineer puts greener heating solution to the test for comfort and economy

Engineer puts greener heating solution to the test for comfort and economy

Daikin Ltd

ngineer puts greener heating solution to the test for comfort and economy 
Sponsored
Eurocell passes the test at flagship student residence

Eurocell passes the test at flagship student residence

Eurocell plc

Winvic made an educated choice when they specified Eurocell windows and panels for a landmark Coventry development. CODE Students Coventry is a flagship 23-storey accommodation block which, topping off at 76m, is the highest in the city. Such a lofty achievement called for materials of equally high standing. Not only to shrug off the elements and maintain thermal efficiency. But also to cope with the rigours of student life without losing its looks. Winvic understood that only a bespoke Logik tilt and turn widow system, designed in close collaboration with fabricator and installer Astraseal, would pass this test.
Sponsored
RIA Building – Semi Electric Movable Wall – London

RIA Building – Semi Electric Movable Wall – London

ModernGlide Ltd

Completion of 3 number MG100 Semi Electric Movable Acoustic Walls in the RIA Building London. Flexible space of 1 large room and with the use of 3 movable walls where 1 meets at a right angle now gives the client a 3 flexible rooms. Two access inset door panels in the larger run allows for access in-between the rooms once the panels are in their closed position. Standard white laminate panel finish chose to give a clean design and match other furniture within the room. An element of flexibility is suddenly added to your space. And the environment can quickly be manipulated to cater for any of your flexible space needs, whether that be for meetings or a little bit of privacy. The top and bottom seal operation on the MG100 movable wall system can be upgraded to the semi-electric seal operation by a flick of a switch which reduces the room set up by upto 2 thirds of the time. At ModernGlide, we have sourced an excellent range of panel finishes, ranging from our standard melamine to veneers to personalised digital images, to give you complete design flexibility.
Sponsored
New Product - Skylark fully electric foldaway attic stairs

New Product - Skylark fully electric foldaway attic stairs

Premier Loft Ladders Ltd

Skylark electric folding wooden loft ladders are now available from Premier Loft Ladders. The perfect solution for anyone planning to upgrade their old wooden loft ladder. They provide the beautiful aesthetics of a wooden loft ladder, with the convenience of electric operation. For more information, visit our web site.
Sponsored
Comparison : Electric Hand Dryers VS Paper Towels

Comparison : Electric Hand Dryers VS Paper Towels

Heat Outdoors & Handy Dryers

Which method of hand drying is most suitable in modern day life, an electric hand dryer or paper towel?
Sponsored
High early strength concrete for hydro electric power station

High early strength concrete for hydro electric power station

Tarmac

Dawnus Civil Engineering were commissioned by Cardiff CC to construct a hydro electric power station at Radyr Weir. The £2.6m scheme comprised of damming the section of works from the River Taff and constructing the structure to house the Archimedes turbine screws. They required a concrete that could take the weight of the screws 3 days after pouring and asked for a 3 day strength of 50N.Tarmac suggested TOPROC ED which is a high performance readymixed concrete suitable for use in industrial, commercial and infrastructure construction where high early strength is required.
Sponsored
The 'Supreme' Electric ladder lives up to its name

The 'Supreme' Electric ladder lives up to its name

Premier Loft Ladders Ltd

Electric loft ladders offer a superb solution for easy access to loft spaces. Especially for rooms with a very high ceiling, such as this property in Edinburgh.The challenge…Premier Loft Ladders received an enquiry from Magnus in Edinburgh who discovered the loft access specialist through an internet search. Magnus’ goal was to purchase a sturdy retractable ladder as part of a larger project; altering the loft space to function as a study, separate from the living area below.The ladder had to offer reliable, safe access to and from the loft whilst bearing in mind a high ceiling of 3.5 metres with restricted space for the ladder to deploy when opening. Ease of operation was also of great importance to Magnus so that deploying and stowing the ladder away could be made as effortless as possible.The Solution…With a heavy-duty aluminium structure and space saving qualities, the Supreme Electric from Premier Loft Ladders was chosen for this application.The Supreme Electric comes with a reliable motor, hard wired to the main supply via a control box and backup battery so it can be deployed and retracted effortlessly with the push of a button! Hard wired switches were also supplied, one on the landing and one in the loft area next to the opening so the ladder can be operated from above and below.The ladder itself features large treads (140mm deep) and a telescopic hand rail as standard, with an additional handrail added for this specific application providing safe, easy access to and from the loft.Installation Challenges…After the Supreme Electric ladder had been installed, there was found to be an issue preventing it from operating automatically. During this time Magnus could still use the ladder manually, thanks to the override option and counterbalance spring design.We worked with Magnus and his electrician to try and resolve the issue. This included checking warning indicators and working through a trouble-shooting guide. Unfortunately, it was not possible to fully diagnose the problem.As such, we sent replacement components for the ladder which were successfully installed by a different firm to the original installation team. After this the ladder operated perfectly, for which Magnus was very grateful.The results…A perfect solution was achieved for Magnus. The Supreme Electric ladder was positioned comfortably in the available space and gave him a safe, reliable access to and from the loft.
Sponsored
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Profab Access Ltd

Profab Access Ltd, part of the Access 360 portfolio, is prioritising fire safety in buildings with the introduction of fire testing for both sides of its 4000 Series riser door range. Established in 2001, Profab Access Ltd is a leading UK manufacturer of wall and ceiling access panels and riser doors. The company employs a team of 71 and operates from a 46,000 sq. ft. manufacturing and distribution facility in Atherstone, Warwickshire. All aspects of the design and manufacturing process are carried out onsite.
Sponsored
Warwick University

Warwick University

Eaton Electric

Emergency escape lighting that can be monitored remotely to save time, ensure safety and avoid unnecessary interventions in hazardous or sensitive areas.
Sponsored
POWERPOLES AND ODYSSEY BIO FOR COVID-19 TESTING LAB

POWERPOLES AND ODYSSEY BIO FOR COVID-19 TESTING LAB

Marshall-Tufflex Ltd

When a new COVID-19 Lighthouse Laboratory was approved in Plymouth in November 2020, the Government required a quick turnaround to set up the testing facility in order to meet demand and tackle the virus. After its proven success in supplying the Nightingale Hospitals, Totus Engineering specified Marshall-Tufflex PowerPoles and Odyssey Bio trunking to complete the fit out.
Sponsored
Case Study – Liverpool Heart & Chest COVID-19 Testing Facility

Case Study – Liverpool Heart & Chest COVID-19 Testing Facility

Twinfix Limited

When Liverpool’s leading specialist heart and chest hospital trust wanted to set-up a drive through COVID-19 testing facility, Twinfix were approached by Actua to find a solution to provide shelter within their client’s COVID 19 testing pick up points.The area was a small courtyard and the proposal was to create a turning circle where vehicles could drive in and pick up their testing kit and drive out, the canopy would provide shelter for the vehicles whilst doing so.There were further complications as the area is also used for general hospital deliveries therefore meaning the height of the canopy needed to facilitate lorry/wagons.With the hospital’s requirements in mind, Twinfix designed two bespoke structures spanning a total of 82 sqm:Section 1: Free standing duo-pitch canopy completely independent of the building·Section 2: Wall mounted lean-to mono-pitch canopy with vertical glazed screen to side & front elevation.Section 1 comprised of galvanised steel posts with upper aluminium sub-frame roof, whereas, the full structure of Section 2 was manufactured in aluminium.Both structures were fitted with our non-fragile Multi-Link-Panel roof-glazing system glazed with 25mm clear polycarbonate.Joe Astley, Capital Projects Officer at LHCH commented: “The trust is very pleased with the services received. From a quick turnaround in manufacturing to a trouble free and speedy installation, Twinfix did a great job at LHCH.”These canopies not only look great, but also utilise the outdoor space providing shelter for patients and staff throughout the testing process.
Sponsored
Amundi – Semi Electric Movable Wall - MG100

Amundi – Semi Electric Movable Wall - MG100

ModernGlide Ltd

Installation of 3 number MG100 Semi Electric Movable Acoustic Walls for a large company in London. This design has allowed our client to have 4 separate rooms or 1 larger flexible working space. With a flick of a switch there is no need to manually lock each panel off with the automatic top and bottom seals locking off the system. One of the closed spaces did not have an internal access door so we included an inset door panel within one of the standard panels to allow for access in-between the rooms once the panels are in their closed position. Our client wanted as much clear workable room space as possible and using the double point stacking tracks the panels foldaway into a recessed pocket. Grey laminate panel finish chose to give a clean design and match other furniture within the room. An element of flexibility is suddenly added to your space. And the environment can quickly be manipulated to cater for any of your flexible space needs, whether that be for meetings or a little bit of privacy. At ModernGlide, we have sourced an excellent range of panel finishes, ranging from our standard melamine to veneers to personalised digital images, to give you complete design flexibility.
Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

Movawall Systems Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one Movawall.
Sponsored
Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn

Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn

Glazing Vision Ltd

Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn Case Study
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

London Wall Design Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one London Wall.
Sponsored
Acoustic Products launches semi-automatic electric movable wall

Acoustic Products launches semi-automatic electric movable wall

Acoustic Products Ltd

Acoustic Products has launched a new semi-automatic electric movable wall system. Each panel within the system has a microprocessor based circuit board controlling automatic operation of the panel seals making the system extremely easy to use and re-locate. Available in sound reduction ratings up to Rw 57 dB, a wide range of panel finishes and with simple or more complex remote stacking arrangements. Please contact the techical sales department at Acoustic Products for more information. Tel +44 (0)1227 281140 Fax +44 (0)1227 281141 www.acoustic-products.co.uk enquiries@acoustic-products.co.uk.
Sponsored
Electric Car Charging Forecourt Cranked Bollards

Electric Car Charging Forecourt Cranked Bollards

Architectural Street Furnishings part of WB White Foundry

ASF manufacture stainless steel bollards for electric car charging forecourts, both as protection bollards and to house the chargers themselves. Manufactured to the highest standards in marine grade 316 stainless steel with polish finishes to meet any specification, these bollards can be either straight or cranked to provide the required protection and projection.
Sponsored
LPCB LPS1175 testing on our Security Rated Platinum Turnstile

LPCB LPS1175 testing on our Security Rated Platinum Turnstile

Frontier Pitts Ltd

Following the release of our Platinum LPS1175 Turnstile with a 90° rotor (4 section walkway) in December 2019 our customers asked us to develop a security rated turnstile with a 120° degree rotor (3 section walkway). Frontier Pitts worked closely with LPCB during the lockdown months, co-ordinating safe, socially distanced testing in our factory, to ensure our R&D program continued to produce products to meet our clients requirements.Now the LPS1175 Platinum Turnstile, like many other Turnstiles, have the option of 90° or 120° rotors. A first for the LPCB LPS1175 market!
Sponsored
COVID-19 Testing Site, Accrington

COVID-19 Testing Site, Accrington

Rapid Ramp Limited

BACKGROUND: The facility will open at the Eastgate Car Park as part of the Government strategy to improve localised access to coronavirus tests.REQUIREMENT: Fully compliant ramps and steps in double quick time to allow the site to open before the end of the week. ADDITIONAL INFORMATION: A few hours after receiving the enquiry and measurements, CAD/technical drawings and a quotation were drawn up and sent to the client.  END RESULT: The measurements were received Monday evening, and all components were picked and packed Tuesday morning and delivered to site for Wednesday morning.The systems were fitted by our installation team Wednesday, ready for use by Thursday at midday.We were true to our name, delivering the project rapidly in less than a week. This was achieved with our in-house team, which included a site surveyor, designer, and installers.All components were available from stock and ready for installation as soon as required.FEATURES INCLUDED:Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes. The colour yellow is chosen because as a bright colour, it has the ability to reflect light. Therefore, it makes it easier for the user to see whilst reducing the risk of trips and falls.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - this self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail- this handrail system ensures users always have support to hold onto.EXTRA FEATURE INCLUDED:Standard Step Units - an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.ACCESS RAMPS & STEPS FOR PREFABRICATED BUILDINGS:Like modular buildings, our ramps & steps are prefabricated systems, carrying benefits including:A fast construction time - Ramp installations are typically completed within a 1 to 2-day turnaround time. Components are manufactured and stored in-house.Easy to remove – Once no required, ramps can be disassembled within a few hours.Design and build flexibility - Ramps can be re-designed and re-configured to suit different sized areas.Cost-effective – Our access ramp has a life span of over 25 years with no maintenance costs.Environmental benefits – Ramp components can be reused under our ramp recycling scheme.Safety features - Includes handrails for grip and a slip-resistant mesh platforms as standard.
Sponsored
America's Test Cup Building

America's Test Cup Building

Fixfast Ltd

Portsmouth is home to the Land Rover Ben Ainslie Racing America’s Cup sailing team. TAC Projects were employed by the main contractor - Allied Developments - to provide the roofing and cladding works. TAC Projects have a long-standing trading relationship with Fixfast, and looked to them to provide fastening systems which would satisfy all the needs and requirements for such a project. Fixfast provided all the fasteners needed for securing the external building envelope on this iconic and prestigious project - including Fixfast's DrillFast A4 stainless steel fastener range was the solution to fixing in a challenging environment - securing the external building envelope on this iconic and prestigious project."TAC required a reliable supplier of high-quality stainless steel fasteners for this fast track project and chose Fixfast for their comprehensive range, good quality and technical backup"Tom Colbourne - Managing Director at T A Colbourne Projects Ltd
Sponsored
Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Yewdale Corporation Ltd

When a blind company was tasked with replacing the electric blinds in a popular highstreet noodle restaurant chain in St Albans, they knew they could depend on Yewdale. They chose YewdaleDefiant® C27 electric cassettes with five blinds in Light Grey 1% Roe fabric. They also specified a fascia that could cover the entire length with three blinds on one barrel, saving the installation of three individual cassettes in one, large window. Read more about this project.
Sponsored
Louvred Wall Cladding for Electricity sub-stations at the Rock Shopping Centre in Bury

Louvred Wall Cladding for Electricity sub-stations at the Rock Shopping Centre in Bury

Lang+Fulton

The Rock is a 1.6million sq/ft mixed use development aimed at regenerating the town centre of Bury. The £350million project includes shops, restaurants, cinema, bowling alley, parking space and residential units. Lang+Fulton supplied 300 sq/m of custom-sized panels and 20 sets of doors to secure and ventilate the street-front elevations of the electricity sub-stations. These were made to fit the structural openings with concealed ancillary steelwork. Italia-100 steel louvred material was chosen for its vandal-resistant properties and was also impenetrable to any abuse from a foreign object.2.8m high Italia-80 was also used in the car park as an internal visual screen separating vehicle access from a service road. In addition 160m of 2.8m high Stereo grating panels were installed on the upper levels of the car park around plant areas and emergency exits.
Sponsored
Individual vibration damping for complex pump test stands through low-frequency air spring systems

Individual vibration damping for complex pump test stands through low-frequency air spring systems

ACE Fabreeka UK

A university of applied sciences team optimises oil pumps to reduce the fuel consumption of combustion motors. Numerous tests are necessary for this. A test stand caused undesired vibrations. PLM air spring elements from ACE ensure damping at several points. The optimum design was achieved with the company-produced measurement case and an external measuring sensor that was connected to a tablet PC. The low-frequency elements provide a significant isolating effect from a frequency of 5 hertz and above, and prove themselves to be significantly more effective than the previously used rubber-metal isolators.
Sponsored
Accoya tested to its limits with a poolside deck in Israel

Accoya tested to its limits with a poolside deck in Israel

Accoya

Distributed by Vertex in Israel Accoya has been used for a swimming pool decking area and under water deck. Raised grain, splitting and rotting of wood is greatly reduced if not eliminated with Accoya compared to other woods. Accoya was coated in a Blanchon oil with the Accoya underwater left natural to go grey over time.
Sponsored
Accoya® 10 years - tried tested and proven

Accoya® 10 years - tried tested and proven

Accoya

Cladding project using Accoya revisited after 10 years, view the video in the link.
Sponsored
RC4 Test for KORN LIGNUM SECURE

RC4 Test for KORN LIGNUM SECURE

Siegenia-Aubi Ltd

KORN utilised the SIEGENIA GROUP's hardware technology and know-how for the development of RC4-certified solutions. As a specialist for selected premium solutions and inventor of innovative window systems, exclusive villas and sophisticated projects of the highest standards are the special field of Cornelius Korn GmbH.

Showing 1-36 of 655

Feedback