NBS Source
I'm a manufacturer

"door closers"

619 results found

Sort by:

Showing 37-72 of 153

Sponsored
Victoria Gate Retail Facility

Victoria Gate Retail Facility

dormakaba UK & Ireland Ltd

When architects ACME designed a new landmark retail facility in Leeds, the aim was to build a shopping centre fit for luxury brands. dormakaba supplied HSW-R glass sliding shop front systems, ES200 automatic sliding door entrances & MUNDUS patch fittings, to ensure a high performance access solution with elegant appearance. 150 panels across the arcade, was installed. HSW-R systems include an ITS96 door closer, concealed within frame for discreet appearance. The system’s double glazed panels are supported by aluminium ceiling suspended track avoiding any obstructions for wheelchair users. This creates an ideal access solution for retail entrance settings.
Sponsored
Full-door alarm - The Junipers PICU

Full-door alarm - The Junipers PICU

Safehinge Primera

The Junipers is the first of its kind in the south west of England; offering inpatient support that's closer to home for people with complex mental health needs. The design of the purpose-built unit included input from experts by lived experience and is truly a facility designed with people in mind. When we first discussed the plans for The Junipers PICU with Devon Partnership, we knew it was an opportunity to work together to create a new state-of-the-art ward. After reviewing their options, Devon Partnership chose to install our full doorset range. We worked closely with them before, during and after installation to ensure all of the doors and locksets were operating to help both patients and staff.
Sponsored
Socially distanced greenery and closer to nature

Socially distanced greenery and closer to nature

Mobilane

The world is focused on social distancing, safety and health; this latest project brings nature a little closer to help improve on all counts with socially distanced greenery. Leicester City Council’s urban environmental goals called upon the flexibility and experience of a rapid taskforce of installers from Hedera Screens to bring green elements across the City during lockdown and beyond.
Sponsored
Slimdrive SL NT automatic sliding door system

Slimdrive SL NT automatic sliding door system

GEZE UK Limited

Product name Slimdrive SL NTType Door openers / closersDoor type suitability Sliding doorsOperation ElectromechanicalInstallation Door surround mountedGrade CommercialMax. size of door leaf 120kgOperator dimensions (mm) 70mm highPart of the Slimdrive range, the SL NT is an electronic automatic sliding door system that offers flexibility, reliability, functionality, efficiency and safety.The extremely slim design of the SL NT makes it possible for the operator to be concealed in any facade, giving architects the freedom to design stylish entrances. Extremely versatile and suitable for a wide range of applications, the Slimdrive SL NT can be used for single- or double-leafed internal or external doors. GEZE Slimdrive SL NT also benefits from quick and easy assembly and installation.The Slimdrive SL NT is an intelligent automatic door system that is perfect for busy entrances to buildings such as shopping centres, hospitals and stores - anywhere where there is a high volume of traffic and where manually operated doors are not appropriate.The Slimdrive SL NT is suitable for a variety of applications, from the simple installations to grand all-glass facades. Two or more SL NTs can be combined to provide a draught-proof lobby.Key featuresOne of the most compact sliding door operators availableOperator height only 7cmEasily integrated into almost any facadeEnvironmentally friendly due to economical use of materials and energyDimensionsOpening widths: 700 to 3000mmWeight: up to 125kg per leaf
Sponsored
St Bernard’s Hospital – Rutland ITS.11204

St Bernard’s Hospital – Rutland ITS.11204

Rutland

Project DetailProject: St Bernard’s HospitalLocation: London, UKProduct: ITS.11204 Surface slide arm closer with cushion stopProject DescriptionSt Bernard’s Hospital underwent a redevelopment to upgrade infrastructure. It required approximately 60 concealed, slimline closers for locations that needed to adhere to high hygiene standards. The closers also needed a means of back check or the ability to stop doors from bumping into objects behind them. The hospital installed the ITS.11204 because it:Comes with an adjustable angle cushion stop for easy fittingHas cam actionIs easy to openAdheres to high hygiene standardsIs suitable for fire doorsComes with a 10-year guarantee as per requirements‘They work as if they are not there! Very smooth and not obtrusive.’ – Staff Nurse
Sponsored
St Andrew Square

St Andrew Square

Allgood Ltd

Now reimagined as The Edinburgh Grand, the formerA-listed RBS head office built between 1938 and 1942 is animpressive building situated on St Andrew Square. With manypieces of Victorian antique brass and pewter ironmongeryand hundreds of original period doors throughout, theironmongery solution had to accommodate the traditionalaesthetic and be fit for the many demands of a modern hotel.Allgood was commissioned by the project’s architect andinterior designer, both long term partners of Allgood; KarenBrown of Chris Stewart Group and Eirini Christodoulou ofMorgan McDonnell. With such a striking, but unusual finish,finding coordinated hardware was a challenge. Severaloptions were assessed before settling on a brass finishapplied to the Allgood door closers, cylinders and joinerysubcontractor’s hinges.A collection of classic Frank Allart handles was chosen for allapartment front doors, which also integrated with the hotel’saccess control system. To match the patina of the agedhandles, a satin nickel-plated surface was given a light bronzefinish to produce an aged nickel silver appearance. Thisunlacquered, ‘living’ finish, will oxidize and patinate naturallyover time.
Sponsored
Four Seasons, Dubai

Four Seasons, Dubai

Allgood Ltd

Completed in November 2014, the Four Seasons Dubaisits beside Jumeirah Beach, just ten minutes fromDubai’s famous commercial district.California based architect WATG worked alongsideinterior designer BAMO to create a resort heavilyinfluenced by mediterranean architecture and the hotel’sseaside location. For example, the lobby sits underneathan octagonal dome finished with gold leaf that enhancesthe natural light coming through the windows.Each of the 237 guestrooms come with a balcony,offering panoramic views of the sea or the city’sextravagant skyline, punctuated by the world’s tallestbuilding, the Burj Khalifa.The luxury hotel required a tailored package toensure it’s aesthetic flair was complemented bythe door furniture.The intricate detail on the Royal Suite doors wasmatched by custom made lattice pull handles in a pewterfinish (far right image), whilst the rest of the suite andpublic areas were supplied with pull and knob handles ina co-ordinated bronze finish.In contrast, the hotel opted for a polished finish in thepresidential suite, with nickel and stainless steel thepreferred materials. A full spectrum of door furniture wasapplied including lever handles, lock cases and doorclosers, all supplied in the desired polished finish.
Sponsored
The Pathé Building

The Pathé Building

Allgood Ltd

Originally home to Pathé films and situated in the heart of London’s famous Soho district, The Pathé Building at109 Wardour Street is a newly refurbished developmentconsisting of 15 apartments. With exquisite interiors drawingon a classic British palette of textures, the apartments offer2-3 bedrooms with communal area and kitchen. With flatsretailing at the higher end of the market, it was imperativethat Allgood’s specification complemented the luxuryaesthetic of the apartments.Initial discussions revealed that the architect wanted tospecify the same finish throughout the entire building.This presented a challenge for Allgood as there wereseveral different types of doors and door colours:orange, white and grey. Allgood felt stainless steel,while a finish that would suit the décor, would not beappropriate for this type of residential building so abronze finish was agreed upon. The grey apartmentfront doors were supplied with bronze door closers,thumb turns, lever handles, hinges and flushbolts,whilst the bathroom doors were fitted with bronze pullhandles and thumbturns.The building also required signage to direct residentsand guests to various areas of the facility. However,the architect wanted to continue the bronze themeinto this so Allgood manufactured bespoke individualnumerals, letters and various symbols including abicycle in a bronze finish.Like with any central London residential building, spaceis an extremely valuable commodity. In order to maximisespace in the apartments, Allgood supplied bronze pocketdoor locking kits for all the bathrooms.
Sponsored
Liberty Syndicates Fit Out, 20 Fenchurch Street

Liberty Syndicates Fit Out, 20 Fenchurch Street

Allgood Ltd

Based in the heart of London’s financial district, LibertySyndicates has taken up new office space at 20Fenchurch Street, more commonly known as the WalkieTalkie.Famed for it’s unique design, the building wascompleted in 2014 by world renowned architect, RafaelVinoly. Unlike most skyscrapers, the walkie talkie adoptsa top-heavy shape which allows it to maximise space onthe higher floors, the most expensive to rent.It also offers a free to use sky garden for the public,situated on the top three levels, which was one of thekey factors in the building receiving planning permission.Liberty Syndicates opted to make six floors of 20Fenchurch Street their new London home, with a view todeveloping a modern and vibrant working space.In a high usage, commercial environment, Allgood’skey brief was to provide a high performing ironmongerypackage. Grade 316 stainless steel Modric pull handleswere supplied on all of the meeting room doorsalongside matching accessories and overhead doorclosers.In the bathroom areas, Allgood supplied a co-ordinatedModric range of signage, WC turns, coat hooks andescutcheons.
Sponsored
Motel 1 – Newcastle – Rutland TS.11204

Motel 1 – Newcastle – Rutland TS.11204

Rutland

Project DetailProject: Motel 1Location: Newcastle UKProduct: TS 11204 Cam action door closers on rebated doors and frames.Project DescriptionRefurbing old and new to bring together the variety of Building designs without loosing the quality brand of Motel 1 is a difficult situation.In the words of Motel 1:-‘The challenge in the past years for Motel One to position itself as a budget design hotel brand was one that we initially in Germany, mastered perfectly.We were able to implement our strategy, a demand for high quality of the product and the design combined with excellent locations and a very attractive price. The basis for success is satisfied employees and guests at the heart of the Motel One business philosophy.With currently 53 hotels and more than 13.000 rooms, we have become one of the largest providers in the budget sector in Germany.Our next step takes us to Europe. In Austria we opened the first six hotels in Salzburg and Vienna and with our Motel One in Edinburgh, Manchester and in London we did our first move to the UK. By 2017, we wish to expand the network of locations to 74 hotels and around 18.000 rooms with already 5.700 rooms outside of Germany. Ambitious objectives that we will achieve with the support of our partners and the high level of motivation or our staff.’So with all this being important they used a reputable Door set manufacturer and Door control supplier
Sponsored
Milliners Wharf, Manchester

Milliners Wharf, Manchester

Technal

Manchester's Milliners Wharf development is a part of the "Hat Box" regeneration of New Islington. This high-end residential development was designed to ensure residents feel safe in their home by specifying products with high security features. As such, our aluminium door was chosen for the ground floor apartments and top floor duplex apartments, which incorporates an invisible door closer as well as concealed locking groover for a tight and secure mechanisam. These features, along with the single-leaf open in and open-out hinged doors that meet PAS24 certification for burglar resistance, resulted in the Secured by Design certification.Along this door system, aluminium sliding doors were used for the balconies and was specified for their durability alongside aluminium windows. This further assisted in the Secured by Design certification. There are several optional additions to the window system which provides the ability to customise for each project. In this case, the Hat Box development benefits from tilt before turn windows made possible with the systems durability and strength. The hinge mechanism can support glazing up to 130kg. As well as a safety element, it was important to ensure that the building's occupants would be living in a healthy environment. In building's where there is a difference of U values between the walls, windows and doors, there is a risk of high humidity which could potentially cause issues with condensation and mold. The issue was overcome at Milliners Wharf through the thermal efficiency offered by our aluminium curtain walling. Less energy is lost between the inside and the outside of the facade. This consistancy in temperature and improvement of the air quality in the room means that the room needs much less energy to heat and cool it.
Sponsored
Mental Health Corridor doorsets - Integrated Mental Health Services (Barnet, Enfield and Haringey)

Mental Health Corridor doorsets - Integrated Mental Health Services (Barnet, Enfield and Haringey)

Safehinge Primera

When Barnet, Enfield and Haringey Mental Health NHS trust approached us, they required new doorsets as their existing double-leaf corridor doors with surface mounted, scissor-arm closers were presenting a ligature risk and were regularly over-opened, causing damage. Plus, the leaves were vandalised, requiring regular repainting. We supplied our extra-wide, single-leaf doorsets with concealed hold-open closers, offering superior safety by reducing the ligature risk. We also used a vandal-resistant PVC facing to brighten the space and minimise regular maintenance costs.
Sponsored
BLU 316 Stainless Steel Door & Window Hardware in For Conversion In Charlestown

BLU 316 Stainless Steel Door & Window Hardware in For Conversion In Charlestown

Coastal Group

The amazing transformation of a former public toilets into a stunning detached property couldn't get much closer to the coast! Nestled on a cliff edge with stunning views out over the famous World Heritage Site of Charlestown Harbour, 316 Marine Grade Stainless Steel Hardware was a must.Throughout the build, the homeowners selected a number of products from our BLU range including the HAB7 Offset Rectangle Pull Handles, HQ4 Stainless Steel Butt Hinges, SST91 Casement Window Stay and the KM060 Mitre Lever Door Handle to provide the style and aesthetics required.As the property owner said, “It was an absolute no-brainer for us to choose blu products to use at our Loo With A View conversion! The handles, hinges and other hardware are of the highest quality, in addition to the fact that they look stunning, with their sleek lines and elegant finish.“We wanted to use products that wouldn’t rust, and wouldn’t need to be replaced in a few months, or even years down the line, and we have great faith that we have made the right decision!”
Sponsored
Berners & Wells

Berners & Wells

3v Architectural Hardware Ltd

Emrys Architects were appointed by Berners & Wells to design this mixed-use development located north of Oxford Street in central London. The building sits across 2 different streets, the lower two floors accommodate flexible retail and restaurant space and the upper floors high end office space.The building has been designed to respond to the historic Character of the local area, some areas were partially demolished while the Edwardian facade on Wells Street was retained, repaired and extended. Portland stone and teal glazed-brick detail was used to create seven two-storey high arches showcasing the grand entrances to the offices and retail units.The ironmongery brief centred around replicating the arches present in both the external entrances and the courtyard, this distinctive shape was also used in the vision panels on a number of internal doors. To fulfil this brief, we worked closely with the architect to design and manufacture bespoke arched push plates in Flat Matt Black(FMB). Where required these were paired with complimentary D-shaped pull handles and simple accessories finished to match. All other ironmongery was finished in FMB including hinges, door closers, signage and accessories.Photography: Neil Kenyon
Sponsored
26-31 Charlotte Street

26-31 Charlotte Street

Allgood Ltd

Located in Edinburgh’s prestigious Charlotte Square,these former National Trust for Scotland offices havebeen refurbished and redeveloped into commercialaccommodation.Originally designed by Robert Adam in 1791, the restorationof these 6 A-listed townhouses sees the architecturalintegrity of these neo classical facades, fully restored. Aswell as restoring the buildings exterior and interior, MorganMcDonnell Architects have also redeveloped the areabehind these old Georgian houses, linking the 3 centraltownhouses to a contemporary lightweight glass and ETFE(a fluorine based plastic) covered courtyard to provide32,000 ft2 of grade A office space.The balanced contrast between the old exterior andmodern interior is reflected throughout the building’s fabric,especially it’s ironmongery. A traditional oval design wasapproved for the knob handles as it provided the mostgrip available. A polished chrome finish was chosen asMorgan McDonnell Architects wanted a modern feel to thehardware whilst being traditionally sensitive to the age ofthe building. Initially Morgan McDonnell Architects wantedto use lever handles, but due to the listed status of thebuilding and the design of the doors (many of the originaldoors were refurbished) a knob handle was deemed themost suitable.Working with Morgan McDonnell Architects, Allgood Plcprovided a combined ironmongery and access controlpackage that included: hinges, door closers, locks, kickplates, signage and concealed electromagnetic locks. Allitems Allgood provided were delivered on time and withinthe clients budget.
Sponsored
East Ham Technical College

East Ham Technical College

Allgood Ltd

Situated in the London Borough of Newham, East HamTechnical College was reopened in September 2014and is now home to over 500 students. The elegantVictorian building was originally built in 1905 and isnow a Grade II listed building.Rick Mather Architects retained many of the existingfeatures of the original building whilst the new modernadditions seek to complement and highlight these,whilst ensuring functionality for users. Extensive areasof glazed tiles and bricks have been repaired anduncovered to restore the original diverse materialityof the building. Though the south and east elevationsutilised alternative materials, they maintain the redbrick and terracotta aesthetic of the more elaboratenorth and west facades.The ironmongery package presented a challenge forAllgood. The high usage of the building meant theironmongery would need to be highly functional but itwas essential that the aesthetics matched the interiordesign of the building.Whilst many of the classrooms have been modernised,the interior designer elected to match the ironmongeryto the more classic themes of the building.A co-ordinated antique brass finish was applied toknob handles, numerals, hinges and door closers oneach of the wooden, white painted doors.In the bathroom areas, where some of the originaldecor was not retained, a more conventional stainlesssteel finish was utilised to cubicle locks and WC turns
Sponsored
250 Bespoke Eclisse Classic Pocket Door Systems supplied to prestigious development in Belgravia

250 Bespoke Eclisse Classic Pocket Door Systems supplied to prestigious development in Belgravia

Eclisse UK

Inspired by traditional Belgravia garden squares, Chelsea Barracks is an exceptional development that will create an entirely new neighbourhood combining magnificent townhouses and spacious apartments with five acres of landscaped gardens, exclusive shops, fine-dining and state-of-the-art leisure facilities. It has been under construction since 2019 and it due to be completed in 2024.Chelsea Barracks represents a historic collaboration between world-renowned architects, best-in-class landscapers and the finest craftsmanship. It is the most coveted neighbourhood in London.It is a development of 440 residential luxury apartments, penthouses and townhouses. It cost £3bn to build and was the most sustainable developments in Europe in 2021, attaining LEED platinum certification for green building.The design and quality of finish in the properties is extremely high end and includes high spec finishes including natural stonework finished by Italian stone Artisans, bronzed ironwork balustrades inspired by the botanical prints of William Morris and elegantly crafted wooden floors and bespoke cabinetry.ECLISSE UK supplied 250 bespoke pocket door systems, including Classic singles and Classic doubles with accessories, to the project and they were predominately used in the bathrooms and living rooms. Classic singles were used in bathrooms to create more space where the arc of standard hinged doors would have otherwise encroached on the space. This allowed more space for larger shower enclosures and enhanced room layouts. Double pocket doors were used to create more space and enhanced layouts in the living rooms to allow furniture to be placed closer to the edges of the room to create more spacious layouts that feel bigger. Product: 250 bespoke Classic Pocket Door System with accessoriesLocation: Chelsea Bridge Road, London, SW1W 8RGDeveloper: Qatari Diar GroupArchitect: Masterplanners - Dixon Jones, Squire & Partners and landscape architect Kim WilkieDevelopment: Over 440 two to Seven bedroom luxury residences and townhousesCompletion: The development is being completed in phases with the final phase expected to be completed in 2024.Image Source: Savills
Sponsored
Sowwah Square

Sowwah Square

Allgood Ltd

Sowwah Square is a landmark development situated on theisland of Jazeerat Al Maryah in Abu Dhabi. The complexcomprises four luxury high-rise towers providing 285,000square metres of mixed office and retail space, as well asthe new Stock Exchange of Abu Dhabi building.Working in collaboration with design and architecture firm,Gensler, Allgood initially provided specifications for theStock Exchange building, retail area and the car parks,before later working with Goettsch Partners on the fourluxury towers.Gensler wanted a bespoke lever and pull handle designusing a semi-circular grip profile to complement the interioraesthetic. Allgood worked closely with the architects todesign, prototype, and produce the handles, using itsin-house design and manufacture capabilities. The finalproducts were installed on all 2,600 doors of the StockExchange building and have since been included inAllgood’s Mode range.Goettsch designed each of the four towers surrounding theStock Exchange in its own style. The versatile Sembla rangeof door furniture proved an ideal partner for this vision,given the many possible finishes and materials. For thisthe Sembla range of door furniture was chosen due to itsversatile range of finishes and material options. The clientalso only wanted fittings of the highest quality and durability.Sembla is made from solid grade 316 stainless steel and ismounted on Allgood’s patented Quadaxial™ rose that hasbeen tested to one million cycles without failure.The commitment to quality extended to the choices ofhardware with only the most durable mechanical hardwarebeing specified throughout the project. Allgood providedlocks, cylinders, door closers and panic devices with 10-yearguarantees, while the hinges had a 25-year guarantee.
Sponsored
Sir Robert Ogden Macmillan Centre (SROMC)

Sir Robert Ogden Macmillan Centre (SROMC)

Allgood Ltd

SROMC is the new cancer support and information centrebased at Harrogate and District NHS Foundation Trust, providingstate of the art facilities for patients and their families acrossNorth Yorkshire. Designed by IBI Group and constructed by SirRobert McAlpine, the centre offers patients the highest qualitytreatments, teamed alongside an integrated supportive care andcomplementary therapies.As always in a healthcare environment, it is imperative thatgood hand hygiene is maintained at all times to stop the crosscontamination of bacteria between users of the hospital. As doorfurniture is an item that is frequently touched by many differentpeople, IBI Group wanted an ironmongery solution that wouldprotect patients and visitors against the cross contamination ofHealthcare Acquired Infections (HCIS) whilst having a matchingfinish to rest of the mechanical hardware.Antimicrobial Copper is the most effective touch surface materialin the fight against pathogeinic microbes, killing greater than99.9% of bacteria within two hours of exposure. No othermaterial comes close. Historically, most antimicrobial copperdoor furniture has a copper-like appearance but this would notmeet the requirement of a stainless steel aesthetic. By using ourunique Contego range of ironmongery formed from a provenantimicrobial copper alloy that has the appearance of stainlesssteel, Allgood were able to provide a solution that met thearchitect’s requirements.A full specification was created using Contego range suchas lever handles, push plates, pull handles, WC turns andescutcheons complimented with satin stainless steel mechanicalhardware such as signage, door closers, locks and kick plates.By selecting the truly unique Contego range, Allgood were ableto supply an ironmongery package that matched the aestheticthroughout whilst providing protecting against the spreadof bacteria, reducing the risk of infection for the users of thebuilding.
Sponsored
Bideford College

Bideford College

dormakaba UK & Ireland Ltd

At the £55 million new-build Bideford College in Devon, careful selection of sustainable materials was of the utmost importance to help the building achieve a BREEAM rating of ‘Excellent’. When choosing solutions to control the numerous doors throughout the building, product lifecycle and longevity were important to help create a sustainable and low maintenance building. To achieve this, a comprehensive range of products from dormakaba was specified to install TS 93 cam action closers, as well as latches and floor springs. Incorporating a series of eco-friendly features the scheme received a Civic Building Award and a RIBA Award.
Sponsored
Steel Fire Doors and Acoustic Doors

Steel Fire Doors and Acoustic Doors

EBD Steel Doors (formerly Eurobond Doors)

Eurobond designed & manufactured a range of steel fire doors and steel acoustic doors for a leading tech giant.The Gemini Data Centre in Dublin, Ireland, is a fort of protected data; over 10,400 sq.m of space is utilised for cloud connectivity and leading technology providers, comprising of 6 individual data halls and ancillary services.All this data needs protection - that's where we helped. We provided fire-rated doors, acoustic security doors, and radar-operated automation doors.Protection of data and people was key, along with minimal noise and easy yet secure access throughout the complex.
Sponsored
Edinburgh Centre for Carbon Innovation

Edinburgh Centre for Carbon Innovation

Allgood Ltd

The Edinburgh Centre for Carbon Innovation (ECCI) is a newcentre for world leading research on carbon innovation. Partof Edinburgh University’s estate, the ECCI acts as a social huboffering teaching, support and information on climate relatedchallenges facing society. The ECCI also doubles up as agreen business venue for events and conferences in the heartof the city centre.Originally built in 1777 by Alexander Laing, the refurbishment ofthe Neo Classical Royal High School was the first refurbishedbuilding in the UK to achieve the BREEAM ‘Outstanding’award. Refurbished by Malcolm Fraser Architects, part of theCentre’s unique design includes careful consideration of thebuilding’s fabric, prioritising sustainable and recycled materials.A facet of the building’s refurbishment was to improve itsenvironmental aspects such as waste, pollution, land use,ecology, materials, management and energy.Reaching this iconic benchmark involved sourcing materialsfrom a sustainable background. When Malcolm FraserArchitects detailed the building’s ethos and aim to achievea BREEAM ‘Outstanding’ award. Allgood proposed a FSBironmongery solution that recycles 100% of the water used inthe manufacturing process and 90% of all FSB products canbe recyled at life end. Once presented with our FSB range andenvironmental manufacturing credentials, Edinburgh Universitywere happy to use Allgood’s ironmongery solution.Overall, Allgood supplied a combined ironmongery, sanitaryand access control package that included: hinges, doorclosers, locks, kick plates, signage, grab rails, soap dispensers,paper towel dispenser and concealed electromagnetic locks.Having successfully supplied to other Edinburgh Universityprojects before, Allgood knew how to approach the project,allowing all items to be delivered on time and within the clientsbudget.
Sponsored
Riser Doors and Access Controlled Doors for Multi-level Data Centre

Riser Doors and Access Controlled Doors for Multi-level Data Centre

EBD Steel Doors (formerly Eurobond Doors)

We were approached to design & manufacture a range of steel fire-resistant riser doors and personnel doors for Europe's most advanced data centre, located in Canary Wharf, London.This 8-storey building offers 73,400 sqm of space - they needed simple yet secure riser doors to provide fire protection to the internal ducts, containing all the cabling and plumbing required in a sleek, discreet solution that provided maximum access, performance and safety.Alongside the riser doors, Eurobond designed & manufactured personnel doors that could be electronically controlled to control the access and provide an audit trail of personnel movement.The 2 key elements of this project were the riser doors - and the sheer volume required to cover the 8 levels and the access control requirements that had to be well planned and coordinated by Eurobond, the security contractor, end-user and architect.
Sponsored
Beluga Hangar Doors

Beluga Hangar Doors

Jewers Doors Ltd

Jewers Doors has for many years supplied contour doors which are specially shaped to encompass the fuselage of an aircraft in order to provide an environmental seal. These doors allow part of an aircraft (e.g. the nose or tail) to be within the controlled environment of a hangar for maintenance, repair and overhaul (MRO) operations. With part (often the major part) of an aircraft remaining outside the hangar, space within the hangar is available for other aircraft to be worked upon – thus increasing productivity. Such an arrangement also means that MRO operations can be undertaken on larger Code E and F aircraft in hangars that would otherwise be too small.
Sponsored
GKD: A little closer to heaven

GKD: A little closer to heaven

GKD - GEBR. KUFFERATH AG

Commissioned by 30 member states of the European Union, the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) monitors the climate and weather. In light of climate change, the data it collects using complex satellite systems is becoming increasingly important. The growth of the organization associated with this is reflected in the continuous expansion of its HQ in Darmstadt. The construction of a new six-floor office building also includes a canteen for all employees working at the location. This canteen gets its unmistakable face from a lamella-style suspended ceiling made of golden PC-ALU 6010 aluminum mesh from GKD – GEBR. KUFFERATH AG.Modern weather forecasts today have little in common with traditional country weather lore. Satellites make it possible to monitor the climate and weather on a global scale. The data collected is then used to keep authorities, citizens and companies up-to-date with the latest developments at all times. In Europe, EUMETSAT monitors the atmosphere, oceans and earth’s surface around the clock and then transmits the data to the participating EU member states. Established in 1986, the organization opened its headquarters in Darmstadt in 1991. However, ever increasing requirements and staff numbers meant that the operation quickly outgrew its original space. A six-floor office building with 160 workplaces represents the final phase of a whole range of extensions and new buildings. Following a construction period of just 18 months, around 100 employees were able to move out of their temporary container offices and into the new building costing around €10 million, while a further 60 new employees are set to follow. The shape of the new building, designed by Pielok Marquardt Architects from Offenbach, is a mirror image of an existing building. Beside excellent energy efficiency and multifunctionality, the new building is characterized by transparency and modern design. Four office levels offer versatile space with transparent partition walls for any desired arrangement – whether open space, combination offices or classic cubicles.Functional division – exceptional aestheticsThe ground level comprises two separate functional units that can be accessed via separate entrances. Beside a control center for a new satellite program, this is also home to the campus kitchen with connected canteen for the workforce at the location, which has now grown to include around 600 employees. The kitchen has been designed to provide 410 meals a day and the canteen offers 250 seats. The mullion-transom facade also ensures that the room is flooded with light. Carefully chosen furnishings divide its area into various acoustically optimized zones. The white of the desks and chairs is picked up by strips in the glossy flooring and the cladding of the food counter, pillars and supports. In the central zone, bright red benches with high, sound-absorbing backrests offer a vibrant contrast. The color scheme is rounded off by the warm brown of the stone floor and the wooden acoustic cladding. However, the striking element in the room is the suspended ceiling, made from 400 square meters of golden aluminum mesh. Its 120 elements with a blade-type design mimic the appearance of sunshine in the canteen with their discreet shimmer. LED lighting strips further underline this impression. At the same time, the mesh conceals the ventilation technology with incoming air outlets on the element frames. As a result, the accessibility of the woven ceiling elements was among the key requirements for GKD. The planners opted for a particularly open mesh design in the form of the PC-ALU 6010 mesh with various warp and weft wire thicknesses. The function and aesthetics of the ceiling mesh thereby provide the desired high level of comfort in the canteen, while also making the room a unique feast for the eyes.
Sponsored
Data Centre Door Solutions

Data Centre Door Solutions

EBD Steel Doors (formerly Eurobond Doors)

From a design concept to delivering a compliant secure solution, Eurobond worked with a leading Worldwide tech giant to provide steel door sets to meet their function and performance.
Sponsored
Heathrow Airport Industrial Doors

Heathrow Airport Industrial Doors

Hart Door Systems Ltd

Heathrow Airport is the UK’s largest and busiest airport connecting the UK to over 80 long haul destinations and flying over 80 million passengers worldwide. Project/doors: Hart has over installed over 280 doors across all terminals including high speed smoke screens, fire conveyor shutters, security shutters, internal and external high speed doors, insulated fast action doors, sectional doors and pedestrian doors.The challenge Terminal 5 baggage handling system serves around 32 million passengers per year and handles around 6000 bags per hour.  Hart were asked to design, manufacture and install a specialist and unique automatic smoke screen system capable of handling over 6000 bags per hour, while providing a seal for 30 minutes in the event of fire. The solution Hart were the only company to provide a solution that fully met all the design requirements. Two years after the initial talks with the client, Hart successfully completed the manufacture and installation of all of the high speed smoke/fire screens within the main check in area, comprising 102 check in desks. Hart also installed a mixed package of roller shutter and fire doors in the lower ground service area and fire shutters on the Tube access tunnels leading directly to Terminal 5. The success Hart was chosen for the quality of engineering and the ability to meet the clients demanding specification and operating requirements. Hart continues to work with contractors and OEM’s such as Vanderlande, Mace and Balfour Beatty on site supplying upgrades and new doors when required
Sponsored
Automotive Manufacturing  Industrial Doors - Komatsu

Automotive Manufacturing Industrial Doors - Komatsu

Hart Door Systems Ltd

Komatsu is one of the world leading manufacturers of construction, mining and utility equipment.Project/doors:Over 60 doors – Speedor Cleanroom, Speedor Storm, Electric Roller ShuttersThe challenge Safety and reliability are paramount in this highly efficient 200,000 sqm facility, which has produced over 60,000 units. Although only a small part of the building, industrial doors cause the biggest problems if they are not designed with the environment and usage in mind. The solution As a British manufacturer, Hart provides Komatsu with a first-class service, offering support and parts when required and due to the reliability of the doors, maintaining the safe, efficient running of the facility. Each Hart door is made to measure and each safety device and activator is fitted to suit specific areas, giving Komatsu a safe and secure working environment for its employees The success Komatsu and Hart began their relationship in the 80’s with the installation of one of Harts earliest prototype Speedors. Due to the success of the door, 4 Speedors and 4 roller shutters were installed in 1992. Over the years, Hart has installed over 60 doors to the facility, only recently replacing some of the original doors installed in 1992. The Review:“Good customer services and support.” Scott Atkinson, Komatsu, UK
Sponsored
Agriculture Industrial Doors- Cargill

Agriculture Industrial Doors- Cargill

Hart Door Systems Ltd

Cargill is an international food, agriculture, financial and industrial products and services business. Cargill connects farmers with markets, customers with ingredients, and people and animals with nourishment.Project/doors:32 doors across six facilities12 Storm, 3 Super, 3 Mini, 6 Insulated Fast Action Roller Shutters, 4 Electric Operated Roller Shutter 4 Special Doors. Ongoing replacement of old doorsThe challenge Hart were consulted to help reduce vermin access mainly from pigeons, seagulls and geese attracted by the feed/agricultural nature of the production process. The doors needed to be capable of thousands of operations in dusty conditions allowing large vehicles fast access to the facilities. The solution With over 30 Hart doors installed across six production facilities, the latest contract replaced existing roller shutters, which remain open all day, with seven Speedor Storms, one Speedor Super and one fast action roller shutter. The emphasis was on speed of open/close cycles to significantly reduce the vermin access and improve energy efficiency. The success The investment by Cargill is also part of a drive to improve energy efficiency by 5% and to maintain a better working environment and temperatures within the building as well as preventing unauthorised access to different areas of the plant. The Review:“I wanted to say I was really pleased with the job David and guys have done. They showed great work ethic, housekeeping was spot on and their attitude to safety on site was great- whenever they were challenged they were very patient and helpful.”Gavin Dunn, Project Engineer, Cargill
Sponsored
Distribution Industrial Doors - Amazon

Distribution Industrial Doors - Amazon

Hart Door Systems Ltd

Amazon is the world’s largest technology company, with one of the most advanced fulfilment networks in the world.Project/doors: 9 Speedor Storm2 Speedor MiniThe challenge Due to the high-volume of traffic in the fulfilment centres where products are stored and shipped,efficiency of vehicles coming in and out of the building and the safety of drivers is paramount. Slow moving sectional overhead doors were left open to allow speed of access which is vital to efficient deliveries but resulted in heat loss. The solution Seven large Speedor Storms seamlessly integrated with existing doors in a heavy traffic despatch area. The Speedor Storms allow quick and easy access to the openings whilst maintaining internal temperature with its fast open/close action. Due to the quality and longevity of Hart Speedors there is less stress and downtime fixing and replacing defective doors so productivity is unaffected. The success Following the successful installation of Speedor Storms at Amazon in 2016, Hart was chosen as a reliable and trusted supplier. Hart provided expert design advice, specification and installation of the doors to an agreed time frame while not affecting the distribution process. Amazon was given peace of mind with a 2 year warranty as standard.
Sponsored
GEZE revolving doors: Door technology for the University of the Future

GEZE revolving doors: Door technology for the University of the Future

GEZE UK Limited

With stringent demands in terms of design, comfort, and functionality, the new City of Glasgow College is considered a ‘University of the Future’. GEZE UK made a key contribution to the modern look & feel of the technical college with custom door solutions, including revolving doors and swing doors.State-of-the-art door systems for the City of Glasgow CollegeThe £228 million project for a capacity of 40,000 students and 1,300 employees was completed by the Sir Robert McAlpine construction company. The entrance areas on the west and south sides were designed using GEZE door technology to reflect the structural aesthetic of the City Campus.The highly modern new building, with over 1,000 classrooms, boasts a striking design while fulfilling high requirements for functionality and safety.Manual revolving doors ensure the flow of trafficThe west and south wings impress with modern steel and glass façades with two manual revolving doors. An additional automatic swing door was installed directly beside each of the revolving doors.Manual revolving doors with TSA 325 NT door drives are the ideal solution for the building's specific requirements in terms of functionality and ease of access. The generous door leaves are easy to move, and the integrated control mechanism stops pushing behind an individual entering into the swing door. In addition, the revolving doors effectively protect the lobby from draughts, dust and noise.Automatic swing doors, designed as emergency exitsThe automatic swing doors directly besides the revolving doors were equipped with electro-mechanical GEZE Slimdrive EMD-F swing door drives to offer maximum flexibility. They can be activated with the push of a button, providing barrier-free access for persons with restricted mobility. The door drive is just 7 cm tall, and integrates discreetly into the door frame to move the door leaf precisely, reliably, and extremely quietly. In the event of a fire, the swing doors also serve as barrier-free emergency exit doors.Automatic sliding doors: effortless door comfortA single leaf automatic sliding door with GEZE Slimdrive SL NT drive guides students and visitors into the interior of the Riverside campus. The highly modern building, which was nominated for the prestigious Stirling Prize, houses student accommodation hat is home to over 3,000 ship building and marine technology students.The slim Slimdrive SL NT drives (just 7 cm tall) integrate almost invisibly into the modern, column-encased entrance area, moving door leaves of up to 125 kg quietly and effortlessly. This makes it the ideal drive solution for a public building with consistently high traffic in both directions – especially one such as Riverside that is also used as a residential building. GEZE's modern door solutions have played a key part in ensuring students can move comfortably and safely through their environment.
Sponsored
AOJ RESTAURANTS - SWING DOOR

AOJ RESTAURANTS - SWING DOOR

Next Doors Ltd

In addressing the demands of a thriving commercial fast food venue, we devised a tailored solution to create a dedicated entrance exclusively for online delivery and collection orders.At the core of this situation was the installation of a durable, commercial grade aluminium swing door, engineered to endure the high traffic flow characteristic of such establishments. Seamlessly integrated with a local access control system, this door allowed staff to securely lock the entrance after hours while still facilitating convenient access from outside via a digital keypad. From hardware installation to software integration, our in-house team managed every aspect of the installation with precision and efficiency.To reinforce the restaurant’s brand identity, custom graphics were applied to the door, carefully curated to align with the client’s specific preferences. This meticulous attention to detail not only enhanced the visual appeal of the entrance but also contributed to a cohesive and professional aesthetic that resonated with customers and staff alike. By providing a comprehensive solution prioritising security, accessibility, and brand representation, we effectively met the unique needs of the fast food venue, ensuring seamless operations and customer satisfaction.
Sponsored
MILESTONE RESTAURANTS - STEEL DOOR

MILESTONE RESTAURANTS - STEEL DOOR

Next Doors Ltd

The urgent need for a replacement rear goods entrance at a high-turnover commercial fast-food restaurant brought our proposed comprehensive solution to address both security and functionality concerns.Recognising the critical role of a secure entrance in the restaurant’s operations, we recommended the installation of a commercial-grade steel door and frame. This robust system not only provided enhanced security but also ensured ease of use for restaurant staff, crucial for maintaining smooth workflow amid the bustling environment. Anticipating the challenges posed by the high usage typical in such establishments, we tailored the solution to withstand heavy use and abuse, including the impact of large food delivery cages. To bolster the door’s durability, we integrated a custom heavy duty pyramid bumper bar system, extending its lifespan and longevity against daily wear and tear.Moreover, to enhance security measures and streamline access control, we incorporated a digital keypad externally. This feature allowed the door to be kept closed and locked securely while granting staff convenient access from outside. Not only did this improve security protocols, but it also contributed to rodent control efforts by minimising entry points. Additionally, to impress trade visitors and further elevate the entrance experience, we introduced a modern digital video door entry system. This innovative technology provided a seamless connection between the entrance and kitchen staff, enabling real-time visual identification of visitors and ensuring efficient management of incoming deliveries and guests. By seamlessly integrating security, functionality, and modern technology, we successfully revitalised the rear goods entrance, ensuring it could meet the demands of the fast-paced restaurant environment while enhancing overall operational efficiency and security measures.
Sponsored
RIVERSIDE SCHOOL - BI-FOLDING DOORS

RIVERSIDE SCHOOL - BI-FOLDING DOORS

Next Doors Ltd

In addressing the needs of a high-traffic SEN school, we encountered the challenge of facilitating maximum opening width at the main entrance to accommodate pupils arriving in a variety of special needs vehicles, all while prioritising security and safety for the students.To meet these multifaceted requirements, we devised a tailored solution centred around the design and installation of two bi-folding automatic aluminium doors. These doors were strategically positioned to create an internal lobby, providing a controlled environment where staff could independently manage each door. Crucially, this setup was seamlessly integrated with the existing school access control system, ensuring a high level of security while facilitating smooth traffic flow.Our innovative design also incorporated an air lock system, enhancing safety protocols by creating a secure buffer zone between the exterior and interior of the school. This air lock system not only provided added security but also offered the flexibility to transition to fully automated doors during open days and emergencies, ensuring efficient and safe ingress and egress as needed.By combining functionality, security, and adaptability, our solution successfully addressed the unique challenges faced by SEN school, providing a safe and accessible entrance that could accommodate the diverse needs of its student body while maintaining a high level of security at all times.
Sponsored
SOLOMON COURT - SWING DOOR

SOLOMON COURT - SWING DOOR

Next Doors Ltd

The original main entrance door to a residential block posed significant challenges, being both unstable and unreliable, ultimately leading to a less-than-ideal user experience. Recognising the need for a substantial upgrade, our focus shifted towards implementing a solution that could withstand the diverse demands placed upon it by the building’s occupants.In response to these requirements, we introduced a robust commercial door section that not only provided enhanced security and stability but also offered unparalleled reliability and durability. This new system was meticulously designed to ensure ease of operation for the end users, effectively addressing the previous difficulties they had encountered. Furthermore, by seamlessly integrating with the existing access control infrastructure, our solution not only facilitated smooth transactions but also offered cost-effective servicing options for ongoing maintenance needs. Through this comprehensive approach, we successfully transformed the main entrance into a secure, user friendly gateway that met the diverse needs of the residential block’s occupants.
Sponsored
Food & Beverage Industrial Doors - Taylors of Harrogate

Food & Beverage Industrial Doors - Taylors of Harrogate

Hart Door Systems Ltd

Bettys & Taylors of Harrogate is a fourth generation independent family business, passionate about some of the finer things in life – beautiful tea rooms, handmade cakes, traditional breads, proper tea and top quality coffee. They are the business behind Yorkshire Tea, Taylors of Harrogate coffee and the famous Bettys Café Tea Rooms.Project/doors: 5 Speedor Super, 1 Speedor Mini, 12 Fire Shutter, 21 Pedestrian doors, 1 Electric roller shutter, 1 Insulated Roller ShutterThe challenge Due to the size and weight of the insulated roller shutter at 10.5m wide and 6.3m high, this was a difficult installation in an area where the headroom was very tight. A crane was required to lift the shutter into position after opening two holes in the building’s roof so lifting chains could be dropped through to facilitate moving the shutter into position. The solutionHart was contracted by Sir Robert McAlpine to supply and install a range of industrial doors at the Taylors of Harrogate site.  This included the installation of the three-tonne insulated roller shutter completing a work package of over 40 doors. The success The installation of the shutter concluded a project which Hart was involved with through Sir Robert McAlpine and which saw almost every Hart door product installed – from Speedor high speed doors to fire shutters, security shutters and steel personnel doors. 

Showing 37-72 of 153

Feedback