NBS Source
I'm a manufacturer

250 Bespoke Eclisse Classic Pocket Door Systems supplied to prestigious development in Belgravia

OVERVIEW

Inspired by traditional Belgravia garden squares, Chelsea Barracks is an exceptional development that will create an entirely new neighbourhood combining magnificent townhouses and spacious apartments with five acres of landscaped gardens, exclusive shops, fine-dining and state-of-the-art leisure facilities. It has been under construction since 2019 and it due to be completed in 2024.

Chelsea Barracks represents a historic collaboration between world-renowned architects, best-in-class landscapers and the finest craftsmanship. It is the most coveted neighbourhood in London.

It is a development of 440 residential luxury apartments, penthouses and townhouses. It cost £3bn to build and was the most sustainable developments in Europe in 2021, attaining LEED platinum certification for green building.

The design and quality of finish in the properties is extremely high end and includes high spec finishes including natural stonework finished by Italian stone Artisans, bronzed ironwork balustrades inspired by the botanical prints of William Morris and elegantly crafted wooden floors and bespoke cabinetry.

ECLISSE UK supplied 250 bespoke pocket door systems, including Classic singles and Classic doubles with accessories, to the project and they were predominately used in the bathrooms and living rooms. Classic singles were used in bathrooms to create more space where the arc of standard hinged doors would have otherwise encroached on the space. This allowed more space for larger shower enclosures and enhanced room layouts. Double pocket doors were used to create more space and enhanced layouts in the living rooms to allow furniture to be placed closer to the edges of the room to create more spacious layouts that feel bigger. 

Product: 250 bespoke Classic Pocket Door System with accessories

Location: Chelsea Bridge Road, London, SW1W 8RG

Developer: Qatari Diar Group

Architect: Masterplanners - Dixon Jones, Squire & Partners and landscape architect Kim Wilkie

Development: Over 440 two to Seven bedroom luxury residences and townhouses

Completion: The development is being completed in phases with the final phase expected to be completed in 2024.

Image Source: Savills




No featured products in this case study

Contact Eclisse UK by clicking the button below to find out which products were used in this case study.

More case studies from Eclisse UK

View all case studies (12)
99 Eclisse pocket doors installed in exclusive Islington Square Development

99 Eclisse pocket doors installed in exclusive Islington Square Development

Eclisse supply pocket door systems to the winning development of the Civic Voice Awards.

Eclisse supply pocket door systems to the winning development of the Civic Voice Awards.

Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Westminster Quarter development

Westminster Quarter development