NBS Source
I'm a manufacturer

"concrete framed systems"

15,306 results found

Sort by:

Showing 253-288 of 2275

Sponsored
Deakins Place, Nottingham

Deakins Place, Nottingham

Senior Architectural Systems Ltd

Our expertise in the student accommodation sector has led to our aluminium fenestration systems being used on this new riverside scheme in Nottingham, which has been designed by architects Maber and built by main contractor Bowmer & Kirkland.Managed by student housing provider Student Roost, the new Deakins Place development is located within close proximity of the University of Nottingham’s Jubilee campus and offers stunning views of the River Leen. These views have been perfectly framed by our patented low U-value PURe® aluminium windows which have been installed by specialist contractor HKL.Specified with flat casement vents, our thermally-efficient PURe® aluminium windows have been installed to each apartment to increase the flow of natural light and to reduce heat loss. The slim aluminium fames have been powder coated to provide additional protection from the elements and to complement the wider façade design which features a stunning mix of natural building materials and colour palettes.
Sponsored
Fulham Jetty

Fulham Jetty

Bauder Ltd

Fulham JettyBauder Bakor 790-11 hot melt structural system with Bauderflex waterproofing system and BauderGREEN sedum systemSynopsisFulham Wharf is a landmark regeneration scheme that began in 2013 and included the ecological enhancement of an abandoned jetty on the River Thames. This redevelopment was designed to provide the local community with an ecological education centre and bio-diverse wildlife reserve.Bauder Building BoardProject:Fulham JettyLocation:LondonRoof Area:1,000m²Specifier:FabrikApproved Contractor:Accurate RoofingProject challenges One of the major challenges for this roof was installing the central sloped section, which required exceptional levels of technical input and workmanship. This roofing area was waterproofed with the same bituminous green roof system as the upper roof; however a special timber design for retaining the substrate and sedum blanket was also needed. Since its official opening in October 2013, the lower wildflower roof has become a haven for a variety of different birds and insects.The resultThe building’s new roof swoops down to become a continuum with the jetty deck and is covered with a green habitat providing three distinct environments for wildlife; one on the flat roof, one on the slope and the third on the jetty deck. The education centre roof was waterproofed with Bauder’s root resistant bitumen membrane before then having a sedum blanket fitted. On the lower roof, 650m² of Bauder’s hot melt structural waterproofing was installed along with a wildflower blanket, providing an instant carpet of vegetation. Systems installedBauderflex bituminous waterproofing system1 BauderPLANT E 42A torch applied, SBS elastomeric bitumen capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC SPRINT DUOSelf-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. The product features a glass fleece reinforcement for strength and stability. The product benefits from cleaner, safer, and faster installation than traditional torch-applied membranes.3 BauderPIR FA-TELightweight, PIR flatboard insulation board with aluminium foil facing on both sides. This product has zero ozone depletion potential.4 BauderTEC KSD FBSSelf-adhesive air and vapour control layer with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder Insulation AdhesiveBauder Bakor 790-11 hot melt waterproofing system1 BauderPLANT E 42Torch-on root-resistant, green capping sheet. Reinforced with spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 790-11 with reinforcement layerHot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.Bauder XF 301 Sedum system1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green
Sponsored
Soundis Cradle & Batten System at Valentines House, Ilford

Soundis Cradle & Batten System at Valentines House, Ilford

Soundis

Valentines house, an 11,000m2 building in Ilford. Originally a commercial office block, it’s position adjacent to both Crossrail and TFL red routes meant it was a prime candidate for conversion to desirable one and two bedroom apartments.The refurbishment works consisted of extending 4 stories including structural strengthening and new envelope to incorporate full fit-out of 122 residential units and 3 retail areas.As part of the conversion, main contractor John Paul Construction, required the expert installation of around 10,000 m2 of acoustic flooring to achieve Approved Document E Building regulations. As part of the acoustic flooring package, Soundis value engineering option of Soundis 10mm Acoustic Cradles, Base Pads, Riser Stackers and 18mm P5 T&G chipboard was selected. Our Cradle and Risers are manufactured from 100% recycled materials assisting to the sustainability targets of projects. An acoustic cradle and batten system was chosen, to level out floor imperfections and to minimise impact noise from passing footfall. Airborne wasn’t so much of a concern in this build due to the high mass concrete subfloor.
Sponsored
Historic Restoration - 230 Park Avenue (The Helmsley Building)

Historic Restoration - 230 Park Avenue (The Helmsley Building)

C-Probe Systems

Challenge: Many elements of the iconic skyscraper were facing embedded steel corrosion, including the structural steel lattice columns within the colossal terracotta enclosures. The expansion of the steel caused by the corrosion was severely damaging the masonry cladding and cracking the six-foot-tall terracotta bison heads.Strategy: Installation of an impressed current cathodic protection (ICCP) system at the steel sections with the colonnades on 29th to 32nd floors. The system consisted of LoCem® +point® anode mortar was applied within the bed joints and drilled in to provide 360° protection of the steel surfaces. The bison heads were deconstructed, steel cleaned-up and masonry reconstructed. LoCem® is a low carbon cement alternative (AACM), which can also act as a cathodic protection anode for controlling steel frame corrosion.Outcome: The ICCP system resulted in long-term performance and control for the whole life preservation of our clients’ assets. Using AchillesICP for control over corrosion rate, and AiMS to collect the data, the client had full transparency over structural health and the power to make predictive maintenance decisions.
Sponsored
3 SNOWHILL QUEENSWAY, BIRMINGHAM

3 SNOWHILL QUEENSWAY, BIRMINGHAM

Ambar Kelly Ltd

Built in the heart of Birmingham, this building has 18 floors steel frame around 3 concrete cores. Being a very constrained site, close coordination was required with the structural steel frame contractor. Two deliveries a week were required to ensure their programme was met.
Sponsored
Oaklands Rise, London

Oaklands Rise, London

Senior Architectural Systems Ltd

Senior Architectural Systems has taken its aluminium fenestration solutions to new heights after being specified on the new Oaklands Rise mixed-use residential development in London, which is not only one of the UK’s largest regeneration projects but also one of Senior’s largest contracts to date.Designed by CZWG Architects and constructed by the Vistry Partnership, the £175m scheme comprises three major tower blocks which vary in height from ten to 27 storeys. Senior’s slim profile SF52 aluminium curtain wall system has been used to create the striking faceted curved elevation, with the smooth rounded corners of the balconies and corner apartments further accentuating the design. Senior’s robust SPW500 aluminium commercial doors were used externally and installed to the fire exits and main entrance, with SPW600 aluminium doors fitted internally throughout communal areas.With the need to increase energy efficiency and reduce the carbon footprint of the scheme, Senior’s patented low U-value PURe® aluminium windows and PURe® SLIDE patio doors were also chosen for the scheme. As well as contributing to lower energy bills for the residents, the slim sightlines of the PURe® aluminium windows and doors perfectly frame the development’s far-reaching views over London and the attractive green streetscape below. The stylish PURe® SLIDE aluminium sliding doors also provide select apartments with access to individual roof terraces, creating a seamless link between the interior and exterior spaces.
Sponsored
Opus Energy

Opus Energy

Excelsior Panelling Systems Ltd

The ProjectFollowing Opus Energy’s momentous growth over its 15-year history, their move to the John Dryden House will consolidate their four current sites and house all employees working in Northampton under one roof.With the new premises, Opus Energy expects to have an almost 800 strong Northampton workforce, highlighting its prominence as a key local employer. The refurbishment of the property has seen state of the art facilities, and with investment into sustainability opportunities, will enable the business to be carbon neutral.The ChallengeWork within tight lead times to supply deliver and install the project.Offer a cost-effective system suitable for the environment intended.Propose a selection of classic High Pressure Laminae finishes that will deliver a timeless décor.  The SolutionExcelsior Select Range of Cubicle’s in 20mm High Pressure Laminate fell within budget and met with the Architects Specification. A combination of Polyrey finishes created the classical, timeless façade desired by the client. SpecificationProduct Range: SelectDoors: 18mm MR Core HPL Polyrey B101 Banian NoirciPilaster: Polyrey B101 Banian NoirciPartition: Partition: Polyrey B015 Blanc MenuiresIronmongery: Excelsior SBAASpecificationProduct Range: SelectVanity Top: 12mm Laminated CDF Polyrey B101 Banian NoirciVanity Panels: HPL 18mm MR Polyrey B015 Blanc MenuiresFrame: Polyrey B015 Blanc Menuires
Sponsored
Basement Waterproofing

Basement Waterproofing

Delta Membrane Systems Ltd

This luxurious residential project incorporated a double level basement with the lower level extending out underneath the garden. In regards to the below ground structure Knowles & Associates Ltd undertook the following works: Excavation and formation of a basement to footprint and under 7 metres below garden level. Two/three stage underpinning. Internal steel staircase frame. Piling. Mass excavation of spoil. Construction of rear extension. Below slab drainage. Cavity drain Waterproofing. Insulation and screed. Swimming pool shell within lower level basement.
Sponsored
Waverley Court

Waverley Court

Langley Waterproofing Systems Ltd

Our purposeAs one of the UK’s leading housing associations, the Guinness Partnership prides itself on providing high quality homes that meet or exceed current Standards. It is therefore committed to a continuous programme of maintenance and asset management across its 60,000 homes estate.As part of that process, the 13-storey 1980s-built Waverley Court in Crewe was due for refurbishment, including new windows and heating for the 95 flats therein. An initial survey highlighted that the 1200m2 roof was failing and in need of upgrade to maintain its weathertightness.Our in-depth roof report also identified that the insulation was below current standards. Safety on the roof for maintenance was also an issue: the existing handrail was originally erected as a temporary fixture, penetrating the waterproofing and providing inadequate rooftop security for working at height.Our solutionThe existing waterproofing had perished beyond useability. We advised complete strip of the existing back to the concrete deck, and building up a new thermally-efficient roof to meet current standards required under the Part L of current Building Regulations.Our TA-25 W Flat Roofing System for warm roofs was installed by Approved Contractor Everlast as sub-contractor to the principle contractor, Wates. To address the poor falls on the roof, the insulation was tapered to the perimeter. We achieved an overall roof U value of 0.17W/m2K, exceeding the current Regulatory requirement of 0.18W/m2K. In line with Safe2Torch guidelines, our self-adhesive system was used to detail around roof penetrations for extractor fans and similar plant.We highlighted and designed bridging details to maintain the fire integrity around compartment walls to comply with Part B3 of Building Regulations.We designed a new, permanent and safe handrail system. This is fixed to the brick façade of Waverley Court, avoiding any penetration of the roof fabric and thus maintaining its integrity and watertightness, whilst minimising maintenance requirements.“Langley’s expertise and attention to detail has enabled us to deliver on our ambition of providing homes that people want to live in. Langley’s performance has helped us provide a dry, warm, safe living environment that exceeds current Regulatory requirement. The independent insurance-backed guarantee covering design, materials and workmanship adds value to our long-term estate asset management.”
Sponsored
Sevenoaks School uses Silent Gliss shading systems

Sevenoaks School uses Silent Gliss shading systems

Silent Gliss Ltd

Sevenoaks School is a leading independent school located in Kent, England. The new Science and Technology Centre is one of the most sophisticated, high-specification education buildings in the UK. The interior is designed to encourage curiosity and collaboration among young scientists.Silent Gliss blinds were layered in the laboratories using roller blinds SG 4910 with Aluscreen Futura fabric to provide glare protection in daylight, and dim-out system SG 4740 for room darkening. To blend harmoniously with the surroundings, the profiles are colour matched to the window frames. The social and study areas are fitted with hand-operated curtain tracks SG 6840 with Wave for a softer room ambience. The end result is an aesthetically stunning, award-winning education facility which has achieved a BREEAM Excellent rating.
Sponsored
Apartment Renovation, Raised Steel Acoustic Floor - Båstad, SE

Apartment Renovation, Raised Steel Acoustic Floor - Båstad, SE

Floor Levelling Systems Ltd

SubFloor flooring was used to help renovate, raise and acoustically dampen concrete floors in apartments.The acoustic feet simply click onto the SubFloor screws and dampens any step noise up to 28 dB, this helps reduce; step noise, rebound noise and flanking transmission.This simple and elegant solution raised and levelled the floor to allow for installations and insulation underneath. The joist and screw system allows for quick and easy assembly so that the floor can reach the desired height.Products:Steel Joist 45x30x3800 mmSubFloor Screw 100 mmSubFloor Acoustic FootHeight Variation: 58 - 112 mmJoist separation: c/c 600 mmSystem Weight - c/c 600 mm: 2.21 kg/m²Materials:Steel, Z100 GalvFibre-reinforced polypropylenePolyamide + Rubber damping elementPoint Load Limit (50 x 50 mm):Between screws over joist - 6.78 kNOver screws over joist - 10.54 kN
Sponsored
South East Water Reservoir - Kent

South East Water Reservoir - Kent

SMR PROJECTS LIMITED

The reservoir had an estimated 180 metres of cracks that needed repair, as well as the main element of the concrete that required coating to waterproof and add durability to the concrete structure. The Reservoir was taken out of commission but it needed to be returned to service as soon as possible. To do this, we looked at the order of the processes to ensure the tight time frames could be met.  
Sponsored
Termini, 3 Arkle Road

Termini, 3 Arkle Road

Venesta Washroom Systems Ltd

It was high on the developer’s agenda to incorporate shower and changing facilities in the brand new Grade A office space in Dublin.Completed in 2020, the Grade A office development, just 20 minutes away from Dublin city centre, features the highest specifications achievable in an office setting. It was high on the developer’s agenda to incorporate shower and changing facilities in the office space. Fit-for-purpose and high spec toilet and shower cubicles that would guarantee user privacy were installed. Not stopping there, changing room solutions including lockers and benches were also specified for the waterside office development.Unity Full Height toilet cubicles were specified in all male, female and accessible toilets across the 6 floors. Complementing the toilet cubicles, Unity Full Height was also chosen for the shower areas. With full height doors, pilasters and partitions this popular cubicle range offers increased privacy for users; ideal for public showers. Our metal framed non-plumbed washroom panelling system, Frameduct, was specified for the WCs and urinals. Read the full case study to find out more.
Sponsored
BP Agora - Coastline, Arctic Survey, Comfortable Concrete, Artistic Liberties

BP Agora - Coastline, Arctic Survey, Comfortable Concrete, Artistic Liberties

Milliken

BP's progressive new workplace features a creative combination of carpet four Milliken design collections to creative impact and visually zone the building. Beyond zoning, the stunning colour specification, effective use of colours transitions, mix of square and plank tile formats and installation as rug insets, make this a truly inspiration office environment. The floor coverings WellBAC® Comfort carpet backing also delivers additonal underfoot comfort and excellent acoustic and wear performance. Thanks to Milliken's M/PACT programme they are also fully carbon neutral.
Sponsored
BPP - Unexpected Purpose (Carpet), Polished Concrete and Heritage Wood (LVT)

BPP - Unexpected Purpose (Carpet), Polished Concrete and Heritage Wood (LVT)

Milliken

For this busy educational building with high footfall, the Unexpected Purpose modular carpet offers rich saturated colour and excellent wear performance. Its Comfort Lite cushion backing also provides additional sound absorbency, particularly important for the quiet study areas in this building. The LVT floor coverings provides the recreational areas with a hard wearing, practical solution and the perfect urban aesthetic.
Sponsored
Newton - Comfortable Concrete, Change Agent, Artistic Liberties, Arctic Survey

Newton - Comfortable Concrete, Change Agent, Artistic Liberties, Arctic Survey

Milliken

This high quality, creative working environment in one of Bucharest's most iconic buildings includes a variety of spaces carpeted with Milliken modular carpet. The acoustic performance of the modular carpet delivers an extraordinary working environment for this high profile client in gaming technology.
Sponsored
St Elphin’s Park £6m Restoration and Redevelopment

St Elphin’s Park £6m Restoration and Redevelopment

Naylor Concrete Products Ltd

Exceptional homes in the perfect location St Elphin’s Park retirement village is set within 14 acres of landscaped grounds, located within the Derbyshire Dales. The centrepiece building, St Elphin’s House, started life as a private residence, becoming an exclusive spa in the 19th century, and latterly, a well-known girls’ boarding school, St Elphin’s Girls School. This Victorian schoolhouse has been restored stone by stone. Surrounding the Victorian grandeur of St Elphin's House, and built to echo the appeal of a traditional Derbyshire hamlet, are attractively designed retirement properties including apartments, cottages and mews cottages.
Sponsored
Manchester Airport

Manchester Airport

CLD Physical Security Systems

Manchester Airport Group (MAG) is a leading UK airport group that owns and operates Manchester, London Stansted and East Midlands airports, together with a significant property business.In 2011 they began a project of upgrading their entire airport perimeter security fencing and gates to cope with an increase in passengers and estate traffic.The BriefSecurity was paramount when it came to the brief for a new perimeter fence line and physical access control. There are a number of features that have not been included in this case study for security reasons.The fence had to have the ability to be erected in a variety of ways, including on concrete, dug in, base plated and ground buriedSecurity Toppings were requiredStrong anti-cut wires on any meshAnti-climb properties to prevent scalingCost effective due to the size of the fence line
Sponsored
Lloyds Pharmacy

Lloyds Pharmacy

Excelsior Panelling Systems Ltd

The Project Refurbish existing washroom facilities at Lloyds Head Quarters.Work along side Swift Building Services to complete the project.Specification lead by Pinnegar Haywood Design.   The ChallengeProduce a range of Cubicles, Duct Panels and Vanity units to create an innovative, vibrant space.Solid surface on site jointing and polishing of oversized, bespoke Solid Surface Vanity tops.Manage installation from drawings to completion with a dedicated Contracts Manager. Complete full, detailed survey & provide guidance on discussing feasibility at planning stage. The SolutionExcelsior Select Range in a kaleidoscopic array of colours has created a stimulating, revitalising washroom environment. A valiant use of colour conveyed onto the Vanity Unit completed the installation; Magma Range 100% recyclable Compact Density Fibreboard frame with 12mm Hanex Top to suit semi recessed bowl with a 250mm upstand and a 200mm downstand finished off with 20mm square edge access panels. This Analogous colour scheme proves a break from the norm for washrooms and is testament to the Architect and the combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish.combined skills and expertise of Excelsior’s trusted team that resulted in such an accomplished finish.SpecificationProduct Range: Select 20mm HPL 1960mmDoors: 20mm High Pressure Gloss Laminate (Multiple Colours)Pilaster: 20mm High Pressure Laminate G059 Gris OragePartition: 12mm Solid Grade Laminate G059 Gris OrageThese Systems Are Available In The Following Finishes:Natural Wood VeneerHigh Pressure LaminateHigh Gloss LaminateIronmongery: Aluminium
Sponsored
Redrock, Stockport

Redrock, Stockport

Berry Systems

Berry Systems helped our client Wates become car park compliant by designing, manufacturing and installing our vehicle restraint systems. A combination of our RB1, Barrier Rail profile and a Bespoke Rectangular Hollow Section system was utilised to fulfil the client’s requirements and exceed their expectations.Redrock is a new leisure facility located in the centre of Stockport which has a 360 space multi-storey car park.Popular restaurants and a cinema now feature in the location to help provide localswith a safe, secure and modern leisure facility where they can relax. Berry Systems were keen to get involved in such a project and help contribute to the development ongoing in the area. Using our expertise of the car parking industry, we designed, manufactured and installed a system that met their requirements exactly.The RHS (Rectangular Hollow Section) System we specified on the project was made bespoke and suited more to their aesthetic needs. We combined the vehicle restraint systems with handrail and mesh to provide additional pedestrian protection. Cladding rails were also created and supplied to support the exterior cladding that was specified on the project. Throughout this project, our client took advantage of our consultancy services to work together to create a solution that was compliant, safe, stylish and  satisfied both parties.
Sponsored
Webnet used as Balustrade Infill at the Queen Elizabeth Olympic Park

Webnet used as Balustrade Infill at the Queen Elizabeth Olympic Park

MMA Architectural Systems Ltd

Designed to manage and guide the flow of visitors, the Webnet balustrade plays a key role in the organisation of pedestrian traffic during and after the 2012 Olympics hosted at the Queen Elizabth Olympic Park in Stratford, London.The balustrading infill had to accommodate the multitude of curves that were a feature of the balustrade’s design, and the pliable characteristics of the Webnet wire mesh made it the perfect choice.  The Webnet system can adapt to most forms and shapes, making it perfect for creating curves. Featuring high translucency, the Jakob Webnet system is also a discreet and elegant choice for balustrading. The Jakob Webnet wire mesh balustrade infill went through an exhaustive series of tests to ensure it could cope with the large crowds and fulfil a vital security function.Created using marine grade 316 stainless steel, Jakob’s Webnet wire mesh infill continues to provide a robust, weather resistant solution, designed to last for years to come.MMA Architectural Systems (JAKOB's sole UK distributor) also supplied Webnet wire mesh frames for the London Stadium at the Queen Elizabeth Olympic Park. 
Sponsored
Healthcare | Cardigan Integrated Care Centre

Healthcare | Cardigan Integrated Care Centre

Venesta Washroom Systems Ltd

Cardigan Integrated Care Centre is a brand new healthcare centre in West Wales, housing a GP practice, dental service and pharmacy.Each unit was pre-plumbed and tested at the Venesta factory, reducing installation time by 50% and giving the end user added peace of mind.The aim of the £24m development was to provide safe, sustainable, integrated care for local residents. The anticipated high footfall meant durable and hardwearing solutions were required in all consultation rooms and washroom areas.Hygiene and infection control were of paramount importance, so we worked closely with Accredited Installers, Shire Integrated Systems, to ensure fit for purpose healthcare solutions were selected.Vepps Boxed-Out Units were specified for all the consultation rooms and offered speedy installation, while maintaining the integrity of rear fire walls and acoustic rated walls. The Solid Grade Laminate (SGL) box sides in ‘Shadow’ were rebated into strong extruded aluminium frames that provide flush, easy to clean surfaces.Meanwhile, Vepps Wall System panelling was specified for the toilet areas, which meant the WCs, flushes, basins and taps were pre-plumbed and thoroughly tested before being delivered to the Centre for installation.Read the full case study for full details.
Sponsored
Fitzwarren Court, Salford

Fitzwarren Court, Salford

K Systems Insulated Facades

Fitzwarren Court is of one the highest buildings in Salford at 23 storeys and was a major refurbishment requiring an aesthetic and thermal upgrade. The building had originally been earmarked for demolition as part of a wider regeneration of the area, but plans were halted when Salix Homes secured funding to modernise the block.The Casey Group were appointed as main contractor for the work. New kitchens, bathrooms, doors and windows have been fitted to all 135 apartments. Our approved installer Hamilton Building Contractors were contracted by The Casey Group to complete the exterior wall insulation and rendering which had a metamorphic effect on the building’s overall appearance and thermal performance.The 1970s building was a pre-cast concrete panel system. The panels were of a ribbed surface design and were fitted together creating a recessed detail which was a unique design feature. Alongside Hamilton, we worked to transform the façade aesthetically creating a modern building, with a safe, stylish and thermally efficient solution. A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.We worked in collaboration with Hamilton Building Contractors to ensure there was minimum disruption to the residents of Fitzwarren Court, who remained in their homes while the work was carried out.K Systems produced a bespoke high-rise specification which included various zonal wind load calculations optimising the longer-term safety and durability of the design. Various factors were taken into consideration throughout the installation process including a recessed windowsill and anti-perch detail (preventing birds from settling on the sills).Our focus throughout the project included safety, quality, thermal efficiency and service.Paul Turner, Director at The Casey Group, said:   “Successful EWI schemes, especially on high-rise tower blocks, demand the highest level of Project and On-Site Support from design through to inspections, with technical guidance and warranty support. K Systems are expert partners in this field.”Discover more on how the Fitzwarren Court transformation project won at the 2021 INCA awards here: https://k.systems/news/kilwaughter-minerals-wins-big-at-prestigious-national-industry-awards/
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Novotel Hotel, NineB Restaurant – Leicester

Novotel Hotel, NineB Restaurant – Leicester

Roché Systems Ltd

THE CLIENTThe Novotel Leicester is a modern hotel in the heart of the city, convenient for business or leisure guests. The hotel boasts easy access to many of Leicester most exciting attractions, close to the Leicester Tigers Stadium and King Power Stadium, the National Space Centre and The Curve Theatre. THE CHALLENGETo provide shading to expand their outdoor dining area for the NINEB Restaurant, as well as added brand visibility with the addition of sign writing on the awning and side blindsTHE SOLUTIONThe Markilux Pergola was chosen for the frame and roof, with the addition of Markilux 790 side blinds to offer additional wind protection, partitioning and brand awareness.Markilux PergolaThe Markilux Pergola awning shelters large areas from the sun. Two slender support posts at the front provide excellent stability, even during showers, and unobtrusive lateral guide tracks. The pitch of Markilux Pergola is easily adjustedMade to measure and manufactured in GermanyRated for wind speeds up to 30mph (Beaufort 6)Water resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardChoice of electric or remote control operationExtended product and workmanship guarantee availableMarkilux 790The Markilux 790 is simple to operate and has a compact cassette which fits to the wall vertically. It extends manually and fixes to a freestanding post or bracket fixture on a fence railing.Made to measure and manufactured in GermanyWater resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardExtended product and workmanship guarantee available
Sponsored
Airports flying high with Schlüter-Systems

Airports flying high with Schlüter-Systems

Schlüter-Systems Ltd

From two of the world’s biggest and busiest transportation hubs at London Heathrow and London Gatwick to other international airports at Bristol, Liverpool and Dublin, specialist products from Schlüter-Systems are ensuring that each is able to cope with the millions of pairs of feet and the millions of trolley and suitcase wheels that pass through their doors each year with flying colours.
Sponsored
Type Glide - Student Loans Company

Type Glide - Student Loans Company

Movawall Systems Ltd

Student Loans Company (SLC) are a non-profit making government-owned organisation that administers loans and grants to students in colleges and universities in the UK. Since 2008, one of SLC’s main offices has been located in the North Eastern town of Darlington at The Memphis Building.What was once part of a wool factory is now a leading open plan workspace for hundreds of staff. Over the last fifteen years, the interior has undergone a number of major changes to accommodate the SLC team’s ever changing needs – including the design, manufacture and installation of multiple Glide moving panel systems we delivered in 2021.SLC wanted to implement a solution that would allow them to re-configure the large, open plan and create smaller more private areas for staff when required. All panels are top-hung, meaning there is no obtrusive floor track. Despite this, each individual panel can be locked in to position thanks a foot-operated compression bolt.Half of the panels are equipped with a drywipe surface which allows for extra writing space during team meetings, presentations, brainstorming sessions and more.The other half of the panels feature PET polyester, which incorporates custom cut-out shapes in a variety of colours. In addition to providing a uniquely textured finish, the PET panels offer protection from noise distraction thanks to the material being sound absorbent.The aluminium panel frames – which have been painted to match the PET finishes on show – ensure durability, increasing the system’s lifespan.
Sponsored
Creating a New Community Centre, North London

Creating a New Community Centre, North London

Newton Waterproofing Systems

When HSP Architects and Price & Myers wanted to transform a listed commercial basement in Temple Fortune to create a new community centre, they needed to look no further than Newton Specialist Contractor Arti Construction to perform the waterproofing.ning three of the walls were either fully or partially below-ground and suffering from water penetration. Arti recommended the Newton CDM System, as it is the most safe and reliable form of waterproofing that would deliver a completely dry internal space and cause the minimal amount of disruption to the Listed structure.The basement, part of a four-storey Listed building, was built into a hillside, meaning that three of the walls were either fully or partially below-ground and suffering from water penetration. Arti Construction worked with the design team at an early stage to design a waterproofing solution.With existing Listed basements such as this one, Arti Construction were quick to recommend a Type C cavity drain waterproofing solution in the form of the Newton CDM System. Type C waterproofing is the safest and most reliable form of waterproofing that will deliver a completely dry internal space, whilst also causing the minimum amount of disruption to the Listed structure.Before Arti could proceed with the installation, they first had to re-level the existing concrete slab in order to provide a flat and stable floor.With the structure fully prepared, Arti could then proceed with installing a full cavity drain waterproofing system. This consisted of installing Newton 508 with minimal MultiPlug fixings to the walls and floors to capture the ingressing water. The water is then directed via Newton Basedrain channels to a Titan-Pro sump chamber, for removal by dual NP400 clean water pumps.The complex basement space included existing columns, windows and an internal staircase which all had to be factored into the waterproofing design.Regardless of this, Arti Construction completed the 280m2 installation within budget in just one week, delivering a reliable Type C structural waterproofing system that is also compliant with British Standard 8102:2009.
Sponsored
N06 East Village

N06 East Village

SELO

This scheme was designed by the architects Hawkins Brown and constructed by Mace, who were very easy to work with and have a great project team.One of the main challenges of the project was the fact that is was being constructed during lockdown, and both design team and project team were all working from home, but because of such good communications across the teams, everything flowed very well. N06 East Village is located at the site of the former 2012 Athletes Village and close to the London Olympic Park 2012, so there’s plenty of sports locations nearby!The façade sections were constructed using a modern method that involves some manufacturing and assembly being completed offsite. They were pre-assembled and fixed offsite onto the precast concrete floor units and this new high rise construction solution, removes the need for scaffolding Because each floor is fully enclosed, it reduces project time and the risk of site operatives working at height and increases project speed time with less labour needed on site. This was especially beneficial considering construction was during the Covid-19 pandemic. It is believed that throughout this project there was 40% less vehicle movements to and from site and 70% less site waste created.*We supplied the original Quadra metal riser doors throughout the two residential towers however we have since improved the doorsets and they are now Quadra+. N06 East Village project has a modern interior with bright, bold colours featured on both the inside and the outside façade. Selo’s concealed riser doors were a perfect fit with their interior design providing a sleek, flush solution throughout the corridors.This project was one of the first major projects that we supplied our Quench fire-stopping protection to after they requested a factory fitted fire stopping solution. Quench is a safe and reliable solution that is pre-fitted to the riser door frame, removing the need to apply intumescent mastic. It has a 120minute fire resistance rating when used in conjunction with Selo’s Quadra+ riser door system. This solution removes the need to work inside the riser to apply the intumescent and thus removing the fall risk and hazardous working environments.*Source: https://www.cast-consultancy.com/knowledge-hub/plot-n06-east-village/
Sponsored
Chobham Manor

Chobham Manor

Keyfix

IntroductionThe Keyfix Non-Combustible Cavity Tray System has played an important role in futureproofing a major new residential development in Stratford’s Olympic Park by exceeding new building regulations whilst improving build quality and installation efficiency on site.OverviewLocated in the very heart of the Queen Elizabeth Olympic Park, Chobham Manor in East London is the first of five new neighbourhoods in the former home of the 2012 Olympics. Comprising 850 new one, two and three-bed homes alongside community facilities, shops, public green spaces and community areas, this stunning new development has sustainability at its core with all homes built to the Code for Sustainable Homes Level 4.In a design by JSA Architects and built by Taylor Wimpey, the layered brickwork façade features projected bay windows, balconies and set back terraces. To meet the requirements and a tight build programme, Keyfix worked with subcontractor Chine Brickwork and supplied 4545 metres of Keyfix Non-Combustible Cavity Trays (NCCT) along with Corner Units and Weeps on blocks A, B and C which form Phase Four of the development.ChallengeThe challenges for Keyfix were the unique brickwork build programme which incorporated two runs of cavity trays being supplied per floor to accommodate brickwork corbelling and recessed brickwork.SolutionAs the corbels where built at a different stage on the build programme so the Keyfix Non-combustible Cavity Trays had to project out either side of the pier when initially being installed. Therefore, when the infill corbels where being built the continuous run of tray could link in seamlessly. A task that would have been near impossible had the system relied on tapes or mastics to make the linking joint.The Keyfix stainless steel NCCT was specified due to its self-supporting system which doesn’t need fixing back to the internal concrete frame and clips together for fast and easy installation. It is essentially a ‘Fix & Forget’ solution with no additional fixings, sealants or onsite fabrication required by the brickwork contractor. Therefore, installation of the trays did not impede the speed of bricklaying even when compared to traditional DPC. Installed in the outer leaf with no connection with the inner skin, this innovative cavity tray system does not create a thermal bridge and eliminates all differential movement issues.With a lifespan of 125+ years it is the only non-combustible cavity tray system that does not rely on tapes and mastics to make watertight joints, therefore elimating one of the main reasons for product failure.Commenting Kieran Coyle of Keyfix said: “Holding an A1 Fire Rating, the Keyfix non-combustible cavity tray solution exceeds the minimum standards set out in ADB (Approved Document B), whilst ensuring this new development meets and exceeds the latest regulations. If the regulations become stricter, it will also be futureproofed maximising the whole-life value of the development.”The award-winning Chobham Manor Phase Four is now complete, with the Keyfix Non-combustible Cavity Tray playing an integral part in the creation of a safe and resilient development that will transform the Olympic Park into a lasting legacy for East London.For more information about the Keyfix range of non-combustible solutions download the product guide, visit https://keyfix.com/or for technical support call 028 8676 7508 or email info@keyfix.com
Sponsored
ABP Southampton

ABP Southampton

Berry Systems

Supply and installed Wire Rope vehicle restraint system for our client Morgan Sindall on behalf of Associated British Ports in Southampton. Brisafe Wire Rope solution was installed that is affixed to the structural columns of the car park to assemble the unique system with zero footprint, maximising the car park space.
Sponsored
Type C waterproofing system for Notting Hill basement

Type C waterproofing system for Notting Hill basement

Triton Systems

Triton approved contractors, Advance Property Preservation, installed a Type C (BS 8102 2009) structural waterproofing system in the construction of a luxury domestic basement. The property is a late Victorian, six-bedroomed detached home in Notting Hill, London.
Sponsored
Waterproofing vaults (using Type C Systems)

Waterproofing vaults (using Type C Systems)

Delta Membrane Systems Ltd

Vaults are a common feature of 18th and 19th century buildings in Bath. Originally built to support the cobbled streets above and were a constructional response to the precipitous topography that surrounds Bath, in order to provide a level site. Many of the vaults within historic Bath suffer with water ingress and damp related problems. Incorporating best practice guidance - Type C Waterproofing Systems (BS 8102: 2009) a Type C System was used to keep this historic vault watertight and dry.
Sponsored
Historic Bridge Restoration - Bervie Jubilee Bridge, Scotland

Historic Bridge Restoration - Bervie Jubilee Bridge, Scotland

C-Probe Systems

Jubilee Bridge was constructed in 1977 - chloride contamination was causing corrosion of the suspended and cantilever reinforced concrete support beams, half-joint elements and the soffits of the beamsICCP was used to protect cantilever beams, half-joints and suspended slab elements. Over 8,500 anodes were drilled in and are controlled in 20 zones with separate control of the beams and the half-joints.
Sponsored
Davits Systems for Rope Access - Clarendon

Davits Systems for Rope Access - Clarendon

Sayfa Group Ltd

Clarendon is a project undertaken by Berkeley Group in North London, as part of a regeneration scheme that will provide over 1,700 homes and 125,000 sq ft of commercial space.This project aims to make the best use of brownfield land and also highlight the benefit of master planning which helped the scheme win “the best 2022 planning award”.Sayfa Group supplied the Clarendon project through a partner contractor, responsible for the height safety and façade access systems throughout the project. There were various base types and styles required for a variety of locations such as balconies, terraces, and rooftops. However, of all the varieties there is no greater example of planning ahead than the Cast-In Davit Base.Why Davit cast-in bases?Davit systems are an essential solution for cleaning and maintenance strategies. They provide easy and safe access for rope abseil teams to access a building's façade.Cast-in Davit bases are the most cost-effective type of base for both initial and life cycle price basis. The Davits bases are set out to specific datums and are generally tied into the rebar instead of the traditional process of drilling concrete and resin fixing. The process for which is often time consuming, highly weather dependent, and prone to human error. The method of casting in bases accelerates the programme by removing interfaces and potential delays between the trade activities of installing the posts and insulating/weathering the surface. Beyond installation the ongoing maintenance price or 'lifetime cost' of 6 monthly LOLER inspections is significantly reduced. Non-cast in Davit Bases require a thorough examination of the fixings which may include torque testing if required. Visit our LOLER Testing and Inspection Guidance for more information.To learn more about our EdgeSeil range visit our Products Page or get in contact with the Sayfa Group Team.
Sponsored
Riverside Terrace

Riverside Terrace

Forbo Flooring Systems

FORBO’S MODUL’UP VINYL CREATES WELCOMING MATCH-DAY SPACE A unique hospitality space located in Cardiff’s iconic Principality Stadium, the Riverside Terrace is notable for its move away from the traditional match-day hospitality experience. To create a premium experience, Design and Build Specialists Benchmark Designs called upon Forbo’s adhesive-free sheet vinyl floor covering – Modul’up.  Situated on the banks of the River Taff, the Principality Stadium plays host to a range of events and is renowned as the home of Wales’ Rugby Union team. Working with PSE Wales and Levy UK, Benchmark Designs looked to create a distinctive interior space, capable of offering a premium match-day experience for general admission visitors. Combining a variety of furniture and surfaces with a diverse street food menu, the Riverside Terrace was designed with the city high street in mind, as Hannah Glazier, Interior Designer at Benchmark Designs, explains: “The brief we received for the Riverside Terrace was to take this space and transform it from a traditional food service and interior style, to something with a more up-market feel that had a broad appeal to customers.  “Cardiff’s high street has such a wide range of street food eateries and PSE Wales were keen to incorporate this heritage into the Riverside Terrace, with a different vendor selected to cater each match, along with live music. With such a dynamic environment, we needed products that would complement the usage of the space, providing a practical and refined finish. For this, texture was a really important design element and we wanted to make sure the surfaces we specified would complement and contrast with each other.” With this brief in mind, Hannah looked for flooring solutions that would deliver on the desired aesthetic and feel, stating: “The space itself had a very industrial design, with exposed fixings and a metal-studded bar front adding different textural dynamics. With texture and visual quality in mind, we needed a floor covering that came in neutral shades to match the other finishes, but that could also create a warm and welcoming environment. It was for this reason that we specified Forbo’s Modul’up, in its Concrete and Oak colourways combining the texture and tone of concrete with the warmth of timber.  “The realistic timber appearance of the Oak colourway was ideal for the zoned seating area, while we used the Concrete for the circulation areas, as it nicely matched the design scheme for the walls and bar tops. It was important that we used these complementary colours throughout the entire interior, from wall to floors, lighting to surface tops, helping to create a cohesive and well-rounded space, which feels welcoming yet distinctive.” However, it wasn’t just the aesthetic requirements that were key, but the functionality of the flooring too. Hannah explained: “With a capacity of over 74,000, the Principality Stadium is an extremely busy environment. As such, it was essential that the floor coverings used were able to keep up with the high footfall expected at the venue. This was another reason behind our specification of Modul’up. It has excellent indentation resistance, which was perfect for this space, being able withstand intense usage on match-days. It’s also able to be installed adhesive-free, which made it extremely easy to fit, saving valuable time during the installation phase of the refurbishment.”  She concluded: “Our intention was to create a fun and informal space that was suitable for all demographics to use. We feel we achieved this, with our use of versatile and flexible furniture, wall and floor materials contributing to a relaxed and casual hospitality experience.” Having opened in October 2022, the Riverside Terrace has been put to good use over the 2022 Autumn Nations Series, as well as the 2023 Six Nations, with a PSE spokesperson saying of the new space: “Forbo’s flooring has truly transformed the space, with its exceptional quality, versatile design and hard-wearing nature contributing to a modern and trendy atmosphere. The choice of flooring seamlessly merged functionality with style, making it an ideal option for entry-level hospitality settings. Overall, we’re delighted with the finished project and have enjoyed entertaining our customers in the new space.”  Benchmark Designs’ work on the Riverside Terrace saw the project achieve ‘Commended’ in the 2022/23 iteration of the Forbo Escapes competition. Find out more about Forbo’s Modul’up collection, here: https://www.forbo.com/flooring/en-uk/commercial-products/modul-up-adhesive-free-sheet-vinyl/cum7pa

Showing 253-288 of 2275

Feedback