3 SNOWHILL QUEENSWAY, BIRMINGHAM

OVERVIEW

Built in the heart of Birmingham, this building has 18 floors steel frame around 3 concrete cores. Being a very constrained site, close coordination was required with the structural steel frame contractor. Two deliveries a week were required to ensure their programme was met.