This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more
OVERVIEW
Jubilee Bridge was constructed in 1977 - chloride contamination was causing corrosion of the suspended and cantilever reinforced concrete support beams, half-joint elements and the soffits of the beams
ICCP was used to protect cantilever beams, half-joints and suspended slab elements. Over 8,500 anodes were drilled in and are controlled in 20 zones with separate control of the beams and the half-joints.
Contact C-Probe Systems by clicking the button below to find out which products were used in this case study.
Historic Restoration - 37 Fleet St, London
Historic Restoration - Bok Tower, Florida (USA)
Historic Restoration - Terry's Chocolate Factory York
Reinforced Concrete Restoration - Omni Centre Car Park, Scotland