NBS Source
I'm a manufacturer

"central refrigeration plant"

2,467 results found

Sort by:

Showing 37-72 of 722

Sponsored
Premier Loft Ladders provide a safe, convenient and discrete solution for access to a premium car dealership plant room

Premier Loft Ladders provide a safe, convenient and discrete solution for access to a premium car dealership plant room

Premier Loft Ladders Ltd

Premier Loft Ladders has helped Horizon Construction provide a safe and convenient access solution to a 1st floor plant room within a premium car showroom. What made this project particularly challenging was the 1.8m deep ceiling void. In addition, the access point was also in a prominent location outside the showroom offices. The solution was a bespoke Supreme heavy duty loft ladder. It offered a safe, discrete and easy-to-use solution for access to the car dealership plant room.Read the full case study...
Sponsored
Sustainable security and noise management for new Cambridge Central Mosque

Sustainable security and noise management for new Cambridge Central Mosque

Jacksons Fencing

Taking 10 years to build, and costing £23 million, Cambridge Central Mosque is the first purpose-built mosque in the city, being described as ‘the greenest mosque in Europe’. To reduce the noise impact for both local residents and worshippers, our Jakoustic® Reflective acoustic fencing was installed, resulting in a safe, secure, anti-climb perimeter with an aesthetically pleasing noise barrier that blends in with the surrounding area. This is achieved using a flat timber profile along with interlocking ‘V’ boards which reduces the rate at which sound waves can pass through the barrier.
Sponsored
Glass balustrade +  Spotlight - Central staircase The Building Centre London

Glass balustrade + Spotlight - Central staircase The Building Centre London

Q-railing

The Building Centre, London’s premier architecture and construction gallery, invited Q-railing to re-design its central staircase. It supplied a staircase balustrade with LED lit handrails and a frameless glass balustrade for the void. John Bonning, the Building Centre’s commercial director said: “We applied glass risers to each solid oak tread, which safely created the same floating stair effect as the original but made the stair compliant with modern building regulations. The materials reflected the quality of the Building Centre, whilst drawing natural light into the lower gallery.”
Sponsored
Campus Central, University of Stirling

Campus Central, University of Stirling

Knauf Ceiling Solutions Limited

Award Winning Landmark RedevelopmentThe £21.7m Campus Central landmark redevelopment at the University of Stirling scooped the award for the best building in the Education Category in the 25th Scottish Design Awards, July 2022 and won the Scottish Regional Category for the National RICS Awards 2022 – Commercial Development.The aspiration was to enhance the entrance setting of Queen’s Court by putting it at the heart of the University. The life and activity of the new building spills out onto a pedestrian friendly environment that can flexibly accommodate a range of uses throughout the year. The innovative design strategy frees up Queen’s Court from all traffic, relocating bus stops and a new transport hub at strategic locations to access the wider campus.Seamlessly linking three buildings together presented structural and design challenges particularly for the ceiling landscape. With different ceiling heights and the creation of a 5,000sqm space, a versatile ceiling material providing high acoustic performance was required. Retaining the original late modernist building’s structurally impressive interior, the new extension offers a flexible form with exposed in-situ concrete, glulam and cross laminated timber. The choice of Knauf Ceiling Solutions materials was vital for the design in helping define the different student spaces and through its high performance ensure optimum sound absorption. HERADESIGN® Superfine in a Natural colour was installed throughout to create a seamless and unified space, visual impact and to ensure the optimal acoustic control.
Sponsored
FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY™ TBA

A Manchester based passive fire protection specialist has utilised products from the range of FIREFLY – including the versatile Phoenix Smoke & Flame barriers – to achieve the compartmentation of concealed spaces within the new Macclesfield manufacturing facility of a world-leading pharmaceutical giant.Firetech UK Ltd. is a key sub-contractor to DES for the construction of the extensive new laboratories and production plant for AstraZeneca, part of the FTSE 100 company’s continuing investment at its East Cheshire site for the distribution of drugs to markets around the world. Firetech was established more than 25 years ago and makes extensive use of FIREFLY  flexible fire barriers for its work on both commercial and domestic contracts. In the case of the Macclesfield project, Firetech purchased the FIREFLY  products via national distributor, Encon.  The Contracts Manager for Firetech UK on the Macclesfield Project, Josh Dodds comments: “We work nationwide though predominantly in the North-West of the country and have been using FIREFLY  products for the past five years, including here on this very large new plant.  Early on in the contract we installed a large quantity of Titan Lite™ 120:60 fire barriers in the ‘Amenities Area’ of the building and then when we were tasked with installing a series of smoke and flame barriers in the ceiling voids over the laboratories, we proposed the Phoenix product as being the most cost-effective solution. The work consumed approximately 540 square metres of the Phoenix to create a series of vertical barriers valued at some £50K.  Although we were able to employ standard details for the installation of the Phoenix barriers  and the Collaroll which wraps some of the beams and other features, FIREFLY has been involved from the earliest stages, providing general guidance and carrying out inspections.  The project has gone very well.”FIREFLY Phoenix is a lightweight smoke and flame barrier which facilitates compartmentation within buildings to provide up to 120 minutes’ integrity under BS476 Parts 20 & 22.  Certified by IFCC, the flexible and straightforward to install material is suitable for both new-build and retrofit situations.  Manufactured from woven and non-woven glass, the FIREFLY range is designed to optimise resistance to flame and smoke as well as offer heat protection in a wide range of scenarios. The flexible barriers are easy to install horizontally or vertically using a full selection of ancillary products.  Used mainly in the construction industry across the UK and Europe, FIREFLY fire barriers help to contain fire, giving building occupants extra time to evacuate and the fire service to enter safely.Images shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
Fusion - Central London | A Bespoke Fusion Mailbox

Fusion - Central London | A Bespoke Fusion Mailbox

The Safety Letterbox Company

THE PROJECTThe NEW Fusion mailbox is the essence of innovation; this luxury development is in the heart of London and offers the ultimate elegance and style for its’ residents. Mivan Marine LTD approached The Safety Letterbox Company with a specific cutting-edge, design requirement for their mailboxes, SLB managed to interpret that design with such precision, the outcome was extraordinary and truly stunning.The new development on 48 Carey Street located just opposite the Royal Courts of Justice and the Royal School of Surgeons is a 10-storey block consisting of 1, 2 and 3 bedroom luxury apartments with underground parking and leisure facilities.THE PRODUCTSLB created a truly unique, high-end, brand new product for this luxury development in central London. Incorporating multi-point opening, anodised materials, exceptional engraving detail and Italian stone cladding, SLB was delighted to create such a beautiful and visually exciting arrangement, turning the client’s vision into reality.These mailboxes are recessed into the wall with front entry and front retrieval, arranged in 2 banks; the first configuration is 13 high by 10 wide, and the 2nd is 10 high by 10 wide.
Sponsored
Angel Central Shopping Centre, Islington (2020)

Angel Central Shopping Centre, Islington (2020)

Artform Urban Furniture Limited

Angel Central is a popular shopping destination in Islington, London. Famous for its beautiful Angel Wing sculpture that is situated at the entrance. Artform were invited to provide a selection of street furniture elements that would complement each other and the new improvements. The Strata Beam Bench and Seat has subtly faceted concrete legs that create an interesting play between light and shadow, the timber slats match the flooring chosen for the bridge.The Ecomix Litter Bin continues the theme of angles and light with a grey body and white top. The Box Litter Bin was also chosen for an uncovered area, the timber front panel coordinated with the seating. The street furniture package was picked to deliver sophisticated design and a continuity with the new landscaping and architecture. 
Sponsored
Vista V512 Glass Balustrades for University of Liverpool's Central Teaching Laboratory

Vista V512 Glass Balustrades for University of Liverpool's Central Teaching Laboratory

Delta Balustrades Ltd

Vista V512 Glass BalustradesVista 512 point fixed, glass infill balustrade system enhanced the dynamic and innovative design of the £13m University of Liverpool, Central Teaching Laboratory.The three storey, high quality and contemporary learning facilities was designed for a wide range of users, including those from other universities and the private sector.
Sponsored
The Biggest Hydropower Stored Plant in Europe Trusts MSA for its Fall Protection

The Biggest Hydropower Stored Plant in Europe Trusts MSA for its Fall Protection

MSA Safety (Latchways) – Fall Protection

750 metres deep inside a Welsh mountain lies the biggest stored power plant in Europe. With its remote location and harsh operating environment, Engie First Hydro contacted the Latchways team at MSA Safety to provide the complete solution for all its operational and maintenance fall protection needs. 7 million cubic meters of water are pumped through the giant turbines to generate power and then reversed as pumps to return the water to the reservoir. This tough working environment presents unique safety challenges for the electrical & mechanical operational and maintenance teams when working at height.
Sponsored
Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins

Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins

Lang+Fulton

Lang+Fulton were asked to supply louvred screening to provide shelter and a visual barrier for the café and outdoor pool areas at the Portavadie Marina Resort. A 2.5m high screen of Italia-100 panels was installed to provide 100% visual screening. The louvres have a free area of 29%, which helps to reduce wind loading, but, in order to cope with potential storm force conditions, the RHS posts were specially designed in accordance with BS EN 1991-1-4. A store area for bins and a secure compound for service plant fored an additional part of the contract. The steel louvres were polyester powder coated in a muted grey (RAL 7015) to a marine grade standard of finish to blend with the surroundings and withstand the harsh coastal climate.
Sponsored
The Core, Science Central

The Core, Science Central

Sotech Ltd

Sotech supplied Optima FC secret fix rainscreen panels andoised in Regency Gold 2 finish. The project won awards such as CEEQUAL 'Excellent' award, for being an incredible example of sustainable building, and the legacy sustainability award, from the 2015 constructing excellence in the North East (CENE) awards. The building include horizontal and vertical fins spanning out from each floor, created so that the gold anodised fins on the mid points of the panels hang over the floor creating a picture frame effect. We also saved precious site installation time by fitting the fins onto the panels at our manufacturing facility.
Sponsored
Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.

Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.

Brett Landscaping

Halton Borough Council had an easy decision to make in choosing Brett Landscaping to work on a key infrastructure project on the major traffic route. Brett Landscaping offered Halton Borough Council specialist advice before and during installation of their Trief Containment Kerbs at the Kingsway Central Reservation Redevelopment in Widnes. The project was to rebuild and renovate a dual carriageway’s central reservation which featured low-level walls retaining grass verges that were showing signs of damage due to a combination of weathering and rainwater pressure behind the wall. To view the whole case study please click the link below.
Sponsored
US Homegrown Craft Beer Sensation, Brooklyn Brewery, Chooses Fresh Floor Finish for Williamsburg Plant Upgrades?

US Homegrown Craft Beer Sensation, Brooklyn Brewery, Chooses Fresh Floor Finish for Williamsburg Plant Upgrades?

Flowcrete – a brand of Tremco CPG UK Ltd

Bucking the trend for dairy brick, Brooklyn Brewery opted for close to 8,000 sq. ft. of urethane cement for major upgrade works to its manufacturing facility located at the former matzo plant where it has operated since 1996.
Sponsored
Restoration and Reverberation at Liverpool Central Library

Restoration and Reverberation at Liverpool Central Library

CMS Danskin Acoustics

When American architect, Louis Sullivan, in 1896, said, “Form ever follows function” he probably hadn’t foreseen the creation of the Statutory List of Buildings of Special Architectural or Historic Interest that would have its origins in the devastation left in the wake of the Second World War.The ChallengeThe preservation of old buildings is challenging enough but additional issues arise when it comes to refurbishments and renovations, particularly if there is a material change of use. Suddenly, a building that was created for one purpose is given another, sometimes radically different, purpose. The form can’t follow the function if the function is allocated post-construction. Significant modifications can help align an old building with its new function but, in the case of Grade II listed buildings, for example, the interior can’t be fundamentally changed and function is forced to compromise.Even when there is no significant change of use, modern building regulations demand performance standards that didn’t even exist at the time that buildings currently being renovated were originally envisioned and created. The requirements of Part E of the Building Regulations, governing soundproofing between floors of a building, are relatively easy to shoehorn into a renovation project as these tend to be concealed beneath floor finishes and screeds. Problems with reverberation are far more difficult to tackle and even though there is very little regulation surrounding this issue, BB93 of the Building Regulations, governing reverberation levels in schools, tends to be employed as an effective benchmark.When reverberation levels reach a certain point, they can become more than just an irritation, with the overlap between what is currently being said and what was said a couple of seconds ago becoming genuinely disruptive. In schools, this can make it extremely difficult for children to follow what their teacher is saying. For this reason, BB93 demands a reverberation time of 0.8 seconds or less, with 0.4 seconds being seen as ideal. Reverberation time is described as the time taken for the sound pressure to fall by 60 decibels after the original sound has ceased abruptly. So, in the case of BB93, 0.8 seconds or less after a sound has been made, that sound should have decreased by 60dB. 60dB is a significant drop, the difference between a construction site with pneumatics drills and a busy department store.It is in situations like this, when form and function appear determined to have nothing to do with one another, that architects and the designers of construction materials are driven towards increasingly innovative and paradigm-shifting solutions. The stereotype of the architect who is concerned only with form and is completely disinterested in function is, thankfully, a thing of the past (if these individuals ever really existed at all). Modern architects don’t create buildings so much as living and working spaces, where physical aesthetics are neatly balanced with a host of other concerns, such as the quality of an environment’s acoustics.Although regulation sets crucial, legally-enforceable parameters, few architects need to be incentivised to aim high when it comes to a building’s acoustics.This drive towards innovation has resulted in widely differing solutions. Reflector panels and diffusers redirect sound waves or disburse them more evenly through the listening environment, reducing nuisance noise. These solutions tend to be employed in lecture halls or auditoria, where a certain amount of volume is desirable, but the quality of the sound is crucial. The most commonly employed anti-reverberation product is the sound absorption panel. These fabric covered panels are mounted on the walls of a room or suspended from the ceiling. When the sound wave enters the open cell structure or fibrous composition of the panel, it bounces around like a pinball. The friction resulting from each instance of impact is converted into low-level heat which is absorbed into the material. When the sound wave re-emerges, its energy, and consequently its ‘loudness’, is significantly diminished. This tends to be the solution of choice for classrooms and is generally considered to be the quickest and most cost-effective route to BB93 compliance.Some acoustic challenges are more demanding than others. The renovation of the Picton Reading Room, part of the £50 million redevelopment of Liverpool Central Library, being a case in point. Not only is the reading room contained within a Grade II listed building, it also boasts an elaborate coffered saucer dome. Domes are something of an acoustician’s nightmare, as they focus rather than distribute sound, exacerbating reverberation problems. All of which means a dropped pencil in the Picton Reading Room sounds like a Keith Moon drum solo. Why Cornelius Sherlock, the reading room’s architect, decided to incorporate a dome – one 100 feet in diameter and 56 feet high – into his design for a space that was intended for quiet study is a little bewildering, even if his work does predate Sullivan’s remarks by a couple of decades.Thousands of hours of work have gone into restoring the ceiling of the Picton Reading Room, with plaster, paint and gold leaf being matched as closely as possible to the original 1875 design. Given the need to be true to the form of the original, certain anti-reverberation solutions were unworkable. Reflectors, diffusers and baffles couldn’t be suspended from the ceiling, as all those thousands of hours of work would be hidden from view and the Nineteenth Century aesthetics undermined. Wall-mounted sound absorption panels were not a viable option, as there was very little wall to speak of, with three levels of solid wood bookshelves encircling the room, almost up to the beginning of the dome.Recent innovations in the area of acoustic plaster held the solution. Sound absorbent plaster has been around for some years, offering a smooth appearance which conceals a porous, granular structure similar to that found in sound absorption panels. However, until recently, the amount of sound absorption offered has always been limited to Class ‘B’ and Class ‘C’. Now, however, Class ‘A’ acoustic plaster systems are available. It was just such an acoustic plaster that CMS Danskin used for the Liverpool Central Library project.Because of the limited surface area in the Picton Reading Room, Ellie Morris, CMS Danskin’s Technical Support Coordinator, hit upon the idea of applying the acoustic plaster into the soffits beneath the balconies of the upper shelving areas. The results were a resounding (or un-resounding) success. A relatively small amount of an innovative product, cleverly applied brought a 138-year old listed building’s acoustics in line with contemporary standards and not a hint of compromise in sight.
Sponsored
Specially Designed Expansion Joint Covers at Grand Central Birmingham

Specially Designed Expansion Joint Covers at Grand Central Birmingham

Construction Specialties (UK) Ltd

Birmingham New Street Station and the old Pallasades shopping centre has undergone a £600m redevelopment and has now become Grand Central Birmingham. Heavy duty movement joint covers were required for both the centre and its adjoining multi-storey car park to prevent damage due to excessive traffic. CS provided the heavy duty APF Series for the shopping centre’s interior. They are very strong against rolling loads as well as distortion and wear. The robust KB Series joint covers were provided for the multi-storey car park, featuring a unique centre plate with a 1000kg loading capacity.
Sponsored
Refurbishment of Victorian Warehouse, Central London

Refurbishment of Victorian Warehouse, Central London

Lomax + Wood Limited

High performance made-to-order timber box sash and weights were supplied, by Lomax + Wood, to this refurbishment of a former Victorian tea warehouse near to the Old Street Roundabout in central London.Lomax + Wood designed, supplied and fitted their made-to-order timber box sash windows which preserved the heritage of the Victorian building while still providing modern performance. The windows varied in size up to 2.4m high so were integral to ensuring natural light flooded into the contemporary spaces that were created within the 1,400m² scheme.60 Lomax + Wood timber box vertically sliding sash windowsSite survey and full CAD drawings providedTop and bottom sash hornsDual finishElegant 20mm wide glazing bar in combination with double glazingAntique brass ironmongerySilver supply and fit installation serviceThe traditional timber sash windows are manufactured from engineered knot-free timber for strength, stability and durability. The factory finished paint system is spray applied and micro-porous which allows the timber to breathe. All the frames are supplied factory finished, with all ironmongery including espagnolette locking. The timber windows and doors are double or triple glazed internally for security, all are tested independently to achieve PAS 24:2016, BS 6375 Part 1, 2 and 3.Lomax + Wood are committed to sourcing from sustainable sources, to this end we have worked hard to achieve FSC® Chain of Custody which is deemed by many to be an environmental gold standard. This work was undertaken in partnership with BM TRADA who are also deemed to be a mark of quality in our industry. FSC® Chain of Custody is not the same as a timber window and door supplier providing FSC® documents for the timber alone. The Lomax + Wood FSC® Chain of Custody ensures the product is FSC® from source through to installation, if Lomax + Wood site fitting is specified, which is within the scope of our certification.The timber windows and doors were surveyed and installed by Lomax + Wood to provide the customer with a single point of contact. Lomax + Wood offer a wide range of installation packages which vary to accommodate the varying requirements of any project, for example, the Bronze package is for new build projects where a builder is on-site, while the Gold is for existing properties where the customer is looking for the most complete service possible without calling in other trades.Lomax + Wood are able to provide a made-to-order timber window and door solution to architects, private customers, developers and builders across the UK and our website demonstrates the vary varied styles and projects that we have been involved with.Lomax + Wood provide made-to-order timber windows and doors, including composite aluminium clad with a supply only or supply and fit option. Available with specialised double, triple or single glazing to meet performance and conservation are requirements. Contact us today to learn how we can help you with your project or so we can provide you with a quotation for replacement sash windows.
Sponsored
TERRABOUND RESIN BOUND CYCLE PATH FOR CENTRAL LONDON HIGHWAY SCHEME

TERRABOUND RESIN BOUND CYCLE PATH FOR CENTRAL LONDON HIGHWAY SCHEME

Addagrip Terraco Ltd

Addagrip Terraco were delighted to see our BBA approved Terrabound Resin Bound porous surfacing installed at Constitution Hill as part of the new East-West Cycle Superhighway. The project will run through central London from Tower Hill to Lancaster Gate. The installation of this new stretch of the cycle path runs alongside Green Park to provide a safe route for cyclists from Buckingham Palace to Wellington Arch.BBA approved Terrabound Resin Bound surfacing was selected to provide over 2,200m2 of smooth, seamless, porous paving that would be hard wearing and provide good slip resistance for the cyclists. The natural aggregate finish in a 6mm Rhine Gold complements the location alongside Green Park and will provide a low maintenance surface in this very busy location.Working for Transport for London, F M Conway carried out the installation over a 9-day period working in one of the busiest tourist areas in Central London and during a period of very hot weather. The team started at Wellington Arch/Commonwealth Memorial end of Constitution Hill and finished the last 185m stretch outside Buckingham palace on Friday 8th July. Whilst the crowds gathered to watch the Household Cavalry ride up Constitution Hill from Wellington Arch, St James’s, London to Buckingham Palace there was also much public interest in seeing the team’s coordinated system of installing the resin bound surface and watching the transformation as it happened.The work was completed alongside the existing path that runs along Green Park so a metal edging detail was used, separating the Resin Bound surface from the hoggin surface around the mature trees that line the roadside.
Sponsored
Sandtex Trade raises the bar with Central London transformation

Sandtex Trade raises the bar with Central London transformation

Sandtex Trade, product of Crown Paints Ltd

SANDTEX TRADE scaled new heights to revamp a Central London office block – without a ladder in sight. 20 Farringdon Road has been transformed into a contemporary workplace in the heart of the city following a stylish refurbishment project undertaken by specialist abseiling contractors Rubynest. Their specialist ‘working at height’ team worked from temporary cradles to apply the Sandtex Trade trims system to metalwork on the building’s windows. Sandtex Trade Rust Inhibiting Primer Undercoat, Flexible Primer Undercoat and Eggshell X-Tra were used to create the on-trend black finish.
Sponsored
Grand Central, Birmingham

Grand Central, Birmingham

SAS International Ltd

The Birmingham New Street refurbishment completely re-imagined the Pallasades shopping centre situated above the station. SAS designed, supplied and installed several bespoke metal ceilings specified for the lower retail area within the mall: A mall link feature installed below glass reinforced gypsum features in the mall’s access areas.A lozenge shaped, metal can ceiling with integrated lighting, a slatted SAS700 linear ceiling and SAS320 alongside linear grilles. The aim was to create an ideal meeting place which would serve as a gateway to Birmingham. A massive 50 million people are expected through the door each year.
Sponsored
Upgrading physical perimeter security using 358 mesh, access control measures and crash rated systems for a water treatment plant

Upgrading physical perimeter security using 358 mesh, access control measures and crash rated systems for a water treatment plant

Jacksons Fencing

Following the brief outlined by the water treatment plant the proposal adopted for implementation was for the creation of secure access control. Bi-Folding Speed Gates topped with razor wire were supplied to each of the main entry and exit points to the site. These were supported by PAS 68 rising bollards and rising arm barriers with synchronised operation and traffic light signalling. The gates and barriers were flanked by runs of Jacksons Securi-Mesh® fencing to provide a separate pedestrian entrance to the facility, while static PAS 68 rated bollards were additionally deployed to manage traffic within the site.
Sponsored
Stair Edgings & Matting - Central Square, Leeds

Stair Edgings & Matting - Central Square, Leeds

Gradus

Gradus supplied R95XT11 PVC-u and CXT3 aluminium stair edgings to the main staircases to help protect against the risk of slips, trips and falls. Gradus also supplied a range of barrier matting to the development, including Esplanade 5000HD and Boulevard 5000HD.
Sponsored
MEDITE® TRICOYA® EXTREME chosen for MDF shopfronts for new central London design and retail hub

MEDITE® TRICOYA® EXTREME chosen for MDF shopfronts for new central London design and retail hub

MEDITE SMARTPLY

MEDITE TRICOYA EXTREME (MTX) now adorns the shopfronts of over 30 high-end retail and design spaces at the new Eccleston Place hub near Victoria station, central London. However, it’s far from an ordinary MDF. When thinking ‘high-end’, opting for an engineered wood panel over a hardwood alternative may not seem like an obvious choice, but MTX’s exceptional finishing qualities match like-for-like with its hardwood peers. What’s the difference then? To name but one, MTX’s 50-year external usage guarantee will protect the shopfront from the London weather for years to come.
Sponsored
MEDITE® TRICOYA® EXTREME chosen for MDF shopfronts for new central London design and retail hub

MEDITE® TRICOYA® EXTREME chosen for MDF shopfronts for new central London design and retail hub

MEDITE SMARTPLY

MEDITE TRICOYA EXTREME (MTX) now adorns the shopfronts of over 30 high-end retail and design spaces at the new Eccleston Place hub near Victoria station, central London. However, it’s far from an ordinary MDF. When thinking ‘high-end’, opting for an engineered wood panel over a hardwood alternative may not seem like an obvious choice, but MTX’s exceptional finishing qualities match like-for-like with its hardwood peers. What’s the difference then? To name but one, MTX’s 50-year external usage guarantee will protect the shopfront from the London weather for years to come.
Sponsored
Living space as a power plant: Solar house

Living space as a power plant: Solar house

Hawa Sliding Solutions AG

The «Plus-Energie-Haus» constructed by the Technische Universität Darmstadt is a Solar Decathlon winner. The competition has been held each year since 2002 by the US Ministry for Energy. The task is to design and build a residential house to suit life that is self-sufficient with regard to energy. The houses must cover their entire energy requirements through self-produced solar power. Between two layers is a protected external area with sliding windows and folding slat shutters that can be opened and closed as needed. The folding sliding shutters are equipped with HAWA Variofold 80 H.
Sponsored
Private Duplex Penthouse, Central London

Private Duplex Penthouse, Central London

Ironmongery Innovations Limited

When working with the client, architect and sub-contractor on a project where discretion is required, it’s difficult for us to promote the project, especially when we have made bespoke handles, specifically designed for the whole project.This project was over two years work culminating at a difficult time, where restrictions on visiting construction sites was in place.We worked closely with our manufacturing partner to provide bespoke handles, not only for the main swing doors, but also for the wardrobes and inter-connecting doorset.All the products were in a Dark Bronze, consisting of a lever handle on square flush rose, a flush pull for the wardrobes and a solid brass pull for the inter-connecting door.Attention to detail is always paramount on all our projects, with a high polish on the internal doors the finish on the face of the lever handle had to be a perfect sheen, to stand out against the dark door finish. To get this element right you need access to only the best finishers and manufacturers.We pride ourselves in the relationships we have built up over the years, these supply partners always meet the level of detail to which these projects demand, this is why we are asked back again and again to supply the ironmongery by our clients.
Sponsored
Campus Central, University of Stirling

Campus Central, University of Stirling

Senior Architectural Systems Ltd

Designed by Page and Park, this £21 Million project involved refurbishing the existing atrium space and constructing a stunning new 3000 sq.m. three-story building.  Inspiration was taken from the stunning location on loch Airthrey. Blending seamlessly into the landscape, the exterior features granite rainscreen, grey stone cladding and Senior’s SF52 curtain walling, chosen for its elegant slim sightlines and enhanced thermal performance.  Sustainability was further enhanced by installation of Senior’s patented ultra thermally efficient PURe® windows with an innovative thermal break, and robust SPW501 Doors, certified to PAS24 and Secured by Design standards. 
Sponsored
Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Falco UK Ltd

This is the new sleek and inconspicuous cycle hub recently designed, manufactured, supplied and installed by Falco at Hackney Central Overground Station.Greeting commuters to the west of the station, the 10m cycle hub has been fitted with a combination of both reinforced safety glass and sustainable hardwood cladding.A series of 48 spaces of the FalcoLevel-Premium+ two-tier cycle rack have been installed along with a FalcoFix 2.0 cycle repair station, LED lighting, CCTV security, branding graphics, a green sedum roof and secure mobile app access. Falco also installed five separate TfL London cycle stands located outside of the cycle hub.The green sedum roof, an increasingly popular feature for Falco shelters, supports the operators sustainable development plan by providing the many advantages associated with green roof systems as well as insulation for both heat and noise. A sedum roof both reduces water discharge as well as compensating for CO2 emissions.The FalcoSmart mobile app access system uses Bluetooth technology to provide Hackney commuters with secure access to the cycle hub using their own smartphone or tablet, removing the need for physical keys and fobs. Commuters are able to apply for access to the hub via Falco and having downloaded the ‘App’ are given access rights to the cycle hub for a period of time depending on their subscription.The images attached show the new cycle hub addition, installed to the west of the station, on Graham Road.Hackney Central is a railway station located on the North London Line within Greater London, serving 4.3m annual passengers.   Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities.For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on 01538 380080.
Sponsored
AKRI provides attractive planting solution in new public space

AKRI provides attractive planting solution in new public space

Furnitubes International Ltd

Furnitubes provisioned a number of AKRI raised planter beds for the scheme, the flexibility of the product permitted the creation of a unique stepped solution that was required at specific intervals in the planter to allow for the various changes in levels. A total of 26 meters of AKRI retaining walls were provided in heights of 670mm to accommodate the stepped solution, each planter comprising two internal soil retaining supports to provide increased strength to retain the contents. A return fold with additional anti-skates outlined the rim of the planters to maximise strength and not form a potential harmful edge.
Sponsored
James Jones picks EGGER Protect for latest processing plant

James Jones picks EGGER Protect for latest processing plant

EGGER (UK) Ltd

Leading timber processor, James Jones & Sons Ltd, specified EGGER Protect at its new facility near Lockerbie. The 18 acre Hangingshaw development is a strategic investment for the company, and EGGER Protect contributes to its successful implementation. EGGER Protect flooring was installed on all of the high-level walkways and access platforms around the advanced production machines. This application brings health and safety benefits, with the textured surface of the board offering market-leading anti-slip characteristics.The product is durable, easy to install and keep clean.
Sponsored
Retail | Sharjah Central Mall, UAE

Retail | Sharjah Central Mall, UAE

Venesta Washroom Systems Ltd

The ultimate in classic modernity, Infinite Full Height toilet cubicles deliver sleek, clean lines, flush-fronts and minimalist fittings. Not stopping there, the cubicles offer total user privacy thanks to full height doors, pilasters and partitions.As is typical in the United Arab Emirates, style is of paramount importance, so the design of the toilet cubicles could not be compromised by the need for durability.The privacy of these busy washrooms was equally as important so that safe, comfortable and secure facilities were available to all visitors.Our premium Infinite Full Height toilet cubicles were specified in heat, scratch and impact resistant High Pressure Laminate (HPL), which is an ideal material for heavily used areas.The ultimate in classic modernity, Infinite Full Height toilet cubicles deliver sleek, clean lines, flush-fronts and minimalist fittings. ‘Cloud’ and ‘Gunmetal’ were the colours of choice for the cubicles, complementing the décor of the modern washrooms perfectly.Read the full case study for more details.
Sponsored
Clement steel windows light up Central London hotel

Clement steel windows light up Central London hotel

Clement Windows Group

Part of the Melia Hotels & Resorts Group since 1999, Melia White House is situated in a striking Grade II listed Art Deco building close to London’s Regent’s Park. Following discussions with Camden Planning, the Clement EB24 range of new steel windows with welded G+ multi pane system was installed. In total nearly 800 windows were installed in two phases requiring the Clement team to work to an exacting schedule.
Sponsored
Teeside University Student Centre Living Wall, Middlesbrough

Teeside University Student Centre Living Wall, Middlesbrough

Biotecture Limited

This eye catching living wall sits in the central piazza of Teesside University in Middlesbrough. The Matrix film inspired planting design surrounds a large 36m2 LED information and interactive screen used in university social events.
Sponsored
Equinor Snøhvit - Chartek 7 - LNG (Liquefied Natural Gas) Plant & Export Terminal

Equinor Snøhvit - Chartek 7 - LNG (Liquefied Natural Gas) Plant & Export Terminal

International®, brand of AkzoNobel

Chartek 7 was specified for this project, as an epoxy intumescent coating with an outstanding track record of protection against hydrocarbon fires dating back to 1995. The PFP system had to be able withstand explosion loads in excess for 4bar while maintaining its integrity, and Chartek 7 easily met these requirements. Using Chartek also provided productivity benefits, due to its high build and simple meshing system, along with a low weight per unit area, helping to reduce transportation costs for pre-fabricated units.Pre-fabrication played an important role in this project, due to the harsh environmental conditions and remoteness of the site. Steel components were constructed at locations across Europe, with the emphasis on minimizing installation and delivery costs. The ability of AkzoNobel to provide standardized global products and a high level of technical support helped to streamline and add value to this process, complementing the productivity benefits of Chartek.
Sponsored
Central Public Works Department, New Delhi - Pyroguard Protect (EW & EI)

Central Public Works Department, New Delhi - Pyroguard Protect (EW & EI)

Pyroguard UK Ltd

Pyroguard’s range of toughened fire safety glass was recently installed inside this prestigious government building in New Delhi, India with framing partner M/s. Sukriti Doors.
Sponsored
Soundis Saddle System with Robust Detail FFT1 Acoustic Battens at Travelodge, Wembley Central, London

Soundis Saddle System with Robust Detail FFT1 Acoustic Battens at Travelodge, Wembley Central, London

Soundis

Travelodge was the first Budget Hotel brand to launch in the UK in 1985. Since then Travelodge has undergone a radical transformation, opening more than 500 hotels (over 37,000 rooms), and moving from being a roadside hotel chain to become one of the UK’s largest, and fastest growing, highly recognised budget hotel brands.Soundis supplied FFT2 Acoustic Saddle Cradle & Batten System as well as 70mm Soundproof FFT1 Acoustic Battens. Each of these systems are compliant with Robust Detail criteria and each are able to significantly reduce and improve Airborne and Impact noise performance levels.Our Cradle and Risers are manufactured from 100% recycled materials assisting to the sustainability targets of projects.
Sponsored
Canberra House

Canberra House

Bauder Ltd

Canberra HouseBauder Cold Applied LiquiTOP SystemSynopsisCanberra House is an office facility in Swindon. The existing single ply PVC waterproofing system roof was leaking and so Bauder carried out a full site survey. The resultant report gave the client several options to rectify the leaking roof.Bauder Building BoardProject nameCanberra HouseLocationSwindonProject typeRefurbishmentRoof size985m²SpecifierRapleys LLP (Bristol)Approved contractorCentral Roofing & Building Services LimitedThe specificationThe LiquiTOP system was chosen as it can be applied directly to the prepared and primed existing single ply covering. The liquid system allowed us to get into tight spaces and without the need for any hot works.LiquiTOP is excellent on refurbishment projects where the complexity of the roof involves intricate areas to be detailed that are not easily achieved with a sheet membrane, or the actual working space on the roof is constricted.Project challengesLarge areas of plant and machinery were situated just above the roof level making access to the areas below difficult with the plant in-situ. The available budget on this project did not allow for lifting or removing the plant, stripping the existing waterproofing system, and replacing with new. Therefore, the decision was made to overlay the existing single ply membrane with a cold applied liquid waterproofing which can be installed without the need to raise any plant.To overcome drainage challenges, secondary upstands were created under the plant and fabricated channels placed underneath allowing water to flow through to the drainage points.The resultBauder was able to offer a cost-effective solution without the necessity to remove or decommission the roof mounted plant and machinery. Cost reductions were achieved for the client by overlaying the existing roof, negating any need to strip existing materials, and not having to remove or raise the plant.The works were carried out by Central Roofing who manged the project impeccably and also finished ahead of schedule.System installedBauder Cold Applied LiquiTOP System1 LiquiTOP PU cold applied liquidA moisture triggered curing polyurethane waterproofing resin; applied in 2 coats, reinforced with Bauder LiquiTOP Glass Fibre Mat.

Showing 37-72 of 722

Feedback