NBS Source
I'm a manufacturer

"non relocatable partitions"

2,988 results found

Sort by:

Showing 289-324 of 760

Sponsored
Hull City Council, Hull

Hull City Council, Hull

K Systems Insulated Facades

Providing the solution for EWI retrofit on non-traditional build housingHaving successfully completing the previous 2 phases, K Systems were approached to provide a specification for EWI installation onto two non-traditional build housing types: 5M and Caspon. Both archetypes are of timber frame construction with single skin brick infills at ground level and a mixture of hanging tiles or cladding on upper floors. Typical of non-traditional build housing, the technical team at K Systems had to pay particular attention to bespoke detailing to derive a suitable EWI solution to meet the client’s requirements.The hanging tiles and cladding were removed from the upper floor(s) and replaced with timber sheathing boards to allow for a uniform aesthetic and a striking contemporary finish.Delivering a robust, safe and aesthetic system solution to meet the project requirementsHull City Council wanted to improve the thermal efficiency of their housing stock whilst provide a durable and more contemporary aesthetic look for the project. A combination of K Systems M Silicone and K Systems M VBriQ was used to achieve a u-value of 0.28 using varying thicknesses of A1 non-combustible mineral wool (80mm to 150mm) to adapt to the variety of substrates typical of non-traditional build housing. The combination of acrylic brick slips and polymer enhanced silicone topcoats achieved an appearance that is durable and elevated the dated look of the estate to a more modern feel. Our team worked extensively with the appointed architect preparing bespoke detailed drawings for the various archetypes, particularly transitions between the brick and timber substrates, cills, verges, rooflines, gas boxes and below DPC. Weekly demand planning meetings ensured timely delivery of materials to the appointed contractor.We ensured the correct fixings were specifiedK Systems commissioned pull-out tests to determine the optimum fixings and washers to be used to anchor the EWI system to the different substrates. A combination of hammer fixings and screw fixings were specified.
Sponsored
Tough, pale and interesting

Tough, pale and interesting

Bona Limited

To deliver a light, non-yellowing natural surface to existing oak floors, a combination of Bona White primer and Bona Traffic Natural polyurethane lacquer was applied. Bona White primer is designed to ‘whiten’ the surface from - as in this one coat application - simply providing a subtle pale sheen that inhibits any yellowing over time, to a true whitewashed look when two or more coats are applied. Bona Traffic Natural was chosen as the top coat because it maintains the non-yellowing look and feel of pure, untreated wood and, at the same time, offers superior surface durability.
Sponsored
Anodised Aluminium and Polyester Powder Coated Finishes On Aluminium Fascia Soffit At The Restaurant Story

Anodised Aluminium and Polyester Powder Coated Finishes On Aluminium Fascia Soffit At The Restaurant Story

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Tooley Street, London BridgeProject: RestaurantProduct: Raking Fascia Secret Fix Soffit Panels (facetted to both concave and convex radii)Finish: United Anodisers Anolok Bronze 541Fire Rating: A1 – Non-combustibleProduct: Plain Verge Fascia Finish: Syntha Pulvin RAL 7013 Brown Grey MattFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Tom Sellers Restaurant StoryArchitect: Spacecraft ArchitectsMain Contractor: McGee Ltd
Sponsored
Liquid gutter liner to metal gutter

Liquid gutter liner to metal gutter

Liquasil Ltd

This metal gutter was leaking in various places and several repairs had been undertaken over many years. Liquasil’s liquid gutter lining system was specified because the SWT primer actively treats any rust that is present and prevents further rusting. All joints and fixings are permanently sealed with Non-Sag Sealer. Non-Sag Sealer is a thixotropic coating with 1400% elasticity that easily copes with thermal movement associated with metal gutters. The final stage is the apply a single coat of Liquasil One along the entire length of the gutter, to provide a seamless, leak-free finish.
Sponsored
The Laboratory Gas Tap With NRV

The Laboratory Gas Tap With NRV

Arboles UK Ltd

Laboratory gas taps fitted with the NRV (Non Return Valve) will save a school money and time when it comes to maintenance. Want to know how? Read on.....
Sponsored
Addiscombe Oaks

Addiscombe Oaks

Keyfix

IntroductionThe Keyfix Non-Combustible Cavity Tray has been installed as part of a new-build project, Addiscombe Oaks in South London, helping to safeguard the development from fire and future building regulation changes.OverviewAddiscombe Oaks is a residential housing development designed by Gardner Stewart Architects (GSA) and developed by L&Q. This new-build development offers a selection of contemporary studio, one, two and three bedroom apartments. Conveniently located in East Croydon, residents of Addiscombe Oaks will benefit from quick transport links into London Bridge, Brighton and Gatwick airport, in addition to nearby shopping centres and parks.Working alongside brickwork contractor Lee Marley Brickwork, Keyfix supplied 2,200 metres of its Non-Combustible Cavity Tray (NCCT), 434 preformed Corner Units, 1,362 preformed Reveal Returns, 8,700 weep vents, as well as Non-combustible Cavity Tray Lintels (NCCTL) over 264 openings.The primary objective for the client was to ensure that the building was constructed in line with updated building regulations, and to ensure that the building would be future-proofed against potential regulation changes. Keyfix was able to meet this objective, as its NCCT is designed to last for the life of the building. The Keyfix NCCT is a fully compliant, A1 fire-rated system, manufactured using Class A1 Non-combustible Grade 304 austenitic stainless steel, resulting in a lifespan of 125+ years for the entire system. Therefore, its use ensures that the building is protected, should building regulations become stricter in the future.ChallengeFurthermore, the main challenge the client faced on the project was keeping to the tight project timeframes. The project ran from October 2021 to August 2022, and the main contractor required an accredited solution which could be delivered in line with the tight-build programme. Keyfix resolved this challenge by supplying products which improved buildability. In particular, the provision of preformed corner units helped to significantly save time on installation.SolutionThe Keyfix NCCT was specified due to its ‘self-supporting one-piece system’ which allows for an easy and efficient installation. The NCCT’s unique design incorporates a stainless steel tray to provide rigid self-support across the clear cavity and requires no reinforcement from the internal structure using mastics or tapes. This design saves precious time for the bricklayer and eliminates clashes with other components.Likewise, the Keyfix Non-Combustible Cavity Tray Lintel was specified due to its A1 Fire Rating, high performance stainless steel, and ease of installation. As the NCCTL requires no tape or mastics, it is a system that allows the contractor to ‘fix and forget’. The design of the NCCTL also incorporates mechanically fixed Stop Ends to capture and channel water outwards via the Keyfix NCW (Non-combustible Weep). The NCCTL is the maintenance-free solution that can accommodate openings up to 2822.5mm, with lintel lengths based on brickwork opening sizes with the range based on 215mm stretcher bond as standard.Moreover, Keyfix supports its clients with the provision of a technical review of architects drawings and a comprehensive schedule and location layout plan on every project. On Addiscombe Oaks, Keyfix engaged with L&Q and Lee Marley Brickwork early on so that any challenges could be resolved before construction took place, ensuring that the project ran smoothly. Keyfix’s team attended design meetings, followed up with calls to site, and provided a Tool Box Talk and CPD webinar presentations to provide technical support and educational resources alongside its products.Martyna Kielbasa, Senior Design and Technical Manager at L&Q commented: “The non-combustible cavity tray was specified as it aligned with the non-combustible scheme throughout the whole development. Keyfix’s representatives supported our subcontractor throughout the construction process by assisting with technical reviews, itemised schedules and sign-offs on specs.”Commenting on the NCCT, Kieran Coyle of Keyfix stated, “The Keyfix Non-Combustible Cavity Tray is an A1 fire-rated system, ensuring our customers peace of mind as their buildings are future-proofed and safeguarded against fire, in addition to onsite efficiency.”Addiscombe Oaks is now complete, with the Keyfix Non-Combustible Cavity Tray system having played an essential role in the construction of a safe residential development that is future-proof against possible regulation changes.
Sponsored
fermacell® helps School of Architecture get creative

fermacell® helps School of Architecture get creative

James Hardie Building Products Ltd

There’s no greater accolade for a building products manufacturer than being specified by architects for architects, and that is exactly what specialist partitioning board supplier fermacell® achieved at the University of Portsmouth. The £9 million building comprises large lecture theatre, seminar room, café and shop over the ground and first floors, and open-plan offices for academic and administrative staff and a post-graduate centre on the upper floors via floor plans which are easily divided and flexible.
Sponsored
Cassadian - Office

Cassadian - Office

Polyrey UK

Requiring a professional yet comfortable breakout area to welcome distinguished guests including civil servants and senior politicians, the Customer Experience Suite at Cassidian needed a bold and contemporary scheme to reflect the company’s principles of encouraging collaboration and innovation. The creative design solution provided by Paramount Interiors transformed the interiors into an open and well-lit environment with sleek features such as glass partitions and a plane tail rogue column nodding to Cassidian’s aeronautical connections and adding to a futuristic feel.
Sponsored
Klasse G-Board & C-Board | Trident Point, Harrow

Klasse G-Board & C-Board | Trident Point, Harrow

Klasse Group Ltd

A cladding replacement project, Klasse G-board and C-board have both been utilised due to their A1 fire-rated, fully non-combustible classification.
Sponsored
North London Heat and Power High Bay Lighting Hoists

North London Heat and Power High Bay Lighting Hoists

Penny Hydraulics Ltd

Setting the benchmark for UK Waste Authorities, North London Heat and Power are creating one of the most advanced Energy Recovery Facilities (ERF’s) in the world. The new EcoPark will turn non-recyclable rubbish into heat and electricity. Operating under strict regulations, the new site will become one of the cleanest and safest ERF’s in the world.Setting the benchmark for UK Waste Authorities, North London Heat and Power are creating one of the most advanced Energy Recovery Facilities (ERF’s) in the world. The new EcoPark will turn non-recyclable rubbish into heat and electricity. Operating under strict regulations, the new site will become one of the cleanest and safest ERF’s in the world.
Sponsored
Rockfon at revolutionary Passivhaus Harris Academy

Rockfon at revolutionary Passivhaus Harris Academy

Rockfon

Seven Rockfon ceiling and wall system ranges make valuable contributions to the innovative £40m Harris Academy Sutton, South London – the first Passivhaus secondary school in the country. Our acoustic, ceiling and wall systems are fully recyclable. Their thermal insulation and light reflectance properties help minimise the need for power to regulate heat and light. Non-hygroscopic and non-combustible, they are impervious to most environmental pressures, embodying very high humidity resistance, up to 100% RH. Architect Mark Martines commented, “They offer good sound control, absorption and reverberation, and allow us design freedom without compromising on performance.
Sponsored
33 King William Street, London

33 King William Street, London

The Outdoor Deck Company Ltd

The Outdoor Deck Company were specified to install high grade FSC Iroko timber decking to the large roof terrace area creating a stunning relaxation space. All decking and paving was installed on the Buzon pedestal support system and the wooden decking area was fitted with anti-slip strips to create an instant non-slip surface. The curved contrast between the paving and decking creates a soft visual appearance and takes you to different areas around the gardens. The entrance steps and risers made from Iroko premium grade hardwood include non-slip strips along the front edge of the steps.
Sponsored
A functional design for The Francis Crick Institute

A functional design for The Francis Crick Institute

Dortek Ltd

Working with the project architects, our technical team helped to develop the door specification for this state of the art 86,000sqm medical research facility. Dortek designed and installed more than 500 bespoke hygienic door and automation solutions throughout the facility. This included non fire rated and fire rated single action and sliding doors and hermetically sealing sliding doors. Our doors were essential for providing protection across hazardous fire areas. Our void free doors are hygienic, easy to clean, non absorbent and do not harbour bacteria. This makes them ideally suited to research laboratories which are sensitive to contamination.
Sponsored
Sydenham High School

Sydenham High School

Bushboard Washroom Systems Ltd

Bushboard were highly privileged to carry out this renovation of the school washrooms. Our Paraline range in SGL was chosen due to the high use nature of the school washrooms.The staff chose a sleek and simple design with doors in Stone White and partitions in Welsh Slate. The Ezeeduct panelling was also chosen in SGL. Feedback from the staff and children say the school washrooms have given the school a whole new lease of life. Read the whole case study on our website.
Sponsored
Metrotile Local Authority Refurbs, Scotland

Metrotile Local Authority Refurbs, Scotland

Metrotile UK Ltd

Metrotile continues to find favour with Local Authorities for the refurbishment of non-traditional housing stock, with East Ayrshire Council in Scotland the latest to specify Metrotile for such a project (more at link)
Sponsored
Nomad Tower New York City

Nomad Tower New York City

Planet

With a view to attracting more technology and media tenants to New York City’s NoMad Tower, owners Global Holdings and architects NELSON were keen to produce a dynamic, industrial-style space that fit in seamlessly with the vibrant and rich history of the surrounding neighbourhood North of Madison Square Park.The multi-million-dollar makeover of the 39-storey building included repositioning the entrance of the building from 32nd Street to 31st Street, with priority placed on the design of the lobby and shared communal spaces to achieve the architect’s vision.Working with our US distribution partners Lewis Stevenson, Planet’s export division manufactured and supplied multiple solutions from our LOFT range of glazed partitioning.LOFT20, LOFT54 and LOFT100 glazed partitions were utilised throughout the space at NoMad Tower, including one elevation 15 feet in height that required custom angle returns to be created. With acoustic performance a priority, the double-glazed LOFT100 (54dB RW) meant that the noise reduction between the bustling reception area and conference space was achieved to a very high standard.Planet IsoPro double-glazed pivoting doors and EclipseTec soft open & close sliding doors were fit alongside the LOFT systems to ensure continuity in noise reduction while providing superb user interface experience.
Sponsored
Cambridge Mosque

Cambridge Mosque

Roofglaze Rooflights Ltd

Award winning project in Cambridge. Only natural daylight used during the day. A mixture of Class 1 and Class 2 non-fragile rooflights.Very large single pane units.
Sponsored
JACKOBOARD® is the “ideal” companion for underfloor heating

JACKOBOARD® is the “ideal” companion for underfloor heating

BEWI UK Construction

The JACKOBOARD range from BEWI is “ideal” for use as a tile backerboard on projects where increasingly popular underfloor heating systems are being installed, the company says.Made from extruded polystyrene foam (XPS), the construction boards are said to be inherently waterproof because the structure of the board does not allow water to penetrate. They are designed to be easy to work with and cut, as well as truly lightweight.They are finished on both sides with a special coating and reinforced fibreglass mesh, ready to be tiled, rendered or plastered. The boards are said to possess excellent thermal insulation properties, which give them enormous advantages over plasterboard or cement board. They are especially suitable for interior construction, the company says, especially in rooms subject to high moisture levels.According to BEWI, JACKOBOARD goes “beyond bathrooms” and can be used in any room of the house and as a backerboard for virtually any tiling project.The boards are suitable for quickly and effectively levelling uneven walls and floors, for partition walls, compensating for cracks in substrates and for creating substrates for laying tiles on non-adhesive surfaces.JACKOBOARD is also said to provide the best waterproof, insulated, tiling substrate for underfloor heating projects. Whether electric mats or hot water systems are being installed, BEWI says, JACKOBOARD – laid underneath the heating elements or pipework – will help to decrease warm-up times of the system by pushing the heat directly up to the tile layer. In this way, the heat generated by the system is used in the most efficient way, not just during the initial heat-up stage, but in general usage with the continued thermostat-controlled use of the heating system.As builders are forced to reduce the carbon footprint of their projects, the materials they choose to build with can provide a key to unlocking the thermal performance of a building. The XPS foam used on JACKOBOARD products reportedly achieves excellent insulation properties. It’s designed to help maximise the energy efficiency of walls and floors, improving the overall thermal performance of any property.www.bewi.com
Sponsored
The Factory, Islington

The Factory, Islington

RYNO

The private roof terrace at former Edwardian-era printworks 'The Factory' is transformed with Ryno PaveRail™ Non-combustible Paving System taking centre stage, supporting large porcelain tiles.
Sponsored
Clement steel windows, doors and screens feature throughout this fabulous Vineyard

Clement steel windows, doors and screens feature throughout this fabulous Vineyard

Clement Windows Group

Sedlescombe is England's oldest organic wine estate. The new owners have totally transformed the Vineyard's shop and tasting room with a stunning combination of steel and glass being incorporated through the whole building design. The enormous pair of radius head door screens provide a magnificent feature both internally and externally. They are in keeping with the natural surroundings and a fabulous backdrop to the shop. Inside you will find further Clement EB24 door screens and doors used to beautifully partition rooms and allow light to flow through the building.
Sponsored
New Promat SYSTEMGLAS® options provide more EI fire rated frameless glazing solution

New Promat SYSTEMGLAS® options provide more EI fire rated frameless glazing solution

Promat UK

Striking the optimum balance between aesthetics and fire safety in glazed partitions is a reality with new additions to the SYSTEMGLAS® range from passive fire protection market leader Promat UK. Utilising the proven fire resistant material PROMATECT® H, two new Promat SYSTEMGLAS® options give designers and contractors the scope to create frameless, butt-jointed glazed screens that maximise light transmission, whilst offering fire integrity and insulation (EI) fire protection for 30 or 60 minutes.
Sponsored
Commercial | Capital One Head Office

Commercial | Capital One Head Office

Venesta Washroom Systems Ltd

Capital One recently turned their attention to breathing new life into their washrooms to give their staff the very best facilities throughout their office.Venesta Unity toilet cubicles were specified and complement the décor of the new washroom areas. Stylish, modern and easy to maintain the Unity toilet cubicles feature setback satin anodised aluminium pedestals fixed to the partitions for a contemporary floating appearance.The cubicles were specified in Solid Grade Laminate which is ideal for heavy use commercial washrooms.Read the full case study for more details.
Sponsored
Hilton Garden Inn, Doncaster

Hilton Garden Inn, Doncaster

Planet

The Hilton Garden Inn is a global brand facet of the Hilton Worldwide group, with over 780 locations across the world. In the hotel’s lobby area, LOFT20 single glazed partitioning was installed, reaching 3500mm high. The designs were made to allow for vertical and horizontal polyester powder coated aluminium trims, set at different heights, to compliment the style of the hotel. IsoTec doors were used, reaching 3000mm in height, and the doors included LOFT style aluminium trims, bonded to both sides of the doors, to provide a uniform style throughout.
Sponsored
Rockfon helps create peaceful spaces at Thames Hospice

Rockfon helps create peaceful spaces at Thames Hospice

Rockfon

The Maidenhead-based Thames Hospice service has proudly served its community for more than 30 years, offering world-class palliative and end-of-life care and support to people across East Berkshire and South Buckinghamshire.Thames Hospice, “We provide the highest quality nursing, medical and therapeutic care supporting the physical, social and emotional needs of our patients and their loved ones. Our services are free of charge to all who need us, thanks to the generosity of our amazing community and organisations, as well as our 700 incredible volunteers who give their time to support the best possible end-of-life care for local people.” KKE Architects were responsible for the project. They said, “Set in more than eight acres, with stunning views across landscaped gardens and Bray Lake, the new hospice has 28 inpatient beds in individual en-suite rooms. The new Day Centre (the Paul Bevan Centre) offers a wider range of daily therapeutic and social activities for day patients and inpatients and has allowed the hospice to double its day service provision.”Bespoke seamless acoustic islands created on siteIn one part of the building, KKE Architects designed a central double height rotunda from which 11 concrete ‘spokes’ splayed from the structure underneath a circular glass dome. Islands were the best option for acoustic control within these unusual spaces, which the installers – Aspect Ceilings and Partitions – were able to create on site with Rockfon® Mono® Acoustic system components. This approach eliminated any lead time in ordering bespoke, pre-manufactured islands.Rockfon Mono Acoustic is a system comprising grid, panel and acoustic render, which can be used to create ceilings, wall coverings and bespoke islands and rafts.Within the rotunda 1200 x 1200mm panels were initially cut to size and adhered directly to the concrete soffit. They were then taped, jointed, filled and rendered to create seamless, elegant islands which help create a calm atmosphere by providing Class A sound absorption.Aspect Ceilings and Partitions carried out the installation of Rockfon acoustic systems at the Hospice. Company Director Grant Stevens “This was a great project to be involved with. We know the Rockfon team are always available to offer advice. Given the bespoke nature of the design, the installation relied heavily on the creativity of the installation team. The process needed to be precise and the completed work looks great.”Optimum acoustics can improve sleep and reduce anxietyThanks to its core of naturally occurring, non-hygroscopic stone wool, it provides no sustenance to harmful micro-organisms, embodies high humidity resistance and is impervious to most environmental pressures. It is Bronze level Cradle to Cradle Certified® and can also contribute valuably to LEED, BREAM and WELL Building Standards. Rockfon Eclipse® are also used at the hospice, arranged groups of refined frameless panels suspended on wires directly from the soffit, giving the illusion they float in mid-air. Eclipse can be specified in a variety of shapes with custom colour matching and are perfect for thermal mass installations and where a traditional suspended ceiling cannot be installed. Director Phil Kavanagh of KKE architects, “Acoustics were a key consideration in our choice of both Rockfon ranges, where each fitted the brief and offered the best solution. In particular, Mono Acoustic suited the installation requirements within the rotunda where specifically shaped elements needed to fit within the radiused space and deliver a monolithic appearance.” The right solution when it matters mostIn common with other Rockfon acoustic systems, Mono and Eclipse are made with a core of naturally occurring inert volcanic rock stone wool, which is non-combustible and will not harbour harmful microorganisms and bacteria. In addition, their high light reflectance characteristics help reduce the need for artificial light, saving energy and further enhancing wellbeing. Rockfon Business Development Manager, Simon Slade, “The invaluable work done at this hospice made it an important project to be specified for. The whole purpose was to create a calm, quiet environment for those receiving care and for their families. I’m humbled that our products can make a difference to their experience at such a difficult time.”
Sponsored
UWE Engineering Building

UWE Engineering Building

Lusso Systems Ltd

The new Engineering Building for The University of the West of England (UWE) is located at the main Frenchay Campus. Designed by multi award-winning architects, AHR, the iconic building will enable the university to deliver its vision for 21st Century engineering and inspire engineers of the future. It has been designed and operated to BIM Level two and aims to achieve a BREEAM Excellent rating. The building will accommodate up to 1,600 students as well as 100 academic and technical staff. The design brief was to create a space which would encourage multi-disciplinary collaborative learning. The outcome is an ideal environment for students to explore, create, and test ideas to change the world for the better.A large central atrium provides a generous space across multiple stepping floor plates which leads to social learning spaces, manufacturing workshops, wind tunnels, laboratories, computer rooms, and computer-aided design (CAD) suites. At the heart of the building there is also a hub for group study which will encourage students and academics to meet and exchange ideas.Lusso atria glazing was installed within the space to allow natural light into the core of the building and visual connection between different areas .  A combination of Lusso 105 framed glazed partitioning and Lusso 25 frameless glazed partitioning has been used for different specification requirements within the space and combine well with the wood and black coated steel beams to achieve an industrial look. 
Sponsored
Baker Botts

Baker Botts

Radii

Radii designed, manufactured and installed solutions for 71 offices and meeting rooms across Baker Botts’ new 27,000 sq ft space.The standout contribution to this project was the installation of stunning curved glazed screens for the executive meeting rooms. Using a Parallel 50 double glazed system with angled façade abutments, the luxurious design was accompanied with acoustic blank 64mm veneered timber doors, achieving 40dB Rw, and flush bonded Align glazed pivoting doors.Baker Botts’ office fronts comprised of Linear 59 single glazed partitions with adjoining Radii Glide sliding doors and bespoke drywall endcaps. Concealed deflection heads helped to create a flush look with clean lines, while a special bronze finish — applied to the metalwork at Radii’s dedicated in-house powder coating line — complemented the colour palette throughout the space.For small-to-medium size meeting rooms Linear 30 and Linear 64 single glazing, both offering 41dB Rw, were used alongside Parallel 50  fins, Glide glazed sliding doors and Align pivoting doors. All meeting rooms for Baker Botts were installed with retro-fit room booking, facilitated with cable routes provided down the door legs.Finally, Linear 25 single glazed partitioning was placed alongside single glazed Hogan door sets with access controls in Baker Botts’ lift lobby.
Sponsored
Opus Energy

Opus Energy

Excelsior Panelling Systems Ltd

The ProjectFollowing Opus Energy’s momentous growth over its 15-year history, their move to the John Dryden House will consolidate their four current sites and house all employees working in Northampton under one roof.With the new premises, Opus Energy expects to have an almost 800 strong Northampton workforce, highlighting its prominence as a key local employer. The refurbishment of the property has seen state of the art facilities, and with investment into sustainability opportunities, will enable the business to be carbon neutral.The ChallengeWork within tight lead times to supply deliver and install the project.Offer a cost-effective system suitable for the environment intended.Propose a selection of classic High Pressure Laminae finishes that will deliver a timeless décor.  The SolutionExcelsior Select Range of Cubicle’s in 20mm High Pressure Laminate fell within budget and met with the Architects Specification. A combination of Polyrey finishes created the classical, timeless façade desired by the client. SpecificationProduct Range: SelectDoors: 18mm MR Core HPL Polyrey B101 Banian NoirciPilaster: Polyrey B101 Banian NoirciPartition: Partition: Polyrey B015 Blanc MenuiresIronmongery: Excelsior SBAASpecificationProduct Range: SelectVanity Top: 12mm Laminated CDF Polyrey B101 Banian NoirciVanity Panels: HPL 18mm MR Polyrey B015 Blanc MenuiresFrame: Polyrey B015 Blanc Menuires
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
Intensive Care Unit, Harrogate District Hospital

Intensive Care Unit, Harrogate District Hospital

Altro

Calm and non-clinical environment for busy ICUChallengeHospital environments are created to heal; yet supporting both physical and mental health needs in clinical environments can be challenging. The Intensive Care Unit (ICU) at Harrogate District Hospital required a refurbishment to its walls and wanted a non-clinical design, but with hygienic properties. Approach The unit had different areas with different functions – it needed to have hygienic, clean, wipe down walls which were also robust and could withstand bumps and scuffs. In the midst of the COVID-19 pandemic, the refurbishment needed to be completed quickly with minimum downtime to ICU. The team also wanted the unit to have a non-clinical feel. Solution Altro Whiterock White, Altro Whiterock Chameleon, and Altro Whiterock Digiclad (Custom) were selected for the walls in the ICU. The hospital’s paediatric unit had Altro hygienic wall sheets installed previously and knew they were robust and trusted products. The ICU staff and project design team took time to select artwork of cherry blossom branches that would be cheerful yet calming for patients, as well as inspiring and uplifting for hardworking staff. The images were printed to create the Altro Whiterock Digiclad (Custom) wall sheets.
Sponsored
Aluminium decking fire-safe replacement for flammable composite balcony decking

Aluminium decking fire-safe replacement for flammable composite balcony decking

AliDeck

Recent installation to a low-rise block of flats in High Wycombe. With flammable composite decking on the balconies, the building owner was keen to find a non-combustible alternative and our aluminium decking system was just the ticket!
Sponsored
Rockpanel external facades help transform Listed Compton Care hub

Rockpanel external facades help transform Listed Compton Care hub

Rockpanel

Rockpanel non-combustible external facades dresses the contemporary redevelopment and extension of an existing Grade II Listed building, harmonizing old with new, bringing a crisp style and warmth to this important regional health and care hub.
Sponsored
Chobham Manor

Chobham Manor

Keyfix

IntroductionThe Keyfix Non-Combustible Cavity Tray System has played an important role in futureproofing a major new residential development in Stratford’s Olympic Park by exceeding new building regulations whilst improving build quality and installation efficiency on site.OverviewLocated in the very heart of the Queen Elizabeth Olympic Park, Chobham Manor in East London is the first of five new neighbourhoods in the former home of the 2012 Olympics. Comprising 850 new one, two and three-bed homes alongside community facilities, shops, public green spaces and community areas, this stunning new development has sustainability at its core with all homes built to the Code for Sustainable Homes Level 4.In a design by JSA Architects and built by Taylor Wimpey, the layered brickwork façade features projected bay windows, balconies and set back terraces. To meet the requirements and a tight build programme, Keyfix worked with subcontractor Chine Brickwork and supplied 4545 metres of Keyfix Non-Combustible Cavity Trays (NCCT) along with Corner Units and Weeps on blocks A, B and C which form Phase Four of the development.ChallengeThe challenges for Keyfix were the unique brickwork build programme which incorporated two runs of cavity trays being supplied per floor to accommodate brickwork corbelling and recessed brickwork.SolutionAs the corbels where built at a different stage on the build programme so the Keyfix Non-combustible Cavity Trays had to project out either side of the pier when initially being installed. Therefore, when the infill corbels where being built the continuous run of tray could link in seamlessly. A task that would have been near impossible had the system relied on tapes or mastics to make the linking joint.The Keyfix stainless steel NCCT was specified due to its self-supporting system which doesn’t need fixing back to the internal concrete frame and clips together for fast and easy installation. It is essentially a ‘Fix & Forget’ solution with no additional fixings, sealants or onsite fabrication required by the brickwork contractor. Therefore, installation of the trays did not impede the speed of bricklaying even when compared to traditional DPC. Installed in the outer leaf with no connection with the inner skin, this innovative cavity tray system does not create a thermal bridge and eliminates all differential movement issues.With a lifespan of 125+ years it is the only non-combustible cavity tray system that does not rely on tapes and mastics to make watertight joints, therefore elimating one of the main reasons for product failure.Commenting Kieran Coyle of Keyfix said: “Holding an A1 Fire Rating, the Keyfix non-combustible cavity tray solution exceeds the minimum standards set out in ADB (Approved Document B), whilst ensuring this new development meets and exceeds the latest regulations. If the regulations become stricter, it will also be futureproofed maximising the whole-life value of the development.”The award-winning Chobham Manor Phase Four is now complete, with the Keyfix Non-combustible Cavity Tray playing an integral part in the creation of a safe and resilient development that will transform the Olympic Park into a lasting legacy for East London.For more information about the Keyfix range of non-combustible solutions download the product guide, visit https://keyfix.com/or for technical support call 028 8676 7508 or email info@keyfix.com
Sponsored
Klasse C-board | Green Court, Dartford

Klasse C-board | Green Court, Dartford

Klasse Group Ltd

This new residential block in Dartford will have 5 stories, 14 apartments and 6 parking spaces. Klasse C-board has been utilised on this project due to it's A1 fire-rated, fully non-combustible classification.
Sponsored
Intensive Care Unit, Harrogate District Hospital, UK

Intensive Care Unit, Harrogate District Hospital, UK

Altro

Calm and non-clinical environment for busy Intensive Care UnitChallengeHospital environments are created to heal; yet supporting both physical and mental health needs in clinical environments can be challenging. The Intensive Care Unit (ICU) at Harrogate District Hospital required a refurbishment to its walls and wanted a non-clinical design, but with hygienic properties.ApproachThe unit had different areas with different functions – it needed to have hygienic, clean, wipe down walls which were also robust and could withstand bumps and scuffs. In the midst of the COVID-19 pandemic, the refurbishment needed to be completed quickly with minimum downtime to ICU. The team also wanted the unit to have a non-clinical feel.SolutionAltro Whiterock White, Altro Whiterock Chameleon, and Altro Whiterock Digiclad (Custom) were selected for the walls in the ICU. The hospital’s paediatric unit had Altro hygienic wall sheets installed previously and knew they were robust and trusted products. The ICU staff and project design team took time to select artwork of cherry blossom branches that would be cheerful yet calming for patients, as well as inspiring and uplifting for hardworking staff. The images were printed to create the Altro Whiterock Digiclad (Custom) wall sheets.
Sponsored
Ysgol Gyfun Ystalyfera

Ysgol Gyfun Ystalyfera

Bushboard Washroom Systems Ltd

£12 million has been invested into Ysgol Gyfun Ystalyfera secondary school in Neath Port Talbot. A three storey teaching block has been built, providing state of the art classrooms and school toilet cubicles for 11-19 year old pupils.Privacy was a big factor when specifying the school toilet cubicles. Bushboard’s HiZone toilet cubicles were chosen. HiZone is a full height toilet cubicle with partitions sitting in durable aluminium skirting at floor level.Read the whole case study on our website.
Sponsored
Ealing Picturehouse Cinema, London

Ealing Picturehouse Cinema, London

Farrat Isolevel Ltd

The Farrat CineRANGE provided optimal acoustic isolation for the Ealing Picturehouse, a newly built 8-screen cinema with a café, bar, and kiosk in one of London’s most iconic film locations, a local landmark with a rich history.Farrat designed and supplied several products including; CineWALL PRO partition base track isolation, CineTIMBER LITE isolation strips, for lightweight stadia seating isolation, and CineFLOOR LITE acoustic floating floors specifically engineered for auditoriums which were also fully installed, and quality assured by our expert site team.

Showing 289-324 of 760

Feedback