NBS Source
I'm a manufacturer

"green roof"

1,860 results found

Sort by:

Showing 253-288 of 321

Sponsored
Bourne Business Park

Bourne Business Park

The Bike Storage Company

We were presented with the unique challenge of designing and constructing a bespoke cycle shelter at Bourne Business Park in Weybridge. The client wanted to maximise space efficiency without compromising durability and aesthetic appeal. Project Details: Our team collaborated closely with the client to conceptualise and bring to life the Semi-Vertical Amazon Eco Cycle Shelter, a pioneering cycle storage solution tailored to their specific requirements. Shelter Features: Hot Dipped Galvanised frame for robustness and longevity FSC-Certified clear sealed and planned softwood battens for an eco-friendly finish Strengthened sheet metal roof with galvanised finish Accommodation for 28 bikes with galvanised Semi Vertical Cycle Racks and provision for 2 cargo bikesInstallation of 2 Single Lesh mesh swing gates with access controlEnhanced with Sedum Roof for added environmental benefitsMade in Britain, ensuring quality craftsmanship and local support BREEAM compliant, meeting stringent sustainable standards Innovative, eco-conscious sedum roofing added a touch of green luxury to the bespoke storage shelter. By integrating a living roof, we enhanced aesthetic appeal and contributed to environmental sustainability. Sedum roofing offers numerous benefits, including stormwater absorption, carbon sequestration, and habitat creation for urban wildlife. As part of our commitment to green architecture, we offer sedum roofing options to complement our bespoke storage solutions, ensuring that every project employs the perfect blend of functionality and eco-friendliness. Challenges & Solutions: Space Optimisation: By storing cycles semi-vertically at 45 degrees, the shelter's footprint was dramatically reduced, offering flexibility in placement within projects. Environmental Considerations: Incorporating FSC-certified timber and Sedum Roofing demonstrated the client's commitment to sustainability and environmental stewardship.Durability & Longevity: The hot-dipped galvanised frame and premium timber cladding ensured the shelter's resistance to harsh weather conditions, guaranteeing years of reliable performance.Compliance & Accreditation: BREEAM compliance and adherence to quality standards reinforced our reputation for excellence and sustainability leadership. The successful implementation of the Bespoke Semi Vertical Amazon Eco Cycle Shelter underscores our commitment to innovation, sustainability, and client satisfaction. We have met and surpassed our client's expectations by addressing unique challenges with creative solutions and creating a new standard for cycle storage projects.
Sponsored
Reading Green Park

Reading Green Park

INTRAsystems

Tailored Railway Entrance Matting SolutionsINTRAsystems is proud to be an approved supplier for Great Western Railways (GWR). Our products exceed the demanding performance standards, so we were the natural choice when they needed railway entrance matting for the new station at Green Park in Reading.Located on the Reading to Basingstoke line, Green Park connects the pioneering business park with residential areas and Reading Football Club’s Select Car Leasing Stadium.The new, state-of-the-art station is designed to withstand heavy foot and wheeled traffic from daily commuters for the 60 businesses within Green Park as well as the regular stream of football fans!Enhancing accessibilityFollowing the latest directive from the Department of Transport, Network Rail and their own accessibility goals, GWR has incorporated distinctive route markers into the flooring. Textured areas and high-contrast colours flow around the station concourse, signposting key routes, obstacles or points of interest to help visually impaired and disabled passengers navigate more easily.GWR had wanted to the carry the design through to the Entrance Matting too, adding a stripe of contrasting colour to link the entrance area with the onward concourse. This meets and exceeds the latest ‘Technical Specifications for Interoperability, Route Identification for Persons of Reduced Mobility’, (TSI for PRM.)Optimal performance and effortless maintenanceWe successfully completed a similar project at Perry Barr Station, so were confident in meeting the challenge, and produced design recommendations to match in with other textural and visual flooring features for the TSI for PRM.Having reviewed the design and budget requirements with GWR, our spec team recommended INTRAform, a recessed aluminium system with Linear fibre combined with a ribbed rubber insert.Set into ‘closed construction’ channels, the system is effective for scraping off dirt and keeps dirt on the surface of the mat making cleaning and maintenance easy.Enhancing Aesthetic Appeal and FunctionalityThe ridged appearance of INTRAlux Linear fibres in Anthracite and alternating rubber sections met the client’s brand guidelines, DDA compliance requirements as well as the wayfinding needs of the TSI for PRM. And the neat design finish ties in well with the flooring texture beyondLinear fibres are hard-wearing with a 1400g/m² looped pile and a textured appearance.The Art and Science of Railway Entrance Matting DesignINTRAform, like the majority of INTRA’s easy to install products, features interlocking plank sections which can be cut and configured to create patterns, stripes, or other striking designs. The robust aluminium profile is ideal for heavy-duty applications too and comes with a 10-year warranty.The planks are easy to cut and install, provide flush transitions between outdoor and indoor flooring substrates to meet DDA regulations.Ensuring safety and efficient maintenance is of paramount importance on the railways so getting the right materials specification for each situation is vital. Facilities teams need a product that performs at a high level and adheres to all the various restrictions and regulations.Precision in Every DetailGWR chose a specification with outstanding performance and design flexibility, but they also earned LEED and BREEAM points for sustainability.INTRAform is EPD-verified and uses 100% recycled aluminium frames which can be recycled or reused again and again. We collaborated closely with the design team and provided detailed drawings and measurements for the Entrance Matting to ensure the success of the project.Even with such detailed specifications and drawings however, we understand the allowance for anomalies on site. INTRA supplied the planks 50mm oversized for on-site trimming. The installers could get a snug fit and adjust the planks incrementally to align accurately with the other textural and contrasting features in the flooring scheme.Elevating EntrancesThe Railway Entrance Matting now continues the signposting sections, linking up with the station flooring designs perfectly.Reactions and feedback from staff and passengers using the new station have been excellent.The Entrance Matting is already delivering on the objectives of keeping people safe, protecting the flooring beyond and providing key visual cues. And with INTRAform’s 10-year warranty and proven track record, it will stand the test of time.
Sponsored
The Restoration of Westminster Fire Station

The Restoration of Westminster Fire Station

Lime Green Products Ltd

The Westminster Fire Station restoration and regeneration was all about creating an experience for those that live there, with sustainable and natural materials,” says Jennifer Benningfield, experienced architect and founding principal of Openstudio Architects.v “We needed to find a reliable supplier of sustainable and natural materials, which were suitable to tie in with the heritage structure. “The challenge was sourcing the right materials that were compatible with the fabric of the existing buildings. Working with Lime Green, we managed to develop a solution that matched the original building’s beautiful aesthetic and historic character. “As a key supplier of lime-based products, their flexibility and reliability helped to make our job easier – and we received a lot of praise for the high-quality and beautiful new courtyard building. The lime mortar is an integral part of the brickwork and proves that it is appropriate for contemporary, as well as historical, structures,” praises Jennifer. About the project Using a team of specialists, Openstudio Architects supported the site team in using old and traditional construction techniques to refurbish and develop buildings in a contemporary way, with beautiful results. “There were two phases to the Westminster Fire Station project,” explains Jennifer. “The first involved refurbishing the existing building, the Grade II Listed Edwardian Fire Station built in 1906 and decommissioned in 2014, to create a restaurant and bespoke housing. “The second involved developing the site further by adding a new residential building to the rear of the site surrounding a garden courtyard, which is where we used Lime Green’s mortar.” Supporting the local community “The project was situated on a very constrained and challenging site,” continues Jennifer. “With its central location, the construction works undoubtedly had an impact on those living and working in the local area, which is why we wanted to ensure the community were completely happy with the project. “As we wanted to make sure the new build tied in with the older fire station, there were inevitably challenges that we didn’t anticipate along the way. However, most importantly, we needed to ensure we sourced the right materials, which were compatible with the existing building, both in terms of performance and appearance. Selecting the right materials “We wanted to work with natural materials, which would age well and ensure robust construction that has longevity and sustainability,” says Jennifer. “We chose specific products, including handmade Danish bricks and handmade glazed bricks to give depth and texture to the new building. We wanted to ensure use mortar that had a texture and a grain to it, so it would work with the nuances of the bricks, as well as being a colour match. “Finding the right colour mortar to match the pale Danish bricks was key. These bricks were handmade, so we needed the mortar that integrated with the historic Edwardian building to create a seamless whole. “When planning the project, we recognised the importance of lime products, because of the material’s sturdiness and robustness. This means it doesn’t wear with structural movements and changes in the seasons. “That’s why Lime Green was the perfect fit for the project. With an extensive colour range, the team was able to colour-match the mortar with the materials of the new building perfectly. The consistency between the samples Lime Green gave us and the final product delivered was incredible, which was important given the scrutiny by Westminster City Council over the project and the appearance of the new building. “The flexibility of the products also helped us to minimise the amount of movement joints, as it accommodated movement in a much more forgiving way than other products, such as modern cement mortars. “We really enjoyed working with the Lime Green team – they were easy to work with, responsive and very supportive of the project. As we couldn’t store a huge amount of supplies on site, Lime Green was very accommodating in delivering exactly what we needed, at the right time. “The best part was that we were able to develop a solution with Lime Green that supported the original building’s beautiful aesthetic and historic character, with a new building that pays similar attention to detail.” A sustainable, natural and beautiful finish “People love the building, and neighbours even call it ‘the golden citadel’. It’s widely recognised in the local community for its high-quality, beautiful finish,” continues Jennifer. “One of the Fire Station’s previous residents – who had moved out during construction – has moved back after the restoration works and loves the development. That was the icing on the cake for us, it really felt as though our vision had materialised – enhancing people’s experience of new buildings made with sustainable and natural materials that stand the test of time. “The Westminster Fire Station development truly looks beautiful, and the quality of the natural and sustainable products used has a huge role to play in that. Lime Green’s product quality and customer service is outstanding. We’re already working with Lime Green on another project, and we can’t wait to see the finished result,” concludes Jennifer. “It was a pleasure to see our Hydraulic Lime Mortar used on this new development project. We’ve loved working with Openstudio Architects on Westminster Fire Station, and we’re glad to be working with them on their next project,” comments Simon Ayres, co-founder and managing director, Lime Green Products. For more information about the Westminster Fire Station project and the products used, visit Lime Green or call 01952 728 611.
Sponsored
Green Quarter

Green Quarter

The Safety Letterbox Company

THE PROJECTThe Green Quarter project features a single large bank of H1 type mailboxes that are recessed into the wall maximising the amount of space available in the location. Each row of mailboxes is divided by an oak wood insert, adding visual interest to the bank of mailboxes.PROJECT DETAILSProject Type: Private ResidentialProduct: H1 MailboxInstallation: Wall RecessedAccessories: Numerical engraving. Oak wood inserts. Surround.
Sponsored
Parade Green, Cowley

Parade Green, Cowley

Langley Design

THE BRIEFOutdoor storage and seatingParade Green is a brand new student accommodation development in Oxford and offers over 800 rooms. The design was inspired by Oxford’s historic college quads, with plenty of open space to give it a village feel.Langley Design were approached by the RG Group as there was a requirement for cycle parking facilities for the large number of occupants. As the UK leading manufacturer of timber cycle shelters, we were chosen to manufacture and install our Sheldon units in various locations across the site.WHAT WE DIDOptimising the spaceIn order to optimise the use of space, our two tier cycle racks were seen to be the most suitable option to accommodate the large number of bikes. The project also required canopies to be installed in the courtyard to provide covered seating areas for the students to enjoy the outdoor space in any weather.THE RESULTAdditional wind protectionAs a bespoke manufacturer, we were able to produce a canopy with timber cladding to the sides of the units which offered additional protection from the wind whilst still allowing airflow and light through the unit.The end result looks fantastic and the RG Group were delighted with the flexibility of the Langley Design installation service and our ability to meet the tight deadlines.
Sponsored
West End Gate, London

West End Gate, London

Axter Ltd

Systems in UseWilotekt®-PlusForce®Force Dalle®Aquamodul®OverviewBerkeley Homes initially contacted Axter in early 2017 about their project to create 844 apartments (including 175 affordable units), plus 8 shops, a restaurant, and a public plaza. The development, located in Edgware Road, will bring prosperity and jobs as well as housing, to a part of London in need of regeneration.The development involves 11 apartment blocks and is divided into 4 phases. Axter were involved in design prior to works starting, and were subsequently awarded the contract for Phase 1, later expanded to include Phase 2 and the current Phase 3.This is an update to a project we initially wrote about in its first phase. As noted there, Phase 1 was complicated by the fact that the Government amended the Building Regulations in 2018, after design work was completed and approved, imposing stricter requirements in relation to combustible materials in high-rise buildings. Timing meant that the developer was permitted to proceed under the old regime, but elected to apply stricter safety standards including a voluntary change to the system used on the balconies that was both tested to BRoof(t4) and included non-combustible insulation. The Axter team had to work quickly to amend designs but were able to modify the approved solution so that work could continue as scheduled.Phil Saunders, Regional Sales Director at Axter, has been our lead throughout the work. “This is one of the most challenging projects I have worked on,” he notes, “but also one of the most rewarding. Unique solutions were required to solve more than one problem, but it has been great to work on a development involving many technically elegant and aesthetically pleasing aspects, with a range of roofing systems and finishes, including Blue, Brown and Green Roof elements.”Additional challengesWestminster Council’s planning requirements included specific stormwater attenuation targets. With limited space onsite, Kevin Leahy, Technical Director at Berkeley Homes, was considering a Blue Roof solution, something the developer had not implemented before, so support from a technical manufacturer was especially important from the outset.Numerous other difficulties have had to be overcome during this project. Work was disrupted by Covid lockdowns not long after roofing commenced in 2019. Phases 2 and 3, which were very similar, also required us to support our partner through complex change: Phase 1 involved an inverted roof, a solution assumed to carry forward. However, assessment of weight restrictions and outlet positions meant that design would need to switch to a warm roof with tapered insulation.Additionally, work has continued throughout the period of the Ukraine conflict, where prices and supply of materials have been difficult to navigate.SolutionsTo achieve planning permission, Axter worked with Kevin and Berkeley Homes between 2017 and 2019, presenting the resultant roofing design for approval. We were able to demonstrate that the plans met sustainable drainage obligations. The London Plan for sustainable design and construction also imposed requirements, which were met by a mix of living roof solutions including Green Roof and Brown Roof finishes.“We’re happy to present Westminster Council to support the planning application,” continues Phil. “We have worked with Berkeley Homes many times and continue to do so on several projects. Nothing matters more to us than building and maintaining ongoing relationships with partners who know they can trust us to take weight from their shoulders.”Construction continued throughout the lockdown period, with Axter working hard to ensure uninterrupted supply. Materials continued to be delivered in a safe manner, and QA reviews were held virtually until we could resume our usual regular site visits.A switch in roofing approach generally changes the sequencing of work such as integration of roofing and door thresholds. “We were able to come up with an innovative solution involving multiple systems, including cold-applied liquid waterproofing, that permitted the original sequencing to remain,” says Phil. Change was also required in relation to upstand penetration details and movement joints.Throughout the project, Axter has been able to provide partners with full designs involving bespoke details, plus rainwater and u-value calculations, to ensure compliance at every stage.“We worked hard to find the smartest, most cost-effective solutions,” adds Phil. “We also appreciated that this was not the time to be too rigid in pricing. Some pain all round might be unavoidable in this difficult period, but we aimed to share the impact. We were also able to offer partners a guarantee of price stability for a set period of time, so they could proceed with certainty.”Axter manufactures its own systems and works carefully to plan ahead and liaise with long-standing supply partners. This allows us to stay ahead of shortages and offer accurate delivery timelines. Company-wide, we have been able to supply all systems as pledged.All of Axter’s approved installers must complete training specific to the systems involved, but in this case so many bespoke design elements were involved that we organised training specific to the project for all operatives. This training was also extended to the Berkeley Homes construction team, to ensure they were supported in how the roofing would integrate with other areas of construction.“This has been an exceptionally successful project”, comments Phil. “Hurdles have arisen, but with communication and hard work we have supported our client through rapid transitions and financial challenges. We have been very flexible on pricing, but we were not necessarily the cheapest initial bid. We were chosen anyway, because I think Berkeley Homes understands we add value that makes us the cost-effective option for the building’s future lifetime.”Phase 3 designs were approved early this year, with work just starting. Axter is now busy with design for Phase 4, with the project expected to continue through to 2025.
Sponsored
Luxury access to the roof terrace by LAMILUX roof access hatch

Luxury access to the roof terrace by LAMILUX roof access hatch

Lamilux Rooflights Ltd

In densely populated urban areas of the cities, where the number of floors in housing is sometimes limited and private gardens are rare, a rooftop terrace or patio is becoming a popular design choice. However, many residential buildings with rooftop gardens don’t see much daylight and careful consideration is required to determine an access point to the roof terrace. For such rooftop projects, a new dimension of roof access is offered by the LAMILUX Flat Roof Access Hatch Comfort range, designed to give a generous daylight intake in attic apartments alongside convenient access to the roof terrace creating an air of grace and beauty both internally and externally. The LAMILUX Flat Roof Access Hatch Comfort range now introduces its fourth product into the family, giving more choice and flexibility when creating a luxurious living space with an exclusive ambience. Featuring unrestricted use as a natural ventilation device and convenient access to the roof terrace, the indoor climate also benefits from the high energy efficiency of the range thanks to the thermally broken frame and excellent air tightness values.The existing Solo and Duo Flat Roof Access Hatch products from LAMILUX open laterally by moving one or two panels horizontally to create direct access to step onto the roof terrace, whilst the space-saving hinged opening Swing variant swiftly opens its one meter by 3000 or 3500 mm long aperture to 84 degrees in just 25 seconds. The fourth, and newest addition to the Access Hatch Comfort repertoire the Square, makes it possible, for the first time, to also use spiral and platform staircases underneath. Until now, access to the roof was limited to straight stairways due to the elongated rectangular shape of the roof access hatch range. The Square only takes 45 seconds for the concealed hydraulic drives to silently open the 4m² glass element of the skylight by 70 degrees. As with the Swing, the new variant does not require any additional space on the roof terrace than its own size in closed form, even when open, thanks to its swing mechanism.   Visually, the aluminium border frame throughout the product family, attracts attention as an architectural highlight. The aluminum profiles and the reveal surface can be coated in all RAL colours offering further choice and exclusivity. Since the glass panes and frame feature a flush edge detail both internally and externally, and all variants are designed with an inclined surface, the range boasts not only a visually appealing seamless design, but also ensures that rainwater can run-off easily without leaving any dirty edges or water ponding. Safety is standard in the Flat Roof Access Hatch Comfort product family with fall-resistant glazing which can be walked on to a limited extent for cleaning purposes. As an additional safety feature, a light barrier is installed as standard which prevents the closing of the access hatch as soon as it detects something in the entrance area. In terms of energy, the new roof access hatch continues the tradition of all LAMILUX skylights: The overall system, which is free of thermal bridges and isothermally balanced and the option of special glazing meets modern demands for sustainability, energy efficiency and climate protection which ultimately save heating costs and minimizes condensation. All four products in this family have one further thing in common: They are delivered completely pre-assembled to the construction site, lifted onto the roof by a crane provided by the customer and then installed swiftly and easily. This minimizes the risk of errors and saves valuable time – both for the contractor and for the apartment user who ultimately gains access to the roof terrace. 
Sponsored
One Hyde Park, London - JAKOB Rope and Rod Green Wall Project

One Hyde Park, London - JAKOB Rope and Rod Green Wall Project

MMA Architectural Systems Ltd

Delivered an elegant Green (Living) Wall at the iconic One Hyde Park building using a a combination of Jakob’s high-quality stainless-steel ropes, rods and planters.Our green wall has been installed to the eastern edge of the One Hyde Park building; where it lines the route of a new pedestrian walkway (Serpentine Walk), just a few steps away from Harrods. The wall creates a stunning green corridor between Hyde Park and the nearby Harrods store and 80 luxury apartments.The Jakob Green Wall system was chosen due to its aesthetic appeal suiting the architectural design of the building and the 21st century trend of city greening.The green wall provides both a visual and physical link between the expansive open spaces of Hyde Park and the busy street scene along Knightsbridge. The greening is also a taster of the views from the opulent penthouse suites above.Alongside the LED lighting, the green wall makes the building unique and distinctive. Ensuring that it looks great, both day and night.
Sponsored
ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG

Moreland Primary School is a purpose built school, nursery and Children's Centre requiring a multipurpose usable outdoor space. Due to lack of space, the ground attenuation tanks planned would reduce site storage and limit access to other trades, therefore delaying the project, The challenge was to develop a storage/discharge system which wouldn't impact the project and be sensitive to the local biodiversity action plan. ABG designed a versatile Blue Roof System removing the need for attenuation tanks and allowing the roof finishes required. ABG bio-diverse roof system helped maximise the BREEAM credits laid out in the action plan
Sponsored
Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s Slate 2000 product in a housing association project. The project, carried out by Saltash Construction, encompassed a total area of 290 square meters and aimed to improve the infrastructure of the existing leaking roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. The housing association sector plays a vital role in providing affordable and secure housing to individuals and families. To support their mission, housing associations often undertake infrastructure improvement projects to enhance the living conditions of their residents. This case study focuses on a project to revamp a housing association's infrastructure using the lightweight metal roofing panel, Slate 2000.The Slate 2000 is a durable and aesthetically pleasing lightweight roofing material with long-term performance and weather resistance. Its stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of residential buildings. The project involved upgrading the roofing system of a housing association's properties spanning a total area of 290 square meters. Saltash Construction, a reputable main contractor, was tasked with implementing the project. Benefits and Challenges Slate 2000's robust composition ensured long-lasting performance, reducing the need for frequent maintenance and repairs. The product's Titanium Grey colour provided a modern and visually appealing finish to the housing association's properties, significantly improving their appeal for residents and building owners. The roofing material demonstrated excellent resistance to harsh weather conditions, including heavy rain, strong winds, and extreme temperatures, thus ensuring the longevity of the roofs. The installation of the Slate 2000 required skilled labour and meticulous attention to detail due to its specific design and interlocking mechanism whilst coordinating the installation across multiple housing association properties within a specified timeframeProject Outcomes The application of Slate 2000 transformed the appearance of the housing association's existing roof, making it more visually appealing and modern. The durable properties of the Slate 2000 lightweight roofing panels significantly increased the lifespan of the roof, reducing the need for frequent maintenance and repair costs. This also improved the long-term value of the housing association, offering improved durability, weather resistance, and a refreshed aesthetic, which contributed to the overall satisfaction of the residents. Conclusion The utilization of Slate 2000 in the housing association project executed by Saltash Construction proved to be a successful choice. The product's aesthetic appeal, durability, and weather-resistance qualities enhanced the project's overall value, ultimately benefiting the housing association and its residents. This case study demonstrates the positive impact of choosing high-quality construction materials and the importance of skilled execution in infrastructure improvement projects.
Sponsored
Roof Access Hatches - Singapore

Roof Access Hatches - Singapore

Surespan

ProjectSurespan designed and manufactured a series of roof access hatch for the New Data Centre in Singapore.The data centre was budgeted at $30 million SGD and covers an area of 269,000 sq ft. The roof hatches were used as key access locations for maintenance and repair of the 8 cooling towers installed at roof level supplying up to 1000 watts of cooling per sq m.ProductsThe series of roof hatches featured a 900 x 900 opening and in the interest of security, the hatches were supplied with an internal cablock which can only be opened from the inside and safety hold open stay to prevent accidental closure.
Sponsored
Birmingham Asbestos Roof Coating

Birmingham Asbestos Roof Coating

Liquasil Ltd

This asbestos cement roof in Birmingham was soiled and in need of remediation.Nadco Roofing Services ensured that the roof was cleaned with all waste water being filtered to 2 microns prior to the application of Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating system.The full system involved priming the metal fixings with our SWT Primer, before sealing the fixings and any cracks in the roof using our Non-Sag Sealer.Once dry, the roof can then be seamlessly coated using Asbestoseal which comes with a 20-year product guarantee and leaves an old asbestos cement roof looking revitalised and brand new.
Sponsored
St George Wharf - Connecting Glass Facades

St George Wharf - Connecting Glass Facades

J & P Building Systems

St George Wharf consists of 750 apartments and offices, cafés, restaurants, a health and fitness centre as well as an international hotel. The project centres around 5 towers ascending in steps up to the 22nd storey. The top levels, directly under the striking wing-roofs, consist of penthouse suites with sea-green glass facades. Due to the fantastic location of St. George Wharf a complex has been created, which offers a high level of exclusivity, convenience and comfort. JORDAHL® supplied anchor channels JTA for connecting the elements of the glass façade.
Sponsored
St. Mary's Catholic Voluntary Primary School - Education

St. Mary's Catholic Voluntary Primary School - Education

Innovare Offsite Limited

Project:St Mary's Catholic Voluntary Academy Client: Department for Education Contractor: Tilbury Douglas Architect:Hawkins Brown Architects Value:£12m Location: Derby, Derbyshire. Completion Date: June 2023 Innovare duration onsite 12 Weeks 2GIFA: 2300 m² Framework: This is a DfE pathfinder project – the UKs first Biophilic school. Sustainability: Net Zero Carbon in operation Innovaré System:Psi-FASTConstruction is complete on the innovative eco-building for St Mary’s Catholic Voluntary Academy in Derby, following a fire that destroyed the previous school. This biophilic school is part of a pilot scheme for the Department for Education. Biophilic design increases occupant connectivity to nature, promoting physical and mental health, and the building is net zero carbon in operation. Innovaré Offsite supported the design, engineering, manufacture, and installation of the sustainable superstructure. The timber constructed school uses Innovaré’s Psi-FAST panels, designed for fire safety, thermal, and acoustic insulation, and loadbearing capabilities. Psi-FAST panels have an A1-rated non-combustible board and class 0 surface spread of flame rating, offering 60 minutes of standalone fire resistance. The single-storey school includes a primary school and nursery with pavilions arranged along a central canopy. Each age group has a shared learning space, and the entrance building features a hall and communal areas. The buildings are naturally ventilated with solar panels and heated via air source heat pumps. Green roofs enhance biodiversity and local ecology
Sponsored
New Street Square Urban Greening Living Wall, Holborn

New Street Square Urban Greening Living Wall, Holborn

Biotecture Limited

This living wall is one of five different living walls that we have now installed and still maintain for Land Securities. It is on the management suite building at the heart of New Street Square and, especially during the winter months, it is the only bit of urban greening in the area.
Sponsored
Asbestos roof cleaning & coating using Liquasil's BBA Approved roof coating, Asbestoseal

Asbestos roof cleaning & coating using Liquasil's BBA Approved roof coating, Asbestoseal

Liquasil Ltd

This asbestos cement roof was heavily contaminated with moss and lichen, following many years of neglect. Liquasil's asbestos roof coating, Asbestoseal was specified because it is the only such coating with BBA Approval for asbestos roofs. Also, the completed project came with a 10 year Latent Defects Insurance Guarantee. The roof now repels water instead of absorbing it and nothing can grow on top of the coating system, meaning it will stay moss-free forever. Call 0121 709 5352
Sponsored
Raj Green Sandstone Paving and Pool Copings with a contrast Brazilian Black Slate Roman End

Raj Green Sandstone Paving and Pool Copings with a contrast Brazilian Black Slate Roman End

Stoneworld Oxfordshire Ltd

Stoneworld have supplied Brazilian Slate and Raj Green Sandstone paving and pool copings
Sponsored
Cupa pizarras’ slate chosen for luxury coastal properties

Cupa pizarras’ slate chosen for luxury coastal properties

Cupa Pizarras

CUPA PIZARRAS’ CUPA 18 natural slate has been used to achieve a high-quality finish on three luxury, modern, new build properties in one of the most desirable areas of Whitstable in Kent. The new properties, built by local property designer and developer specialist Kapra Developments, are located in Island Wall, Whitstable, close to both the town centre and the scenic Kent coastline. The three storey, five bedroom luxury properties are each in excess of 360 square metres and benefit from views over the nearby golf course.  The unique design of the houses features extensive use of dark grey aluminium glazing systems including rooftop lanterns and large sloping roof windows. The placement of the expansive glazing as well as the layout and orientation of the buildings was devised to maximize the natural light and make the most of the surrounding landscape. In addition to the CUPA 18 natural slate, the design also includes high quality natural timber cladding, sedum green roofing and natural stone blockwork. Kim Brown, Director at Kapra Developments explained: “For the properties on Island Wall, the quality of the materials was very important and the coastal location meant that a durable product was essential. We had used CUPA PIZARRAS’ products on previous projects and so we were confident that the CUPA 18 slate would provide the look, quality and longevity we wanted.” CUPA 18 is a lighter grey slate with a smooth matt surface and has a superior, homogenous finish with only minor variations allowed in the thickness and flatness of the slate. The slate roofs were installed by Bates (Kent), a family owned contractor based near Canterbury, who has worked with Kapra Developments on a number of previous projects. David Clarke, Company Secretary at Bates said: “The Island Wall properties presented a few complexities and challenges due to the steep pitch of the roof and the need to integrate the slate with the other elements such as the large format glazing.  “We’ve used CUPA products on a number of contracts and found the slates very easy to work with. The strength and quality of the slates means that we are able to reduce the amount of wastage compared with other products.” Kim Brown concluded: “To achieve the intended result for these properties has required hard work from everyone involved. We are once again delighted with CUPA PIZARRAS’ products and are pleased with how that element of the build has progressed.” CUPA PIZARRAS’ natural slate is sustainably extracted from quarries in northern Spain. It has an exceptional life span of 100 years and requires minimal maintenance throughout its lifetime.
Sponsored
Green Ridge Primary Academy, Aylesbury

Green Ridge Primary Academy, Aylesbury

Broxap Street Furniture

Modern outdoor spaces for learning, play and socialising were created for Green Ridge Primary Academy.
Sponsored
Fascia SFP Soffit at Green Park, Reading

Fascia SFP Soffit at Green Park, Reading

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Green Park, Reading, BerkshireProject Type: HousingProduct: Raking Fascia with Secret Fix Panel SoffitFinish: Syntha Pulvin RAL 7015 Matt Slate GreyProduct: Meridian CopingsFinish: Syntha Pulvin RAL 9003 Matt Signal WhiteFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Berkeley HomesArchitects: Broadway MalyanMain Contractor: St Edwards Homes Ltd
Sponsored
Honeywell Multi-roof

Honeywell Multi-roof

Liquid Roofing Systems Ltd

Product: FastCoat ProProject: Honeywell Multi-RoofProject Size: 6000m² in: Approx. 3 months
Sponsored
Parkview Green

Parkview Green

SE Controls

Façade automation to achieve a hybrid environmental ventilation solution to create a controllable microclimate to optimise energy consumption/thermal comfort.
Sponsored
Devonian roof for Jurassic fossils, with Glendyne Slate

Devonian roof for Jurassic fossils, with Glendyne Slate

Burton Roofing Merchants Ltd

Fossil museum The Etches Collection, in Kimmeridge, Dorset, is protected by a new high-performance roof in keeping with its character, thanks to Glendyne.
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
Green Bins Meet Green Vehicles; Edinburgh City Council 
Unveils New Electric Refuse Collection Fleet

Green Bins Meet Green Vehicles; Edinburgh City Council Unveils New Electric Refuse Collection Fleet

Rolec EV

Edinburgh City CouncilChampioned as one of the most progressive cities in the UK (and one of the largest) Edinburgh is home to more than 500,000 constituents and an impressive EV fleet of over 150 decarbonised cars, vans, and buses for the dedicated use of the council. With no plans to slow down anytime soon; dedicating themselves to becoming a completely Net Zero city in the next six years.ScopeThanks to funding from Zero Waste Scotland, the council will be welcoming new electric refuse collection vehicles (eRCVs) as part of their goal to electrify the council’s entire fleet by the end of 2024. The new 20 tonne vehicles will help the city to expand their recycling facilities and better support their constituents’ needs.To support the growth of their EV fleet, the council felt the need to expand their chargepoint network, and came to Rolec to devise a plan. New vehicles mean new charging requirements, specifically in this case, the council were looking for ultra-rapid chargers, with the scope to deliver charge to these larger vehicles.The chargers also had to account for the difference in vehicle height and dimensions and therefore needed to be fit with longer than standard cables. Furthermore, with the ever-growing nature of their EV fleet, the council also prioritised chargepoints that could be scaled-up as and when the need arose. SolutionRolec provided Edinburgh City Council with 10 x 80kW UltraCharge 160 chargepoints, each with extended 7m cables and capable of being upgraded to up to 160kW at a later date. Creating a robust and scalable charging network capable of handling the needs of these larger EVs. All of which is backed up by an extended hardware warranty provided by Rolec.They also opted for OCPP 1.6-J hardware to allow them even more freedom with their back-office. Giving the council the opportunity to trial Monta’s software, with the capacity to revert back to ChargePlace Scotland if they wish in the future. Benefit The EV hardware provided by Rolec means the council will be able to meet their environmental aims on two fronts: delivering expanded recycling services to their constituents and cutting fleet carbon emissions at the same time. "We are forever encouraged by local councils who put sustainability at the forefront of what they do, and Edinburgh City Council is no exception. Their continued focus on reducing carbon emissions through advanced policy changes and a passion for fleet electrification has defined this project. It was a pleasure to work with the team and we look forward to seeing their continued development." - Josh Holstead, Business Development Manager, Rolec EV.Project detailsOrganisation:Edinburgh City CouncilPartners:• Rolec EV• MontaIndustries:• Public Sector• Waste ManagementLocation:Edinburgh, Scotland, UKRolec EV Products:• 10 x 80kW UltraCharge 160 Ultra-Rapid chargepoints• Bespoke, extended 7m cablesBenefits:• Permanent installation of an ultra-rapid vehicle charging network to support EV fleet expansion• EV hardware reinforces the council’s green initiatives, specifically the rollout of extended recycling measures
Sponsored
Fast Liquid Waterproofing Solution for Flat Roofs

Fast Liquid Waterproofing Solution for Flat Roofs

IKO Ireland

IKOpro Acrylic Roof Coat has been used to provide a quick (taking only 4 days to complete) and seamless waterproof solution to a leaking roof at Bellman’s Auctioneers & Valuers in West Sussex. Contracts Manager for M Holmes Construction (contractor) admits that it was much less labour intensive than traditional roof refurbishments. He said, “The beauty of this system is that you don’t have to re deck the roof, unlike some alternative liquid systems. So this means you save one day of labour, typically four men on a job this size, plus material costs.”
Sponsored
Asbestos Roof & Cladding Refurbishment Coating

Asbestos Roof & Cladding Refurbishment Coating

Liquasil Ltd

The finish to the asbestos roof and asbestos cladding on this property was faded and the roof leaked in several places, along with the gutter. Liquasil's silicone roof coating, Asbestoseal, was chosen to seal the roof and dramatically improve the aesthetic appearance using specially made RAL colours to the match the original finishes. The asbestos cement gutter was also lined with the Liquasil liquid gutter liner to form a permanent, bonded solution.
Sponsored
The Green Quarter, Southall London

The Green Quarter, Southall London

Tobermore

Paving with character required for one of UK’s most biodiverse developmentsWorking in conjunction with London Wildlife Trust, Berkeley Group’s design objective was strongly influenced by the environment surrounding the scheme. The overall aim of the multi-functional location was to encourage users to socialise and enjoy the open space and facilities available. Residents can enjoy 13 acres of parkland across 2 new parks in addition to outdoor leisure spaces including an amphitheatre, play areas, and fitness trails. The Green Quarter hard landscaping design needed to tie in with the vibrant nature of the area. A functional yet aesthetically pleasing solution was required, ensuring commuter-friendly paving options. Due to the scale of the location, creative laying patterns were required to add character and break up the space.   Tobermore’s Artro adds vibrancy and personality to transformed development Tobermore worked closely with the project team throughout the design process offering complimentary paving visualisations and bespoke sample panels for the extensive hard landscaping on the scheme. The visualisation and sample service provided confidence in the final product selection.  Outdoor leisure spaces including an amphitheatre, play areas, and fitness trails provide a place for residents to unwind. Community events including outdoor cinema screenings and food markets will create a thriving new community. There will also be a new primary school, health centre and community facility. With creativity at its core, Artro block paving was laid in an interesting five-way colour mix of Heather, Bracken, Autumn, Slate and Carbon in a trendy herringbone pattern. Other pedestrianised zones feature Artro in warm clay-like tones of Heather and Autumn in a stretcher bond laying pattern. Artro’s ability to create unique design patterns by seamlessly blending various colour tones adds originality and personality to the scheme.  Thanks to Tobermore’s PrimeTop hard-wearing surface layer, Berkeley Group can be confident that Artro will retain its original appearance for many years to come.     
Sponsored
Metal roof coating project in Leicestershire

Metal roof coating project in Leicestershire

Liquasil Ltd

Failing factory finishes and cut edge corrosion were present across the entire roof and Liquasil's Metalseal metal roof coating system was specified as the most appropriate solution. The roof was cleaned and all failing finishes and rust was removed as far as reasonably practicable. The roof was then coated. In this case, two colours were employed. Liquasil is the only company able to produce silicone coatings in any RAL colour.
Sponsored
Asbestos roof coating project in Haverhill

Asbestos roof coating project in Haverhill

Liquasil Ltd

This was the first asbestos roof coating project undertaken with Liquasil products, back in 2013. The roof was heavily soiled and was cleaned using a DOFF steam cleaning machine, delivering 150°c steam to completely kill moss and lichen spores. The metal fixings were treated with Liquasil's corrosion primer and sealed with Non-Sag Sealer before the whole roof was coated with Asbestoseal, the only BBA Approved asbestos roof coating.
Sponsored
Asbestos Roof Coating - Norwich

Asbestos Roof Coating - Norwich

Liquasil Ltd

This asbestos cement roof in Norwich was soiled with moss and lichen covering the surface and had leaks in several places. Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating was specified to extend the life of the roof and provide an aesthetically pleasing finish. The Contractor, ID Asbestos Ltd, carried out the works safely and efficiently.After being steam cleaned, the metal fixings were treated with our SWT Corrosion Primer and all fixings and cracks were sealer with Non-Sag Sealer. The whole roof was then coated with Asbestoseal 20 to provide a sleek new finish to the old asbestos sheets.Liquasil's Latent Defects Insurance Guarantee was provided upon completion.
Sponsored
Topseal PU hospital overlay roof

Topseal PU hospital overlay roof

Topseal Systems Ltd

Topseal PU was specified over numerous roofs on this hospital covering 1000's of metres. Topseal PU was chosen due to its BBA certification, high performance, 25 year guarantee, low odour together with the failed asphalt roofs and amount of plant on the roof it was the perfect product.
Sponsored
Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s flat-to-pitch conversion system, BritFrame, and lightweight metal roof tile, Slate 2000. The project, carried out by Jennings Roofing encompassed a total area of 500 square meters and aimed to improve the infrastructure of the existing roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. This case study highlights the successful implementation of Britmet's Slate 2000 roofing system and Britframe structural solution in a social housing project. The client, a new customer of Britmet, discovered the systems at the UK Construction Week (UKCW) exhibition. Impressed by the innovative design and features, the client expressed interest in utilising Britframe for a flat-to-pitch conversion project in their social housing development. The client is a housing association responsible for managing and maintaining a portfolio of social housing properties. They were seeking an effective solution to address various issues with one of their buildings, including an ageing roof with multiple repairs, inadequate insulation, and inefficient rainwater management. The objective was to enhance the building's aesthetics, improve water tightness, increase energy efficiency, and minimize future maintenance requirements. The initial meeting between the client and Britmet took place at the UKCW exhibition, where the client became acquainted with Britframe, a lightweight and versatile structural solution. Intrigued by its potential, the client arranged for an on-site visit to further assess the feasibility of utilising the Britframe and Slate 2000 roofing system for their project.Slate 2000 is a durable and aesthetically pleasing lightweight roofing material that offers long-term performance and weather resistance. It's stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of roofs and cladding. During the initial site visit, Britmet's team evaluated the existing roof condition, rainwater management system, and insulation levels. After careful assessment, they provided the client with a budget price estimate for the proposed project. The estimate included the cost of materials, labour, and necessary ancillary items. To streamline the project, the client signed a Project Assist agreement with Britmet. This allowed Britmet to obtain planning drawings and submit the necessary applications on behalf of the client. Additionally, Britmet provided structural calculations, design drawings, and rainwater calculations to ensure compliance with regulatory standards and best practices. The main objective of the project was to convert the existing flat roof to a pitched roof using Britframe and install Britmet's Slate 2000 roofing system. This conversion offered numerous advantages, including improved water tightness, increased insulation, and resolved rainwater management issues. Notably, the internal gutters, which had caused maintenance problems, were relocated externally as part of the new design.Beyond functionality, the new roofing system and structural solution significantly enhanced the building's aesthetic appeal. The modern design of Britframe, combined with the stylish appearance of Slate 2000, seamlessly integrated the property with its surroundings. The improved visual aesthetics added value to the social housing development. One of the key benefits of choosing Britmet's Slate 2000 and Britframe was the assurance of minimal maintenance requirements. Unlike the previous roof covering, which had undergone numerous repairs and reached the end of its life, the new system was designed to be durable and long-lasting. This eliminated the need for ongoing maintenance and reduced future costs for the housing association.Through the adoption of Britmet's Slate 2000 roofing system and Britframe structural solution, the social housing project achieved its objectives of enhanced aesthetics, improved water tightness, increased insulation, and efficient rainwater management. The collaboration between the client and Britmet, from the initial meeting at UKCW to the successful implementation of the project, demonstrated the value of innovative roofing and structural solutions in the social housing sector.
Sponsored
Drapers Garden, London - JAKOB Rope and Rod Green Wall Incorporating Bat Boxes to contribute to wildlife habitats.

Drapers Garden, London - JAKOB Rope and Rod Green Wall Incorporating Bat Boxes to contribute to wildlife habitats.

MMA Architectural Systems Ltd

In order to achieve the BREEAM rating of “Excellent”, the fourteen storey building, constructed in 2009 in London’s Bank Conservation Area, incorporated several sustainable features, including our rope and rod Green Wall System. To create the ideal habitat for wildlife, the green wall design included bat boxes; providing a safe place for bats in the city.Green walls can be used in cities to help improve the local air quality by trapping dust and pollutants; in addition to absorbing carbon dioxide and releasing oxygen. Green walls can also be used as an effective graffiti deterrent in areas where this is an issue, as green walls make the application of graffiti to structures near impossible, and this is just one of many benefits of green walls. Additionally, the green wall is helping to provide cleaner air in the urban environment – and looks great!
Sponsored
Asbestos roof refurbishment coating in Preston

Asbestos roof refurbishment coating in Preston

Liquasil Ltd

This complicated asbestos roof structure was heavily soiled and leaking in numerous places. Asbestoseal was specified because it is the only BBA Approved asbestos roof coating on the market. The roof was cleaned using 150°c steam, which kills all moss and lichen spores on contact, leaving a perfectly clean substrate for coating. The success of any coating comes from its preparation and Liquasil teaches all of it approved installers various cleaning methods. The roof was coated and is now leak free with a much extended life expectancy.
Sponsored
Metalseal Metal Roof Coating - Lichfield

Metalseal Metal Roof Coating - Lichfield

Liquasil Ltd

This 4,000 square metre roof in Lichfield, completed by Projects UK Ltd, was in need of refurbishment and Liquasil's BBA Approved Metalseal 20 was specified for its 20 year guarantee against manufacturing defects. The roof was cleaned and the cut-edges were treated with our unique SWT corrosion primer before a single coat of Metalseal 20 was spray-applied to the roof to provide a protective and decorative finish leaving the roof sheets looking like new.To get in touch, call our team of Building Surveyors on 0121 709 5352.

Showing 253-288 of 321

Feedback