NBS Source
I'm a manufacturer

"partition"

3,021 results found

Sort by:

Showing 253-288 of 335

Sponsored
Wigmore Street, London

Wigmore Street, London

Washroom Washroom Ltd

We worked closely with the architectural team to create a bespoke washroom design as part of this refurbishment project. The washrooms feature a full height, fully integrated wall cladding system including wall mounted mirrors with concealed soap and towel dispensers. Our Concerto integrated duct panels were faced with anodised aluminium to provide an exceptionally durable surface. We also installed glass partitions and our full height Alto Kristalla glass toilet cubicles, each manufactured with acid etch mirror to the face. Highly durable Corian was used for the vanities.
Sponsored
The Charter Building, Uxbridge

The Charter Building, Uxbridge

Radii

Uxbridge's largest ever luxury commercial space is a monumental 324,630 sq ft. Radii AG was approached by dn-a architecture and Bowmer and Kirkland with the task of designing and installing a five-story central atrium with additional fire-solutions. Radii AG offered a streamlined design to ensure a stunning appearance with a time-conscious installation. Linear 27 was used with 40dB Rw toughened laminated glass for the atrium.This helped create the 100-meter long 'street' that ran along the heart of the building. FireStop E30 single-glazed partitioning screens, with FireTec doorsets and automated sliding doors were also installed.
Sponsored
1 Curzon Street

1 Curzon Street

Washroom Washroom Ltd

As part of the project all the Alto toilet cubicle doors and partitions at this Mayfair office were wrapped using innovative architectural film in a dark slate grey textured ash veneer finish - provided as part of Washroom's Refresh Service. As well as being environmentally-friendly and quick to install, architectural film is also extremely hardwearing and durable so will further prolong the lifecycle of the toilet cubicles. The sleek dark wood veneer finish is just one of more than one thousand different architectural films available to choose from including wood, metal, marble, leather and stone.
Sponsored
The Borderline, Soho

The Borderline, Soho

Washroom Washroom Ltd

We installed our Mezzo toilet cubicles, manufactured in white solid grade laminate (SGL) with satin anodised aluminium curved pilasters, at this popular London music venue as part of an extensive refurbishment. The bright white SGL cubicles doors and partitions were designed to highlight the striking, unique artwork on the Concerto duct panels installed behind the wall-hung WC pans in each cubicle. Manufactured from highly durable SGL, the duct panels each feature a different digitally printed graphic. All the graphics were specially designed by the architect to reflect the personality and style of The Borderline.
Sponsored
National Manufacturing Institute Scotland

National Manufacturing Institute Scotland

Planet

The National Manufacturing Institute Scotland (NMIS) is a group of industry-led manufacturing R&D, innovation and skills facilities supported by a network of Partners across Scotland, all working together to transform the future of manufacturing and provide an innovative and multi-use hub that brings together Scotland’s brightest minds in industry, academia and the public sector.The design of the space focuses on collaboration, with a variety of private spaces specified to create areas for focused work and larger group meetings in turn.Planet, working through our northern contracting team, joined the project to provide our expertise in the design, manufacture and installation of a number of our glass partition screens and door solutions to meet the interior design by architects HLM.The standout contribution to this project was the use of Planet’s PURE20XL (38dB Rw) extended screens to produce glass meeting pods, expertly cantilevered to produce an eye-catching ‘floating’ effect. Access to the pods was provided by Planet’s high acoustic performance IsoPro glazed pivoting doors (42dB Rw). Our popular single-glazed PURE20 (38dB Rw) and double-glazed PURE100 (54dB Rw) frameless partitions were utilised for the fronts for many of the meeting rooms and laboratories — along with tech panels to house integrated room booking systems — while some extended PURE100XL screens was placed on the void edge of the digital seminar rooms.Finally, structural atrium glazing facilitated the passage of natural light deep into the internal space — perfect for the inspirational innovative environment NMIS aims to provide to its users.
Sponsored
Residential Steam Suite B

Residential Steam Suite B

Sauna360 Ltd

Helo delivers stunning steam room for prestigious client working with top London based designer, Robin Moore Ede. Spectacular design and innovative technology come together to create the ultimate in relaxation and luxury. Helo were invited to create a bespoke steam suite with Turkish Room and relaxation area joined by two shower towers. An open effect between rooms was achieved with a minimal glass partition. Robin Moore Ede’s intriguing mix of bespoke mosaic sea frieze and honed marble seating with subtle down lighting to the floor created a steam room which offers the ultimate in comfort and visual impact!
Sponsored
Holland Park School, London

Holland Park School, London

Planet

Planet used p100 demountable double-glazed screens for all the classroom frontages and set black laminated timber classroom doors, and for the offices, 30-minuet fire-rated glass doors into our white aluminium slimline door frames. P20 single-glazed demountable partitioning features in the library and sixth form, which includes a gap between each panel of glass, an aesthetic feature to complement the internal atrium glazing. Eclipse sliding doors were used throughout. Planet's Architectural Glass' in-house design team worked with Aedas to make sure the angled atrium glass was in line with the design intent.
Sponsored
SYSTEMGLAS® Ligna provides assured fire protection for timber framed butt-jointed glazing

SYSTEMGLAS® Ligna provides assured fire protection for timber framed butt-jointed glazing

Promat UK

Designing, specifying and installing fire rated timber framed butt-jointed glazing is now easier with the assurance of a fully traceable supply chain with the launch of SYSTEMGLAS® Ligna by Promat, one of the country’s leading manufacturers of fire, thermal and acoustic solutions. Ligna gives designers the ideal balance of assured fire protection and maximum light transmission in all kinds of timber framed glazed partitions and screens. Ideal for offices, healthcare, education, retail and public sector applications, it has been tested to provide integrity and insulation (EI) fire protection from 30 minutes up to 60 minutes (EI30 to EI60).
Sponsored
008. Secli Weinwelt, Buchs, Switzerland

008. Secli Weinwelt, Buchs, Switzerland

Vetrotech Saint-Gobain UK

A holistic business solution, which offers various possibilities to work, meet, connect and enjoy the time spent with partners, employees and clients sharing the passion of good wine. The inside of the building features approximately 130 m2 of various Contraflam glass solutions, which ensure maximum fire safety while emphasizing the architectural design. The round shaped partition walls connecting production and meeting rooms, in particular, were a great challenge for glazed fire-resistance. The fire doors were developed and produced in collaboration with Forster Profile Systems and provided the necessary accessibility while ensuring fire safety for up to 30 minutes.
Sponsored
Gymbox, London Victoria

Gymbox, London Victoria

Washroom Washroom Ltd

Our colourful Luminoso glass shower and toilet cubicles combine to create an energising shower and changing area for a new gym in the heart of London’s Victoria. The vibrant shower and changing rooms at Gymbox in Victoria feature our Luminoso glass shower and toilet cubicles, back-painted in a striking mix of bright oranges, reds and yellows to complement the bold tiling design. The cubicles feature high specification 10mm clear float toughened glass doors, partitions and division panels. We also installed floating Corian trough style vanity units with wall mounted taps and soap dispensers in the changing room area.
Sponsored
New York's Whitby Hotel

New York's Whitby Hotel

Crittall Windows Ltd

New York City’s newest boutique hotel makes a bold statement in upper midtown Manhattan, thanks in no small part to the extensive use of Crittall steel windows, doors and internal screens and partitions. The Whitby is the second in New York opened by Firmdale Hotels, whose owners have already made a big impression in central London use fenestration from Crittall. Opened in late February, The Whitby’s position called for higher acoustic attenuation, so Crittall MW40 fenestration was selected. These windows can accept up to 30mm thick glazing providing excellent acoustic as well as thermal performance while maximising daylight.
Sponsored
Clean Rooms - Inficon Cologne

Clean Rooms - Inficon Cologne

Lindner Group

Completed WorksClean RoomAluminium grid systemsLine 55A 200 sqmIntegrated lightsSH LED-H 49 Pcs.Supply airFilter Fan Unit (FFU) 22 Pcs.Accessories for clean room ceilingsInspection hatch for clean room ceilings 10 Pcs.Partition systems 100Multiclean LVT 370 sqmMulticlean LVT 437 15 Pcs.Hinged doorsSwing MPH 7 Pcs.Door interlocking systemsDoor interlocking system Inline 2 5 Pcs.Airlock systemsMaterial pass box Matlock REG 1 Pcs.
Sponsored
Premium Plus roller blinds and Aluminum Venetian Blinds in Marset HQ

Premium Plus roller blinds and Aluminum Venetian Blinds in Marset HQ

Bandalux Industrial SA

For these headquarters based in Barcelona, a former industrial site was reformed, to adapt the structure to the brand needs . The architect explains that “understanding the design of the interior spaces [was] an important element of branding capable of generat [ing ] brand value”, according to Stefano Colli .On the big glazed façades, Premium Plus roller blinds are used with a Polyscreen ® 403 in Slate color . They are in tune with the brand colors and style, and also they provide optimal solar management . Aluminum Venetian blinds in Smokey Grey finish are used for the internal glassed partition to provide intimacy in working spaces . Both systems cover the sunlight management needs as well as they turn into a key decorative item .
Sponsored
004. Carnal Hall, “Le Rosey” in Rolle, Switzerland

004. Carnal Hall, “Le Rosey” in Rolle, Switzerland

Vetrotech Saint-Gobain UK

The new complex of the elite boarding school “Le Rosey” in Rolle, Switzerland, houses a range of first-class facilities. Over 470 m2 of fire-resistant glass - Contraflam 30 - has been installed, including partitions, fire doors, staircases and meeting rooms. This solution - with glass sizes up to 1,800 x 3,800mm - offers supremely reliable fire resistance, 100% UV stability and, long lasting maximum transparency, keeping rooms and facades bright. Vetrotech provides large custom-made glass solutions that stand up to the demands of such iconic projects, offering uncompromised safety whilst enabling boundless design freedom for architects and constructors.
Sponsored
Picadoor Case Study

Picadoor Case Study

Union Industries

Union Industries is helping a growing Berkshire manufacturer to keep its new facility extension properly segregated.Union Industries designed, manufactured and installed a Picadoor and two Static Fabric Industrial Partitions to create a 3-Sided static enclosure. The Picadoor, which was originally created as a bespoke product for an existing customer, is one of Union Industries’ smaller, lighter weight, fast acting doors and helps to maintain temperatures and reduce energy consumption in small internal applications. The door has a variable speed motor, inverter system inside the panel for controllability and is ideal for small internal doorways where regular access is required, but environmental conditions also need to be maintained.
Sponsored
Type G200 - Project Smoove

Type G200 - Project Smoove

London Wall Design Ltd

Having outgrown their previous offices, Smoove – a company operating in the property sector (formerly ULS) – took the decision to take on three floors at Masters Court; a fully refurbished office building in the quaint town of Thame, Oxfordshire. They swiftly appointed HNB and Leap Architects to deliver an overhaul of the dated interior that would better suit the Smoove team.We were approached to deliver a glass moving wall capable of separating the ground floor kitchen and main open plan space when required. Our Type G200 system was chosen, which provides transfer of natural light when the partition is closed while simultaneously stopping the transfer of sound.
Sponsored
Reebok Sports Club

Reebok Sports Club

Washroom Washroom Ltd

We worked with the architectural team at Sparcstudio to deliver unique contemporary washrooms and changing areas for the Reebok Sports Club. We installed our highly engineered Marcato toilet cubicles, featuring a flush front and rebated finish, ensuring division panels and doors meet edge to edge for maximum privacy, in the washroom areas. Manufactured from solid grade laminate, the cubicles feature wood veneer doors complemented by yellow partitions. The same wood veneer was used for the Concerto integrated duct panelling system and urinal modesty panels. Our Luminoso glass shower cubicles were manufactured with a green coloured layer beneath the toughened glass.
Sponsored
Tours Duo, Paris - Pyroguard Protect

Tours Duo, Paris - Pyroguard Protect

Pyroguard UK Ltd

The ChallengeInstalled within the reception hall and circulation areas of the two towers, Pyroguard Protect, which was chosen by fire protection specialists, Pyrometal, has helped architect Ateliers Jean Nouvel achieve his ambitious vision, without compromising on safety.Following the successful testing, Pyroguard Protect was installed throughout DUO-1 and DUO-2.In the reception hall, Pyroguard Protect EI120 was fitted inside PYROTEK steel profiles to form full height glass partitions and in the circulation areas on each floor, around 690 square metres of E30 was used inside double-leaf doors with EI60 glass partitions.The same was also used in the corridor doors as a means of compartmentation, which connects various areas to the stairs and lift landings.The SolutionTours Duo rises on a former industrial site on the edge of the River Seine in the Paris Rive Gauche district and at 180 m, DUO-1 is set to be the third tallest building in the capital.The pair of towers, DUO-1 and DUO-2, which lean to form an impressive asymmetrical ‘V’, will house offices, retail spaces, restaurants, a hotel and a top floor panoramic bar.In the design of the mixed-use scheme, Ateliers Jean Nouvel was tasked to create high performing, aesthetically striking buildings and as such, decided to take a bioclimatic approach to reduce energy use and make the most of the outdoor weather conditions.Giving the best protection for people and property, Pyroguard Protect provides integrity and heat insulation for 30 to 180 minutes (EI classification).The solution also provides 1B1 impact classification without the need for additional counterpanes, high performing acoustic properties and peace of mind throughout the lifespan of the product due to its UV stability.
Sponsored
Perton First School

Perton First School

Excelsior Panelling Systems Ltd

The Project Perton First School has been open for over 40 years and the infant washroom facilities are in need of modernisation.The school prides itself its family ethos and has seen generations of families come the doors.The ChallengePropose a system with children of nursery age in mind. Consider the height of the doors & partitions.Peardrop range is not supported by an overhead rail and the frontage is fixed at the floor and gable walls only.Flooring substate needs to be at lease 60mm thick and stable to ensure a secure fixing point at the base of the foot.Deliver a non-standard laminate to enhance the systems aesthetics. The SolutionExcelsior, working alongside G Evans and Entrust, are excited to have installed our Harlequin Select Range at Perton First School. The school chose our Peardrop Range with low level accessible doors and magnetic locks, perfect for the classroom environment. The cubicles doors were finished in our vibrant Lolly Pop Digital Print & the area was surveyed to ensure suitable fixing points.Harlequin Peardrop is the ideal system for children of nursery age, the system is self-supporting on an aluminium leg; the legs ability to perform is reliant of the strength of the floor substrate which in this case proved suitable, enabling the client to proceed with this infant friendly system.The full system is professionally manufactured with children in mind providing easily accessible doors for children whilst ensuring efficient dimensions for adults to supervise.SpecificationProduct Range: Harlequin Select HPLDoors: 18mm High Pressure Laminate, Lolly Pop Digital PrintPilaster: Polyrey C018 ChardonPartition: 18mm High Pressure Laminate, Polyrey C018 ChardonIronmongery: SBAA 
Sponsored
Joseph Leckie Academy

Joseph Leckie Academy

Excelsior Panelling Systems Ltd

The Project Joseph Leckie Academy £3.5 million modern new wing received Walsall Council’s planning committee approval in April 2015, and it has been full steam ahead since then. Speller Metcalfe awarded contractor and commenced building the state of the art 21 classroom block in May 2015. The ChallengeThe Architects vision was to create a minimalist washroom décor with flush frontage cubicles and high specification wash stations.The overall finish to be non-fussy and unobtrusive.Cubicles sited below a bulkhead were required to appear to float and all legs and fixing to be hidden.Standard vanity frontages and sinks did not meet the brief, a bespoke wash station was required. The Solution Excelsior Planar 12mm Solid Grade Laminate has proven an excellent choice for the building, the flush frontage provides a seamless finish, and the durability of solid grade laminate panels is perfect for a heavy use environment such as a school. Finished with a ‘P’ section headrail for maximum stability, eradicating any lateral movement provided the rigidity the system needs.The overall aesthetics of the installation is extremely pleasing, the cubicles overall height @ 2100mm on a 50mm leg is a standard height system however having a bulkhead in place has increased the sense of privacy and delivered the opulence of a floor to ceiling enclosure. The 50mm leg is set back inside the cubicle, fixed onto the partition which enhances the seamless finish from the exterior and infers the system is floating.SpecificationProduct Range: Planar 12mm Solid Grade Laminate CubicleDoors: B070 Blanc Megeve )Pilaster: Gris Orage G059Partition: Gris Orage G059Ironmongery: Stainless Steel
Sponsored
Lords Cricket Ground

Lords Cricket Ground

Excelsior Panelling Systems Ltd

The Project The world-famous Lords cricket ground has undergone a huge redevelopment scheme. Phase 1, The Warner Stand, has undergone complete modernisation by Main Contractor BAM and was officially opened by His Royal Highness The Duke of Edinburgh on 3rd May 2017.  The refurbishment includes works to the ornate, iconic Victorian Pavilion, with a wing-like roof and fabric canopy; the seating, ensuring maximum visibility for spectators; and the indoor bars and restaurants with panoramic glass windows ensuring the ultimate experience. The Challenge Deliver multiple specifications across differing floors and areas. Propose a system that will deliver a reflective aesthetic, similar to glass. Manufacture and install toughs at bespoke lengths requiring site joints   The SolutionExcelsior was delighted to work on this prestigious project with Populous Architects and BAM Construction. Several specifications and finishes were chosen across the project, our Planar 20 in High Gloss being a favourite. The High Gloss laminate created a glass like, reflective finish which opened up the space and made for a truly show stopping installation. Designer White Solid Surface tops, and Stainless-Steel finishes were also used to dramatic effect across the scheme.SpecificationProduct Range: Planar 20Doors: 12mm SGL, Abet 478 Light Grey Lucida Gloss, Abet 879 Graphite Grey MattPilaster: 20mm SGL, Abet 478 Light Grey Lucida Gloss, Abet 879 Graphite Grey MattPartition: Partition: 12mm SGL, Abet 410 Ice White Lucida Gloss, Polyrey B070 Blanc Megeve MattIronmongery: Stainless Steel
Sponsored
Ray Dolby Centre for Cambridge University's Physics Department

Ray Dolby Centre for Cambridge University's Physics Department

Norwood Group Limited

PROJECT OVERVIEW Named after Ray Dolby, a PhD alumnus of Cambridge University, former fellow of Pembroke College, inventor and founder of Dolby, the a/v company, the new facility was designed in Revit by nbbj and is being delivered in BIM by Bouygues UK. Co-funded by Dolby, it will create a centre for innovation, bringing together the academic and research capabilities of the university’s physics department with private sector R&D projects.OUR SCOPE WORK Norwood is delivering a £1.9 million package that includes custom-design, manufacture and installation of the £200K, 2.85m high fire-rated glazed wall. The company’s remit also includes a 2500m2 walk-on ceiling with a 100kg/1200mm2 load capacity to enable ease of maintenance. Norwood is also responsible for design, manufacture and installation of a cleanroom partitioning system totalling 4080m2. For this element of the project, the Norwood team designed a bespoke version of the company’s standard 1000mm modular cleanroom partitioning system to meet the required 1200mm specification, and developed a bespoke T-bolt system to enable customisation of the cleanroom facilities for evolving occupier requirements throughout the lifecycle of the building.The fire-rated glazed wall was designed and manufactured by Norwood and independently tested by UKAS-accredited fire safety services specialist, Warringtonfire, to ensure 60-minute fire integrity and insulation . With each glazed panel weighing 200kg, the installation was meticulously orchestrated by Norwood. The installation will showcase the work being carried out in each of the cleanroom spaces as visitors enter the building via the atrium, with blackout blinds installed to enable any commercially sensitive projects to be hidden from view where required.
Sponsored
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Norwood Group Limited

PROJECT OVERVIEWOrthoplastics is a global leader in the development and manufacture of orthopaedic implants and components, helping surgeons transform lives around the world. This project, the first phase of a fit out programme for a new facility in Bacup, Lancashire, involved the delivery a new cGMP advanced manufacturing area for the production of Ultra High Molecular Weight Polyethylene (UHMWPE) sheets used in the manufacture of orthopaedic implants. The requirement was for a production area that can provide a controlled environment, isolated from the rest of the floorplate, during processing periods, while enabling access by a remote controlled mobile crane to remove the completed UHMWPE sheets when the equipment is non-operational.PROJECT SPECThe new Orthoplastics building is a single storey facility and the size and weight of the UHMWPE equipment required excavation of additional space below ground to accommodate both the machine and the building services required to process materials at up to 2400C. The 1000m2 processing area needs to be a cleanable cGMP compliant environment to avoid the risk of contaminants in materials that will be used in orthopaedic surgery. The partitioning for the perimeter is 11m tall and connected to the ceiling of the existing building shell. To provide the structural stability required for such tall walls, the standard Norwood 100mm Mediline partition thickness has been increased to 200mm. The project also included rapid rise doors for access by the remote control crane that removes the large UHMWPE sheets following the process. The fully demountable double skin bi-panel system enabled a fast and robust installation enabling the project to get back on track quickly following interruption by the pandemic. The panels were prefabricated in-house by Norwood, enabling a fast-track installation programme.Norwood was also designed, manufactured and installed a range of their single and double steel doors in blue.
Sponsored
Swallow Place, London

Swallow Place, London

Washroom Washroom Ltd

Washroom delivered new washrooms, colourful staff shower facilities and two new reception for a Mayfair office refurb. Washroom's highly engineered Marcato SGL shower cubicles with full height bright yellow doors and light grey pilasters and partitions. Each spacious shower cubicle includes an integrated Legato bench in the same bright yellow. Forza solid grade laminate Z-shaped lockers with key-operated locks were specified in two shades of grey to create a striking stripe effect within each bank of lockers. Solid surface vanity units in a light grey concrete-effect finish with inset sinks complete the contemporary new changing area.
Sponsored
Focus Dursley

Focus Dursley

Planet

Focus is a new ‘ultra-modern working space’ in Dursley, designed to provide comfortable, flexible and convenient working and collaboration spaces to freelancers and local businesses in the surrounding area in the Cotswolds.Planet’s western contracting team worked directly with clients the Cullen Group on this fit-out to bring the eye-catching by design interiors experts OMO to life.Our popular and versatile PURE20 (40dB Rw) partition system was used to great effect for Focus’ office fronts and single person phone booth spaces, with the slim profile IsoClear glass doors (34dB Rw) providing access.Curved PURE20 glazing was also manufactured by Planet at our in-house facilities and used with IsoClear for two of the space’s larger ’domed’ meeting rooms.
Sponsored
Type G200 - Duff & Phelps

Type G200 - Duff & Phelps

London Wall Design Ltd

Kroll (previously Duff & Phelps) operate within the risk and financial advisory sector, with UK offices based in Manchester’s Northern Quarter for which we had the pleasure of providing a Type G200 folding partition system during a recent refurbishment. The operable wall allows the space to be transformed from a large open plan area into two separate rooms as and when required.The Type G200 system offers impressive acoustic, achieving up to Rw 47dB when fully closed – minimising noise transfer between the two spaces, without compromising on light transfer. In this instance, a fully glazed, full height pass door allows for easy access between the two smaller rooms when the system is in use.
Sponsored
Type G200 - Duff & Phelps

Type G200 - Duff & Phelps

Movawall Systems Ltd

Kroll (previously Duff & Phelps) operate within the risk and financial advisory sector, with UK offices based in Manchester’s Northern Quarter for which we had the pleasure of providing a Type G200 folding partition system during a recent refurbishment. The operable wall allows the space to be transformed from a large open plan area into two separate rooms as and when required.The Type G200 system offers impressive acoustic, achieving up to Rw 47dB when fully closed – minimising noise transfer between the two spaces, without compromising on light transfer. In this instance, a fully glazed, full height pass door allows for easy access between the two smaller rooms when the system is in use.
Sponsored
The Pyramids Centre Leisure Complex Project

The Pyramids Centre Leisure Complex Project

Helmsman

The Pyramids Centre in Portsmouth has had a new lease of life with a £2.5m makeover. The ageing facility is now a modern leisure complex offering a fun attraction to the local families. The new facilities include a state-of-the-art gym, trampoline, and soft play park.Helmsman was sub-contracted to supply the lockers and cubicles package providing a turnkey solution to create a modern and sharp changing room area with a comfortable feel.For the Pyramids Centre leisure project we manufactured, delivered, and installed modern laminate lockers of 3 and 5 doors. They are heavy duty and suitable for a wet environment. A row of three-compartment lockers have an integrated cantilever seat stand matching the Abet Walnut (616) laminate lockers and cubicles. The integrated seat stand on these lockers is a great space-saving solution and is perfect for this area.The front line cubicle range fitted the requirements for the toilet and shower cubicles, installed alongside the lockers. The Walnut laminate runs throughout these changing rooms as one of the dominant colours. The cubicle partitions are in Abet Light Grey (478) to separate each cubicle and bring light into the space to complement the rest of the interior.The vanity units and timber integrated plumbing system (IPS) panels are also manufactured from the matching laminate. The IPS in the toilet cubicles are the same colour as the partitions, giving a natural flow throughout. The wall to floor benches and free-standing benches are in Walnut laminate colour as laminate slats are perfect and protected in the wet areas.Most importantly Helmsman has a dedicated and experienced in-house design team supported by its on-site factory. From the outset, we bring a combination of skills and creativity to influence our clients’ decision-making to ensure that concepts turn into reality. From start to finish, we are committed to providing high standards and exceeding customer expectations.
Sponsored
Marsh McLennan

Marsh McLennan

Radii

Radii’s elegant double glazed Parallel 50 (45dB RW) and Parallel 100 (50dB RW) partitions with single glazed pivoting doors was used for Marsh McLennan’s office fronts, meeting rooms and larger ‘project rooms’ along with retro-fit room booking and aluminium faced tech units.Parallel 100 was also utilised with pocket sliding doors for the Level 6 conference rooms, while 4490mm high Parallel 100 extended screens were installed to the East Thames Room on Level 6 and conference rooms. This required structural steel work to support both the weight of the glass above the transom and the hanging weight of a folding wall below by others. Linear 59 (39dB Rw) with bi-parting sliding doors was used on small meeting hubs on Level 6.
Sponsored
Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

Norwood Group Limited

PROJECT OVERVIEW We were awarded the prestigious project to provide our cleanroom system for a new Compound Semiconductor Innovation Centre which will provide a collaborative environment for innovation, testing and research. The world-leading Catapult Innovation Centre will drive advances in compound semiconductor technology and applications, enabling the UK to spearhead future technologies, including autonomous vehicles, 5G mobile networks, renewable energy and the Internet of Things (IoT).SCOPE OF WORKOur scope of work encompassed design and installation of our Mediline partitioning solid and glazed systems to create an IS07-classified cleanroom along with a number of laboratory environments, including a photonics lab, a power electronics lab, an advanced packaging suite, an evaluation lab, a radio frequency lab and a high-power lab. We also provided pedestrian doors, our Metal Pan Ceiling and fire rated vision panels.
Sponsored
Glazed Pivot Sliding Door Panels

Glazed Pivot Sliding Door Panels

ModernGlide Ltd

The MG900 is an ideal solution to any project, where it can pitvot, slide or interlock to form a solid glazed partition.Furthermore, the aluminium frame can be coloured to your choice to match your design or branding needs. These panels retain a room’s spacious sense of proportion and maximise light and clear viewing lines. Truly a magnificent office aesthetic.The benefit of our MG900 panels is that they work in the same way as conventional movable walls and can be either single or double point suspension.With the slim back painted border you have clear view visual lines. This allows a superior light flow around the office, cost-effective installation and flexibility in the work environment.Plus the simple fact that they look elegant and classy. Not only these, but they also offer exceptional sound reduction allowing for privacy to be had amongst clients or for important internal meetings.
Sponsored
Education | Rainbow Nursery

Education | Rainbow Nursery

Venesta Washroom Systems Ltd

A functional, child-friendly washroom design featuring Genesis toilet cubicles was created for Rainbow Nurser. The nursery opted for Venesta’s Genesis toilet cubicles, a popular choice for early education settings due to it's versatility and many customisable features including low-level doors and curved partitions. The toilet cubicles were specified in High Pressure Laminate (HPL) making them ideal for nursery usage, allowing for easy cleaning and simple maintenance, meaning they really will stand the test of time.For cost savings and reduced installation times, our Vepps pre-plumbed panelling system was specified. In addition, low level vanity units were installed featuring semi-recessed basins. A favourite for our youngest customers as they don’t get the water from the basin on their clothes when washing hands. Read the full case study for more details.
Sponsored
The Distillery, Glassfields

The Distillery, Glassfields

Lusso Systems Ltd

Glassfields is a new high-spec office development which forms the gateway to Bristol’s Temple Quarter. The completed building offers the perfect environment for how businesses work today.With 93,000 square feet of high-quality office space, it has been designed with the tenants’ well-being in mind and provides a flexible, adaptive, and creative space. The design of the interior called for an industrial look which made Lusso 25 Geometric glazed partitioning system, with its black powder coated frames and banded look, the ideal choice. High acoustic Silenzio doors and Lusso 25 frameless single glazed system, also powder coated in black, were used to complement the design. The overall look provides a stunning, dramatic, and classy environment in which to attract and retain talent.The building has achieved BREEAM Excellent accreditation and an EPC rating A, embracing industry best practice, energy efficiency measures and sustainable technology.
Sponsored
Bracknell Forest Council - Times Square

Bracknell Forest Council - Times Square

LSA Projects Ltd

Architect: AtkinsInstaller: Vitec Ceilings and PartitionsProduct: Gustafs Linear RibA small but perfectly executed project at 75m2, the new Bracknell Forest Council chambers at the Times Square building in Berkshire is clad with Gustafs Linear Ribs to the ceiling and feature wall.The plain white ceiling ribs are organised into multiple square rafts across the space installed in alternating directions and interspersed with traditional ceiling tiles, lighting, and vents.The split feature wall which stands either side of the speakers’ podium and main panel desks is made up of a mixture of natural Oak and Bamboo veneer and painted ribs installed with irregularly positioned 45° angled joints.The ribs were delivered oversized and cut to size on site, the mitre joints were also cut on site by Vitec and joined using extra-long installation clips to keep the joint inline and give the illusion of a dip-dyed rib.
Sponsored
MG600 Flush Glazed Movable Acoustic Wall London

MG600 Flush Glazed Movable Acoustic Wall London

ModernGlide Ltd

ModernGlide were over the moon too be involved with this project with a top London Interior Company at St Katharine Docks London. Installation of over 66 meters of sliding movable wall panels to help create a sleek and flexible studying environment. Featured in the video is the MG600 flush glazed movable wall that when closed creates a central room with the panels meeting at right angles and the addition of 2 access door panels. Particularly desirable for office spaces, our MG600 glazed office partitions and glass movable walls offer multiple benefits to your workspace and for your employees. The benefits of having glazed acoustic walls include allowing a superior light flow around the office, cost-effective installation, flexibility in the work environment as well as the simple fact that they look elegant and classy. Not only these, but they also offer exceptional sound reduction allowing for privacy to be had amongst clients or for important internal meetings.
Sponsored
Friargate, Coventry

Friargate, Coventry

Excelsior Panelling Systems Ltd

The Project  Friargate One is a 150,000 sq ft, 13 storey, low energy building forming part of a £700m project to create a new business district in Coventry.  The building sets the standard for the remainder of the 37 acre Friargate scheme that will include 13 more office buildings, two hotels, homes and shops all set to transform the area around the train station. This project is the largest development in the West Midlands Combined Authority.   The Challenge Deliver a product to satisfy the architects design & meet the highest standards offered within the industry. Provide a full range of accessories to compliment the system. Manufacture bespoke boxed out mirror units complete with rebated lighting strip. Ensure the system is installed to highest standard to create a seamless fronted wall of cubicles and superloos across varying floors.  The Solution Floor to ceiling Flush 44 system installed throughout male & female washrooms and unisex superloos situated over two floors.   The system encompasses a 44mm MR core with a hardwood rebated edge detail. The overall finish is modern and sleek creating a seamless flush wall of cubicles with complete privacy and comfort for the users.Close management of each phase from site survey through CAD drawings, call up and manufacture ensured we had complete control of the project and were able to accurately survey the areas and install the seamless system desired by the client.SpecificationProduct Range: Flush44 HPLDoors: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPilaster: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPartition: Partition: HPL bonded onto 38mm MR Core, Formica Folkstone F7927Ironmongery: Stainless SteelAvailable Finishes:These Systems Are Available In The Following Finishes:• Natural Wood Veneer• High Pressure Laminate• High Gloss LaminateAccessories Product Range W/C'sSpecificationProduct Range: AccessoriesMirror Backing Panels: Blanc Menuires B015 with 4mm Safety Backed MirrorsWaste Bins: Prestige Waste BinOther:Paper Towel HoldersWaste BinToilet Roll HoldersSoap Dispenser

Showing 253-288 of 335

Feedback