NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,130 results found

Sort by:

Showing 1765-1800 of 1905

Sponsored
Santander Unity Place MK

Santander Unity Place MK

Planet

Working through our Midlands contracting office, Planet provided smoke sealed extended height PURE20XL glazing to floors 2 to 7 of the building’s internal atrium. 6.7m high Schueco Jansen Viss screens were placed on ground level, while PURE20XL was also utilised along with rebated 1.5 leaf IsoPro doors (Rw 36 dB).Extended 3.3m LOFT100 screens (Rw 47 dB) with back-painted glass above transom level were placed in the 300-capacity auditorium with double IsoPro doors. Finally, banded LOFT20 partitions and matching IsoTec acoustic doors (Rw 38 dB) and double glazed LOFT54 (Rw 45 dB) with IsoPro doors were installed for the client’s meeting rooms and phone booths respectively.The Unity Place development is a great example of a people-first workplace design that hopes to be a catalyst for the regular return to the office for many of Santander’s staff. The building is set to achieve a BREEAM Excellent rating for sustainable performance, aided by Planet’s EPD documentation for our LOFT and IsoPro solutions.
Sponsored
The Anchorage Gateway, Salford Quays

The Anchorage Gateway, Salford Quays

URSA UK LTD

The Anchorage Gateway in Salford Quays is a new multi-storey building in the centre of Salford. The main wing is 29 storeys high whilst the lower tower tops out at 19 storeys. The ground floor contains almost 400m2 of commercial space and the upper floors contain 290 residential units and 800m2 of amenity space.The building is reputed to be one of the highest brick clad buildings in Europe, Kinlan Brickwork being specialist sub-contractor.Domis Construction is the main contractor on this scheme. URSA UK Ltd was chosen as the preferred insulation manufacturer. We supplied over 11,500m2 of 100mm URSAPAN BLACK - a unique glass mineral wool rainscreen cladding insulation slab;·      Euroclass A1 fire rating (non-combustible).·      Thermal conductivity of 0.035 W/mK.·      BBA Certified. Kate Fox, Area Sales Manager for the Midlands stated, ‘Following the success of this initial partnership URSA are now the preferred supplier of rainscreen insulation and our products have been used on Fifty5ive Queen Street in Salford with others in the pipeline including Derwent Street’.
Sponsored
Islington Square

Islington Square

EH Smith Architectural Solutions

This breathtaking development is characterised by three statement residential buildings and a brand new public realm offering 170,000 sq. ft. of quality retail, dining, lifestyle and leisure options, including luxury health club and a cinema. The principal building is an internal conversion of a magnificent Edwardian masterpiece with the façade and entire external structure retained and refurbished, whilst another hybrid building preserves the Edwardian exterior structure at ground level with new-build framing on upper levels. Completely the Square is an all-new contemporary design, which is anticipated to become one of Islington’s most iconic buildings.CZWG Architects have taken the former Royal Mail sorting office under its wing and presented a forward-thinking vision of London living rarely attained in modern designs.EH Smith worked with CZWG to select and supply the bold mauve coloured rainscreen from our Partners Agrob Buchtal and worked with the specialist cladding contractors, Openwood and Commercial Roofing, to provide the bespoke engineered support system with our partners Systea.
Sponsored
D-marc - demarcation a Collective Protection Solution

D-marc - demarcation a Collective Protection Solution

Safety Fabrications Limited

D-marc 105TM demarcation system – a collective protection demarcation solution. The doctrine “prevention is better than cure” is one that rings true in so many instances. Common sense tells us that it much better to prevent a fall than it is to arrest the fall once it has occurred. The Working at Height Regulations (WAHR’s) 2005 reinforce this argument. Whilst in many instances it is not always practical to remove the risk of a fall; rainwater outlets will always require cleaning, rooftop plant will require regular maintenance etc.. there are a number of ways to protect the worker from the immediate hazard the fall presents. The simplest way and that which much closely echo’s the doctrine “prevention is better than cure” is to keep the worker away from the fall hazard. The most effective way of achieving this and that which is advocated by the WAHR’s is through the provision of a Collective Protection solution. A collective protection solution is one which will “collectively protect all those who access the area”. In a rooftop situation where the hazard is a fall from the roof edge, Collective protection can be achieved by raising the parapet or through the installation of a full perimeter guardrail. Alternatively the worker can be kept a safe distance from the roof edge through the installation of a demarcation system. –Health and Safety in Roofwork HSG 33 states that “where work is not done at the edge, demarcation barriers can be provided at a safe distance from the edge (usually at least 2 meters), e.g. work on an air conditioning unit in the middle of a roof.”.      An example of where The D-marc demarcation system has recently been specified and installed at Crown Woods College, Eltham to provide safe access to rooftop mounted plant. The client was looking for a solution that would;Provide a collective protection solutionNot penetrate the existing roof covering and therefore not compromise the roofs waterproofing or air-tightness.Be lightweight so as not to require an additional support structure.Provide easily identifiable access routes ensuring no exposure to fall hazardsBe low maintenance and ideally have good environmental credentials.  D-marc was able to meet all these criteria and has the additional benefit of giving the customer the piece of mind that whilst it does not rely upon any means of mechanical fixing to the roof structure, it is tested to withstand wind speeds in excess of 105 mph. Such testing is a requirement of BS6399-2 Code of Practice for Wind loads which states that all components that form a building are required to withstand a 1 in 50 year wind speed.   D-marc was used extensively on the project as part of the collective protection demarcation system to create clearly defined safe access routes across the roof to theplaces requiring regular maintenance work. Having created the safe routes to the places of work, the D-marc was then used to demarcate the safe working zones upon the roof top. To ensure a complete collective protection solution was provided in isolated areas where it was not possible to keep the worker away from the fall hazard a guardrail was used. The easy to install, non penetrating D-marc system creates a clearlydefined access route and a safe working zone for all those undertaking regular rooftop maintenance works.
Sponsored
GEZE automatic doors promote a feel-good atmosphere for young patients

GEZE automatic doors promote a feel-good atmosphere for young patients

GEZE UK Limited

GEZE is also a leading provider of door, window and safety technology in the UK. GEZE UK Ltd implemented state-of-the-art door solutions in the John Radcliffe Children's Hospital in Oxford, skilfully combining clinical functionality with a comfortable atmosphere for the young patients.Invisible efficiency: Slimdrive SL sliding door systemsAutomatic glass sliding door system with Slimdrive SL-drives in discreet 70 mm design.The John-Radcliffe Children's Hospital designed by Parry Bowen architects, and built in accordance with the latest hospital architectural standards.. The real eye-catcher of the main entrance is the double-leaf automatic sliding door, with a powerful GEZE Slimdrive SL drive system that works almost invisibly thanks to its construction height of only 70 mm. The Slimdrive SL drive automatic drive fits unobtrusively and elegantly into the contemporary clinic façade, and quietly and efficiently manages thousands of movement cycles every day at the busy children’s hospital."We are delighted by the design of our entrance area. It’s exactly the kind of atmosphere that is expected of a modern children's hospital. The high-quality workmanship makes a key contribution to a comfortable and inviting atmosphere for patients and clinical staff," says Vickie Holcroft, Project Manager at the John Radcliffe Hospital.Automatic swing doors: convenience in the entire clinical areaThe swing door systems from the GEZE TSA drive series are used everywhere in the clinic complex where functionality and ease of access are of particular importance. The automatic TSA 160 door drive ensures light and reliable opening and closing of the automatic doors, even in heavily frequented areas. The TS 4000 overhead door closer provides flexible ease of access at swing doors with manual opening. The closing force of the door closers can be individually set and can be perfectly adjusted to meet the needs of each clinical area. They enable door leaves to be opened with minimal effort, e.g. for children and weak adults. The TSA drives make transportation of beds and/or patients easier for clinical staff.Access control for supervised clinical areasTo safeguard access control to sensitive clinical areas, the swing doors to the operating rooms and intensive card wards were also equipped with a TSA drive with an electromagnetic locking system. This guarantees that only authorised persons can enter these areas.
Sponsored
142-146 Harley Street

142-146 Harley Street

3v Architectural Hardware Ltd

If you’ve ever seen the film The King’s Speech with Colin Firth playing King George VI you’ll recall it features the King overcoming a debilitating speech impediment thanks to the world-famous speech therapist, Australian Lionel Logue. In real life Logue practised at 146 Harley Street between 1926 and 1952. In 2020 the 142-146 Harley Street premises underwent a substantial refurbishment at the request of owners Howard de Walden Estate. The Howard de Walden Estate extends 92 acres and includes the freehold to over 800 properties and includes the healthcare hub the Harley Street Medical Area [HSMA].The brief for the Harley Street premises was to provide a self-contained D1 Medical building of 6,299 ft² across lower ground floor to fourth floor. The linked grade II listed buildings needed to provide accommodation suitable for a ‘first in class’ medical operator to work from, whist retaining and respecting the building’s historic character and charm. It was also noted that the restoration and improvement works should serve to enhance the overall appearance of the neighbouring properties and surrounding Harley Street Medical Area.Working alongside Howard De Walden Estates were Sonnemann Toon Architects LLP, construction contractor Whistlers Ltd and architectural ironmonger 3v Hardware. 3v specified, scheduled and supplied the ironmongery packages for both the traditional upper floors, and the contemporary lower medical area floors for this piece of 19th century architecture.“The project presented a challenge to 3v Architectural Hardware who were given two separate briefs. The old building needed updating while retaining its traditional feel and the medical areas in the basement required a practical and easily maintained product,” said Chris Taylor at 3v.Matt black and satin steelProducts supplied included traditional knob furniture from Frank Allart in a matt black nickel finish for the traditional areas and Vieler satin stainless steel furniture for the medical areas. All the accessories were carefully chosen in matching or sympathetic finishes. For example it was not possible to fit concealed closer into the existing doors and therefore overhead, surface mounted white closers were used to blend in with the door finish.Appropriate sash window furniture was sourced and supplied in the same matt black nickel finish.The client requested that modern fire signage on the face of the door be avoided if at all possible. Instead, ‘lollipop’ signage was suggested, but with the caveat that this did not comply with the guidelines of BS5499 and therefore approval from Building Control would be required. Samples were put forward and approved (two per door leaf were supplied: one for the leading edge and one for the jamb but only one has been fitted).The project was finished to such a high standard it secured 3v Architectural Hardware and Sonnemann Toon architects a highly commended in the Public Health and Education category in the GAI/RIBA Specification Awards 2022. GAI technical manager Douglas Masterson, who chaired the judging panel and performed the inspections of shortlisted projects, called this project “really impressive”. “The history of this building felt tangible as you walked around it and the ironmongery specified really tapped in to this,” he says. “The matching of the various items of ironmongery products throughout was exquisite and the matt black specified was an impressive contrast to the white door. It was a very sympathetic refurbishment which was a delight to inspect.”Photography: Neil Kenyon
Sponsored
Station Approach - Brick Slip Feature Lintels

Station Approach - Brick Slip Feature Lintels

Keystone Lintels Ltd

The former Marlow Railway Station dates back to 1873 and stood at the junctions of Station Road and Lock Road. The Old Coal Yard, adjacent to a station platform now only present, has been developed and designed by Bellwood Homes on the concept of three converted Victorian railway terraced buildings.Broadsman House, Palatine Place and Fenman Court consist of three 2-bedroom houses, eight 2-bedroom apartments and one 1-bedroom apartment providing commuters stylish suburban living. Keystones brick slip feature arch lintels and special segmental arch lintels encompass the traditional and contemporary balance of the housebuilders architectural vision.ChallengeThe fashionable commuter town on the Thames has been well preserved, limiting modern styled developments to maintain its original character and historic fabric of heritage buildings. Bellwood homes wanted a sense of purpose for their regeneration project – reconnecting people with what really matters to them, property location and design. The vernacular architecture provides both. A prime location for commuters to ride the branch line into London, renown as the ‘Marlow Donkey’, and fits subtly within the notable context of Georgian, Edwardian and Victorian styles of architecture in Marlow.SolutionKeystone’s technical engineer designed extra heavy-duty brick slip feature arch lintels for ground, first and second floor openings with a 1085mm span and 543mm rise. Over forty brick slip arches were manufactured by Keystone’s production team to a high quality and consistent finish. Each Hoskins Maltings Antique brick was cut to size and bonded using a BBA approved construction adhesive to the load bearing lintels. The patented perforated lintel design allowed the adhesive to squeeze through the perforations and form a ‘mushroom’ on the inside, providing a mechanical lock between the steel lintel and the brick slips.The offsite economical solution did not require skilled bricklayers on site to replicate each traditional arch. This saved approximately labour costs of one bricklayer per arch per day and ultimately weeks of the project build schedule. All prefabricated lintels were delivered to site and ready for final pointing in line with the phased construction plan of the three buildings being erected. The arches produced in a factory control environment were unaffected by torrential weather and winter reduced day light hours limiting productivity. This can often occur on other build schedules which lead to further delays in creating architectural features with real significance to the landscape.The offsite construction method facilitated onsite construction further by supporting bricklayers to recreate window tax designs, bricked up window spaces seen in buildings from the Victorian period. The detail of the façade is prominent most through the repetition of window arches positioned symmetrically on elevations facing the Marlow station. Keystones heavy-duty special segmental arches measuring a 2400mm span, with either a 600mm or 450mm rise provide a modern contemporary twist which feature above glazed bedroom windows and are in complete contrast to the smaller traditional arched windows striking a balance between old and new architecture.Testimonial“From R&D to installation we found Keystones prefabricated lintels very efficient. They reduce brick wastage approximately by 5%. Typically, traditional built arches would require one bricklayer for approximately six hours work. Therefore, this reduced labour costs on site whilst supporting bricklayers to achieve the desired architectural design.”Matthew McGillSite Manager at Bellwood Homes
Sponsored
122 Waterloo Street, Glasgow

122 Waterloo Street, Glasgow

Pilkington United Kingdom Limited

The newly completed 122 Waterloo Street development in the centre of Glasgow offers its occupants floor-to-ceiling glazing throughout, with almost uninterrupted views thanks to the latest Schüco curtain-walling system designed, manufactured and installed by Edinburgh-based façade specialist Charles Henshaw & Sons Ltd.But, impressively, the landmark building – which will be the Glasgow headquarters of global financial services firm Morgan Stanley – will also be one of the most energy efficient buildings in Scotland, thanks in part to high-performance glass coatings from Pilkington United Kingdom Limited.The scheme has been certified BREEAM Excellent, and achieved an ‘A’ rated Energy Performance Certificate (EPC), the latter based on a detailed assessment of the building’s energy performance. The glazing helps to minimise this by reducing energy emitted from the building, as well as the heating effect of the sun, both of which can make maintaining a comfortable interior climate more energy-intensive.A glass for all seasonsThe scale of the building and the large area of glass used means that excessive radiation of heat from the building could lead to rapid heat loss during colder conditions, requiring an increase in heating to keep the interior warm.To mitigate this effect, the glazing features a Pilkington Optitherm ™ S1 Plus low-emissivity coating which reflects radiated heat back into the building.The second issue that can affect buildings where most of the envelope is glazed is excessive heat build-up when the sun is shining directly into the interior. This can present a challenge for building managers, often requiring high levels of energy-intensive air conditioning.To combat this, a solar-control coating has been used, reducing the amount of heat energy that is able to enter the building while maintaining high levels of transparency. Michael Metcalfe, commercial sales manager at Pilkington UK, said: “The Pilkington Suncool™ 70/35 T coating selected by the design team offers high visible light transmittance, reduced solar transmittance and excellent low-emissivity all in one product.“This means the floor space will be brightly lit by sunlight but won’t suffer from overheating on warmer days.”Clear viewsThe coatings are not the only innovative part of the glazing used in the project, as the glass is held in place by the latest structurally bonded curtain wall system from manufacturer Schüco. Each unit contains a large pane of clear glass and a smaller pane of opaque, coloured spandrel glass, creating horizontal lines across the façade between each floor of the building.Michael Metcalfe continued: “The metal carrier frames in which the glass sits are extremely low profile, so the edges of the panes of glass are very close to one another. This removes the mullions normally associated with unit-based glazing systems, creating a flush glass surface with almost uninterrupted views.”The clarity of the glazing was further improved by the use of Pilkington Optiwhite™ true low-iron glazing throughout, which significantly reduces the slight green tint that is inherent in standard float glass.On the ground floor, Pilkington Optilam™ laminated glazing was used to provide protection against manual attack and increase the security of the building.Completed in December 2017, the nine-storey building also includes 155,000 sq ft of Grade A office space.Project: 122 Waterloo Street, GlasgowClient: HFD GroupArchitect: Micahel Laird ArchitectsCurtain walling supplier: SchücoInstaller: Charles Henshaw & Sons LtdImages courtesy of S G Photography
Sponsored
UCL PEARL

UCL PEARL

HAG Ltd. - The Door Specialists

“A great achievement by all involved”– Neil Turvey, UCL Estates Assistant Director Capital ProjectsOverviewUCL is one of the world’s leading universities, as well as being London’s number one university for Research Strength, where they have consistently led the way with not only their academic excellence but also their global impact.UCL PEARL (Person-Environment-Activity Research Lab) was completed in Autumn of 2021 and is a unique facility, designed to explore how people interact with their environment in a groundbreaking 4,000m² building. Sophisticated systems are used to gather a rich array of information which will help to understand these reactions and how they can be used to create a better urban environment for the future.PartnershipHAG Ltd. were tasked with protecting the building both through the supply & installation of essential fire protection systems, such as fire shutters & fire curtains and high security steel door sets throughout the building, located in Dagenham, in the London Borough of Barking & Dagenham.As a UK wide company with nearly 40 years’ experience in dealing with large scale contracts of this size, we were able to assist the main contractor by ensuring reliability, professionalism, safety and ensuring that the project was completed on time.All our fire protection products are fully compliant with the Regulatory Reform (Fire Safety) Order 2005 and certified to UKCA.All of HAG’s fire curtains have been independently tested and certified by the international fire testing experts at Warrington Fire, are tested to the latest standard BS EN 1634:2014 and marked to BS EN 13241-1:2003.HAG Ltd.’s steel doors offer an exceptional level of security, whilst not compromising on aesthetics. Our doors were made to the specification of UCL PEARL, to seamlessly sit in their surroundings and ensured not only security, but they are suitable for high levels of use and offer thermal insulation. The ProjectThe original UCL PEARL site consisted of various buildings, one of which was Grade II listed 1940’s. The new building is the first zero-carbon in-use building for UCL, and one it hopes will set the bar for future developments.Within the 10m high building, you will find life sized environments, such as a train station, village square, high street, even a pop-up theatre, all of which have fully controlled conditions and the ability to change materials, such as the flooring or wall cladding. UCL can adjust lighting, sounds and experiment with smells and the other senses to see the impact that these changes have on people. “A building that will be able to house the world”– Nick Tyler, Chadwick Professor of Engineering and Director of UCL Centre for Transport StudiesUp until now, assumptions have been made about how people react to environments, but this has been based on outdated data. UCL PEARL can now pave the way, with the use of sophisticated systems, such as eye trackers, brain scanners & accelerometers, to ensure a more informed suite of ground-breaking data going forward.UCL PEARL are already working in partnership with the London Underground and are researching the design of the built environment for people with dementia.Not only are there legal requirements and obligations for fire safety and protection within this building, but fire shutters & fire curtains should be regularly maintained to ensure they are suitable for intended use, they are safe to use, in good repair and subject to a program of monitoring & reviewing.This is another reason that HAG Ltd. were chosen to assist with this unique facility, as we can offer a full & comprehensive maintenance & repair service, to ensure that their fire shutters & curtains continue to work efficiently and with ease.
Sponsored
Riverside Terrace

Riverside Terrace

Forbo Flooring Systems

FORBO’S MODUL’UP VINYL CREATES WELCOMING MATCH-DAY SPACE A unique hospitality space located in Cardiff’s iconic Principality Stadium, the Riverside Terrace is notable for its move away from the traditional match-day hospitality experience. To create a premium experience, Design and Build Specialists Benchmark Designs called upon Forbo’s adhesive-free sheet vinyl floor covering – Modul’up.  Situated on the banks of the River Taff, the Principality Stadium plays host to a range of events and is renowned as the home of Wales’ Rugby Union team. Working with PSE Wales and Levy UK, Benchmark Designs looked to create a distinctive interior space, capable of offering a premium match-day experience for general admission visitors. Combining a variety of furniture and surfaces with a diverse street food menu, the Riverside Terrace was designed with the city high street in mind, as Hannah Glazier, Interior Designer at Benchmark Designs, explains: “The brief we received for the Riverside Terrace was to take this space and transform it from a traditional food service and interior style, to something with a more up-market feel that had a broad appeal to customers.  “Cardiff’s high street has such a wide range of street food eateries and PSE Wales were keen to incorporate this heritage into the Riverside Terrace, with a different vendor selected to cater each match, along with live music. With such a dynamic environment, we needed products that would complement the usage of the space, providing a practical and refined finish. For this, texture was a really important design element and we wanted to make sure the surfaces we specified would complement and contrast with each other.” With this brief in mind, Hannah looked for flooring solutions that would deliver on the desired aesthetic and feel, stating: “The space itself had a very industrial design, with exposed fixings and a metal-studded bar front adding different textural dynamics. With texture and visual quality in mind, we needed a floor covering that came in neutral shades to match the other finishes, but that could also create a warm and welcoming environment. It was for this reason that we specified Forbo’s Modul’up, in its Concrete and Oak colourways combining the texture and tone of concrete with the warmth of timber.  “The realistic timber appearance of the Oak colourway was ideal for the zoned seating area, while we used the Concrete for the circulation areas, as it nicely matched the design scheme for the walls and bar tops. It was important that we used these complementary colours throughout the entire interior, from wall to floors, lighting to surface tops, helping to create a cohesive and well-rounded space, which feels welcoming yet distinctive.” However, it wasn’t just the aesthetic requirements that were key, but the functionality of the flooring too. Hannah explained: “With a capacity of over 74,000, the Principality Stadium is an extremely busy environment. As such, it was essential that the floor coverings used were able to keep up with the high footfall expected at the venue. This was another reason behind our specification of Modul’up. It has excellent indentation resistance, which was perfect for this space, being able withstand intense usage on match-days. It’s also able to be installed adhesive-free, which made it extremely easy to fit, saving valuable time during the installation phase of the refurbishment.”  She concluded: “Our intention was to create a fun and informal space that was suitable for all demographics to use. We feel we achieved this, with our use of versatile and flexible furniture, wall and floor materials contributing to a relaxed and casual hospitality experience.” Having opened in October 2022, the Riverside Terrace has been put to good use over the 2022 Autumn Nations Series, as well as the 2023 Six Nations, with a PSE spokesperson saying of the new space: “Forbo’s flooring has truly transformed the space, with its exceptional quality, versatile design and hard-wearing nature contributing to a modern and trendy atmosphere. The choice of flooring seamlessly merged functionality with style, making it an ideal option for entry-level hospitality settings. Overall, we’re delighted with the finished project and have enjoyed entertaining our customers in the new space.”  Benchmark Designs’ work on the Riverside Terrace saw the project achieve ‘Commended’ in the 2022/23 iteration of the Forbo Escapes competition. Find out more about Forbo’s Modul’up collection, here: https://www.forbo.com/flooring/en-uk/commercial-products/modul-up-adhesive-free-sheet-vinyl/cum7pa
Sponsored
Case Study - Proteus Pro-System® - Emma House

Case Study - Proteus Pro-System® - Emma House

Proteus Waterproofing

Emma House, Romford, a residential apartment block built in 2007, needed a new waterproof membrane for the entire roof area after the single ply membrane, installed just 10 years earlier, had failed. The specification by our clients asked for a cold applied system to be used during the refurbishment to minimise disruption to residents, while providing a permanent waterproofing solution.The ChallengeCore samples taken of the roof build-up showed there had been extensive water penetration which required urgent remedial action. Impossible to repair, the complete roof system had to be stripped back to the roof deck by Proteus Waterproofing’s approved contractor. The approved contractor installed a new Proteus Pro-System® BUR (built up roof system) incorporating Proteus Pro-Therm insulation, to provide a new seamless roof – an area of some 150 square metres – offering a 20 year guarantee.Why Proteus Pro-System® was specifiedProteus Pro-System® was installed using no heat, providing a seamless waterproofing membrane on completion. Proteus Pro-System® is a high performance, seamless and cold-applied waterproofing membrane for flat and pitched roofs. It cures to provide completely seamless waterproof protection and has excellent thermal and UV stability, making it suitable for use in all climates.Proteus Pro-System® does not brittle, deteriorate or discolour with age. It uses atmospheric moisture to trigger its cure process and unlike conventional polyurethane systems can cure under water, without gassing or foaming. It also becomes resistant to rain damage and may therefore be applied in relatively poor weather, without any subsequent loss of performance or durability – making it ideal for Emma House.About Emma HouseEmma House consists of 14 one-bedroom and 19 two-bedroom apartments just minutes away from the centre of the market town of Romford, which offers shops, services and a wealth of bars and restaurants. When first built in 2010, Emma House offered young professionals an opportunity for affordable housing close to London and has remained at the forefront of the property market in Romford ever since.
Sponsored
The Terrace | Lee Valley

The Terrace | Lee Valley

RYNO

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!
Sponsored
AOJ RESTAURANTS - SWING DOOR

AOJ RESTAURANTS - SWING DOOR

Next Doors Ltd

In addressing the demands of a thriving commercial fast food venue, we devised a tailored solution to create a dedicated entrance exclusively for online delivery and collection orders.At the core of this situation was the installation of a durable, commercial grade aluminium swing door, engineered to endure the high traffic flow characteristic of such establishments. Seamlessly integrated with a local access control system, this door allowed staff to securely lock the entrance after hours while still facilitating convenient access from outside via a digital keypad. From hardware installation to software integration, our in-house team managed every aspect of the installation with precision and efficiency.To reinforce the restaurant’s brand identity, custom graphics were applied to the door, carefully curated to align with the client’s specific preferences. This meticulous attention to detail not only enhanced the visual appeal of the entrance but also contributed to a cohesive and professional aesthetic that resonated with customers and staff alike. By providing a comprehensive solution prioritising security, accessibility, and brand representation, we effectively met the unique needs of the fast food venue, ensuring seamless operations and customer satisfaction.
Sponsored
Soundis Acoustic Flooring at Kings Court, Warrington

Soundis Acoustic Flooring at Kings Court, Warrington

Soundis

A £5m renovation scheme in Warrington has been presented with the “Best Change of Use to Existing Building” regional award by LABC (Local Authority Building Control) and Warrington Borough Council.The scheme required the conversion of a former office building, Kings Court, in Central Warrington, into 32 luxury flats, comprising of a mix of one and two bedroom apartments, arranged over three floors of accommodation. These flats are situated above retail units and restaurants. The renovation included a further two exclusive duplex penthouses for Phase 2.As part of the renovation, Main Contractor Emerald Bay Construction required an acoustic flooring solution to meet Approved Document ‘E’ Building Regulations and therefore provide overall resident comfort, in terms of Sound Insulation between separating floors. As the building structural floor was primarily concrete, Soundis put forward a solution that involved 2,072 m2 of Soundis ChipPanel 28 to help with Impact Noise. This shallow deck floating floor is ideal for concrete floors where Airborne Noise is not an issue but Impact Noise Attenuation needs to exceed the requirements of current Building Regulations.
Sponsored
RAYNES PARK SCHOOL - HEAVY DUTY SERVING WINDOW

RAYNES PARK SCHOOL - HEAVY DUTY SERVING WINDOW

Next Doors Ltd

In transforming the reception area of a modern and thriving school, we were tasked with ensuring the security of reception staff while also facilitating the seamless interactions with visitors and managing deliveries effectively.To address this multifaceted requirement, we proposed the implementation of our heavy duty bi-parting serving hatch window system. This innovative solution offered maximum security, allowing reception staff to lock the window as needed to maintain control over access. However, it also featured a unique bi-parting action; when one window was manually pushed open, the adjacent window would simultaneously open, maximising the available opening space. This design not only enhanced security but also facilitated smooth and efficient service for visitors, enabling reception staff to manage interactions with ease while maintaining a secure environment.By combining functionality with security, our solution provided the school with a versatile and adaptable reception area that could accommodate a wide range of needs, from everyday visitor interactions to handling deliveries, all while prioritising the safety and security of reception staff.
Sponsored
St Andrew Square

St Andrew Square

Allgood Ltd

Now reimagined as The Edinburgh Grand, the formerA-listed RBS head office built between 1938 and 1942 is animpressive building situated on St Andrew Square. With manypieces of Victorian antique brass and pewter ironmongeryand hundreds of original period doors throughout, theironmongery solution had to accommodate the traditionalaesthetic and be fit for the many demands of a modern hotel.Allgood was commissioned by the project’s architect andinterior designer, both long term partners of Allgood; KarenBrown of Chris Stewart Group and Eirini Christodoulou ofMorgan McDonnell. With such a striking, but unusual finish,finding coordinated hardware was a challenge. Severaloptions were assessed before settling on a brass finishapplied to the Allgood door closers, cylinders and joinerysubcontractor’s hinges.A collection of classic Frank Allart handles was chosen for allapartment front doors, which also integrated with the hotel’saccess control system. To match the patina of the agedhandles, a satin nickel-plated surface was given a light bronzefinish to produce an aged nickel silver appearance. Thisunlacquered, ‘living’ finish, will oxidize and patinate naturallyover time.
Sponsored
340a Clapham Road

340a Clapham Road

Ash & Lacy

In partnership with leading global investment firm KKR, Regal London recently completed a strategic new site at 340a Clapham Road, SW9, situated between Stockwell and Clapham North. Previously a brownfield site (tool hire depot), the site has been completely transformed into a vibrant mixed use, residential-led development, totalling 94,740 sq ft and will deliver 62 one, two and three-bedroom apartments spread over nine floors. The ground and lower ground floors also comprise approximately 18,250 ft2 of flexible commercial space. Planning permission was granted in June 2017 following a collaborative working relationship with the London Borough of Lambeth and the project reached its completion in 2021.With a high quality and contemporary design, both of which are hallmarks of Regal London schemes, the development perfectly complements the surrounding streetscape of new build and period properties, featuring a subtle interplay of façade materials including brick, aluminium and glass installed by Buildtherm Services. Ideally located for commuters, an established network of transport links is within easy reach of the development, with Stockwell Underground Station just 0.2miles away, as well as Clapham North Underground Station and Clapham High Street Overground Station both within a short walk. A thriving social and leisure scene is also nearby, led by the bars, pubs, restaurants and cafes, as well as a selection of amenities, in situ along the lively Clapham High Street and its surrounds.The undeniable kerb-appeal of this luxury residential development is testament to the design capabilities of the modern methods of construction used throughout the build and the quality of workmanship involved. The architect’s ambitious concept design called for a modern and sleek interpretation of the surrounding vernacular to satisfy planning requirements. The vision is clearly represented by the multiple challenging interfaces; including large expanses of glazing, cantilevered balconies and rooftop garden spaces which represented an important consideration within the design of the main structure and supporting steel frame systems. In order to comply with the latest building regulations for residential buildings over 18m in height, topping out at 9 storeys, Regal London also needed to ensure that all façade materials met with the requirement for non-combustibility, with a minimum EN13501-1 rating of A2, including the balconies.Over 3000m2 of A1 rated NaturAL-X brick cladding has been installed across several new elevations, with the architect having selected 3 different brick finishes to satisfy planning requirements, specifying subtle and muted tones including a textured dark, smooth off-white, and glazed white. As well as varying the colours and textures of the brick cladding, hundreds of bespoke cut and bonded return bricks were manufactured to suit the angular interfaces at balcony levels. The project design also called for elements of flexibly orientated brick coursing, with soldier courses, stack bonded and soffit return sections featuring at ground level and interspersed within the columns and beams stretching across the front elevation. The adaptability of this BBA certified innovative brick cladding system allows for modern interpretations of brickwork design to be easily integrated using standard components, without any requirement for additional structural support and with the added reassurance of all relevant system testing.Set back from the main brick façade, the top two floors featuring luxurious penthouse apartments are clad in VariAL-CF2 Concealed-fix 3mm aluminium cassettes, with a powder coated finish produced to Qualicoat standards. This CWCT tested, A2 rated rainscreen system is designed to accommodate large format vertically orientated modules, as well as complex details such as soffits, verges and goalpost details; making it eminently suitable for the balcony fascia areas too. Concealed fixings located in the panel joints are colour coated to match the panels, delivering an uninterrupted aesthetic. With long-term maintenance in mind, VariAL-CF2 allows for individual panels to be demounted, removed and replaced if required, without causing any detriment to the surrounding areas.
Sponsored
Soundis Absorb-R Gypline Visible Acoustic Spray Plaster at Jodrell Bank Centre for Astrophysics

Soundis Absorb-R Gypline Visible Acoustic Spray Plaster at Jodrell Bank Centre for Astrophysics

Soundis

The Jodrell Bank Centre for Astrophysics is the astronomical research centre of The University of Manchester. The centre is a world leader in radio astronomy-related research and technology development.Rough textured spray plaster...Our brief was to create a moon like surface ceiling that not only looked realistic, but most importantly to absorb sound and background noise from within the centre.We installed the Absorb-R Gypline Visible Acoustic Spray Plaster to the surface following the contours of the profiled metal deck, providing a Class A Sound Absorption.Absorb-R Gypline Visible Acoustic Spray Plasteris an extremely flexible seamless sound absorption system. The carbon-neutral Absorb-R GypLine visible acoustic spray is a high-quality and environmentally friendly acoustic spray that absorbs unwanted noise and can be used in a wide range of environments.The Absorb-R GypLine visible is a combination of recycled paper, wood adhesive, water and professional installation work. The tubular structure of the cellulosic fibres enables effective reverberation absorption.
Sponsored
Absorb-R GypLine Visible Acoustic Spray Plaster Channel 4 Studies

Absorb-R GypLine Visible Acoustic Spray Plaster Channel 4 Studies

Soundis

New HQ in Leeds...The national broadcaster first announced it would be opening a new HQ in Leeds in 2019. Almost two years on, around 200 members of staff are beginning to settle into their new home at the Majestic in Leeds city centre.Soundis were contracted to supply & install approximately 2,050 sq m2 of seamless acoustic spray plaster to the industrial style ceilings.Our client opted for the rough texture Absorb-R GypLine VisibleAcoustic Spray Plaster System 35mm thick. We installed the plaster to the surface following the contours of the profiled metal deck, providing a Class A Sound Absorption.The carbon-neutral Absorb-R GypLine visible acoustic spray is a high-quality and environmentally friendly acoustic spray that absorbs unwanted noise and can be used in a wide range of environments.The Absorb-R GypLine visible is a combination of recycled paper, wood adhesive, water and professional installation work. The tubular structure of the cellulosic fibres enables effective reverberation absorption.
Sponsored
University of Brighton, Bioscience Building

University of Brighton, Bioscience Building

Ash & Lacy

The 8,500m2 Biosciences building is clad in silver anodised ACM panels generally 1.3m high and up to 6.4m long that work together to wrap around the complex elevations. Each individual panel purpose-made and pre-curved at Ash & Lacy’s West Bromwich site, to fit around and match the windows on the building. The protruding raked capping details were also manufactured in the same material, in order to provide a fully cohesive design. Original concept architects, Llewelyn Davies Yeang, specified 3,500m2 Ash & Lacy Facade for the extensive new build, to give the building an innovative and hi-tech finish, reflecting the standards of the department itself.The design of the seven-storey building responds to the constraints of a steeply sloping site divided by a service road creating staggered floor levels, interesting external spaces and a flowing façade. The science block also features a sedum green roof fitted with solar panels for the heating of domestic water contributing to the very good BREEAM rating it has secured.
Sponsored
James Watt Dock

James Watt Dock

Forterra Building Products

James Watt Dock is a development of 137 new-build one- and two-bedroomed flats for social rent. The homes, built over five blocks, will offer residents magnificent views over the historic dock and the River Clyde. Residents will also benefit from parking, amenity units, and a landscaped public space.PROJECT INFOThe site is a brownfield waterfront site adjacent to the Grade A listed Sugar Sheds, which are a unique example of Scotland’s Victorian industrial architecture. The sheds became the design driver, aiding the architects in establishing mass, orientation, position and material.Farmstead Antique, from Forterra’s Butterley range, with its tumbled and distressed multi patches, was selected for its similarity to the bricks used in the Sugar Sheds. It allowed the design of the new development to relate to the historic building while delivering a modern, clean-cut façade.With a water absorbency of only 7%, the brick also offered the high technical performance required owing to the development’s location on the Firth of the Clyde, a robust marine environment.
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Fibre reinforced concrete for container terminal

Fibre reinforced concrete for container terminal

Tarmac

This major expansion of the deep-water container terminal at Liverpool docks would significantly increase the footprint and capacity of the site. The site handles the world’s largest container ships and connects road, rail and canal networks directly to the heart of the UK mainland. As part of this project, external concrete surfacing was needed that would deliver long term resistance to the high volumes of HGV traffic using the terminal. After discussions with the contractor, the solution proposed was Tarmac’s TOPFORCE fibre reinforced concrete with a combination of synthetic macro and micro fibres. TOPFORCE can eliminate the need for some traditional steel reinforcement, making it quicker and easier to place. It offers excellent longterm durability making it ideal for commercial and industrial sites used by HGV traffic. This solution would deliver a saving in both labour and material costs and avoid the budget impact of the rising cost of steel. As well as improving the durability and structural performance, the use of macro fibres also improved sustainability significantly by reducing embodied carbon compared to traditional steel reinforcement. 
Sponsored
How to prevent flooding. Northampton Service Station and Lorry Park, UK.

How to prevent flooding. Northampton Service Station and Lorry Park, UK.

ULMA Architectural Solutions

We have improved the drainage system at this lorry park and service station in this town to the north of London.  The problem was that the drainage system installed in the area did not have sufficient capacity to drain the rainwater, leading to dangerous accumulations of water on the road surface.Service stations and lorry parks have a constant flow of vehicles. There are also some areas where HGVs turn, making it necessary to guarantee the safety of the installation of the channels in order to prevent breakages and accidents.Good advice on your drainage system avoids problems and gives you peace of mind.In these cases, it is essential to have a consultancy service that, taking into account all the necessary parameters (location, rainfall, surface slope, weight to be borne by the grating (load type) and length of the drainage line), defines the model best suited to the site.In this project, 250 ml of Civil-F polymer concrete channels, model F150K, were installed for load type F900. And it has a grating secured at 8 points. It is important for you to know this.
Sponsored
Aintree University Hospital

Aintree University Hospital

Roché Systems Ltd

THE PROJECTRoché were asked with helping refurbish the Critical Care Unit at Aintree University Hospital by providing a suitable shading solution for their critically ill patients who rarely get chance to leave the ward. The project was part of a £35 million development and marked the completion of the project.THE CHALLENGEThe key design concern for the awnings was ease of use as well as keeping the area aesthetically pleasing for patients and visitors.THE SOLUTIONThe Markilux Syncra Uno Flex freestanding awning frame was installed outside the Trust’s Critical Care Unit. This particular solution is used in cases where fixing options are limited with boxes at the base to stabilise the frame. Larger bases were specially designed to create weighted flower boxes for a unique outdoor effect. The Markilux 6000 full cassette awning was then secured onto the frame keeping the fabric completely enclosed when retracted. Grey fabric was chosen to suit the modern aesthetic of the building with the added benefit of UV protection and water resistance.
Sponsored
Ocean's Park

Ocean's Park

Lorient

Opened in 1977, Ocean Park is a marine mammal park, oceanarium, animal theme park and amusement park situated in Wong Chuk Hang and Nam Long Shan in the Southern District of Hong Kong.In 2005 they embarked on a HK$5.5 billion development plan that saw it expand to over 80 attractions and rides, and steadily grow visitor numbers, making it the world's 13th most visited theme park, and one of the largest theme parks in Asia.Due to open in 2019, the Hong Kong Ocean Park Marriott Hotel is being built at a cost of $639m. In addition to 471 rooms, the five-star hotel will include a 16m high aquarium in the lobby, lagoons, a ballroom and a rooftop garden. As well as facilities for families attending the park, it will also be equipped to host meetings and conventions. The hotel and water park are part of a plan to transform Ocean Park into an international resort.Lorient supplied DS acoustic, smoke and fire door seal and LVH44 air transfer grilles to the Ocean's Park theme park in Hong Kong.
Sponsored
Rhondda Heritage Park

Rhondda Heritage Park

Polyroof Products Ltd

The Rhondda Heritage Park is a renowned tourist destination in South Wales, offering a glimpse into the coal mining community that thrived in the area for over 130 years until the early 1980s. Every year, thousands of visitors take a guided tour led by former colliery workers to experience the life of coal miners.The Heritage Park takes great pride in its appearance and the local heritage it represents. However, the aging asphalt roof terraces that covered the old mine shafts had been leaking constantly, damaging the visual appeal of the visitor site.The ChallengeThe Polyroof technical team was called in to help with the waterproofing and refurbishment of the two roof terraces, measuring over 1100m², that protected the underground mining attraction. After conducting a thorough survey of the roof terrace areas, a customized specification was prepared. This specification included a comprehensive set of recommendations for addressing the issues that had caused the aged and worn condition of the terrace areas over the years. To support the proposal, additional information was provided to the client to demonstrate how a liquid system could seamlessly encase and waterproof the terraces while maintaining an aesthetically pleasing solution that was true to the authenticity of the site.Satisfied that the solution proposed would provide the long-term peace of mind they were looking for, the Heritage Park awarded the contract to RM Polymers Ltd.Before starting the work, any areas affected by fungal growth or moss were treated with Polykill Anti-Fungal Wash to eliminate all spores. Any holes in the asphalt were smoothed out or removed, and levelled using Polyroof Structural Repair Mortar. All large cracks and voids were cleaned and repaired using the same mortar.PVC protrusions were removed and surfaces were cleaned with acetone. Any damaged, loose, or unsound concrete or brickwork was removed and repaired using Polyroof Structural Repair Mortar. All repairs were allowed to cure and dry before priming.The SolutionOne of the main features of the tourist attraction is the mining carts that were used to transport coal around the mine tunnels during its operation. Similar to train tracks, the mining cart tracks are fixed into the ground using metal bolts and fixings which over time had become a weak point for water ingress. Concrete and sandstone had been used as a “quick fix” to prevent rainwater entering the mine shaft below but a long-term solution was now needed. The cement and sandstone was carefully chiselled from the rails, exposing the original metal tracks which were then lifted and abraded back to their original condition. Whilst lifted, the underlying surface was made good before the application of the Protec System. Railway sleepers were then laid on a sacrificial layer on top of the waterproof membrane, upon which the tracks and mining carts were re-instated.As the terraces are constantly trafficked by the general public, the client was clear that an anti-slip finish would be required on any walkway areas.Following the application of the Protec System, Polyfinish and Quartz Sand Anti-Slip was applied to all walkway areas, to provide slip resistance and surface protection. A 50mm margin around the perimeters of the terrace was masked off to provide a neat termination of the anti-slip finish. Ensure masking tape was removed whilst resin was still wet. Then a third coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and whilst wet, clean dried quartz sand (0.7 – 12mm) was broadcast at an approximate coverage rate of 4.0kg/m². Once cured, the loose sand was removed.WorkmanshipThe engine houses along the tour experience featured vast amounts of intricate details and unique items and structures, such as “Bertie and Trefor” – the names given by the mine owner to the mine head stock wheels. This presented an exceptional challenge, particularly in regards to the difficulty of working on the intricate details of the degraded mastic asphalt upstands and decking.As a result of many years of weathering and gravity, the vertical sections of asphalt on the raised terraced roof had slumped and rippled, leading to stress cracks and ultimately water ingress. To overcome this ugly problem, the asphalt was stripped from these vertical sections back to the concrete and removed from site in accordance with the Health and Safety policies in place. The contractor then installed new 18mm OSB3 to these areas to create a flat substrate for the Protec System. The incorporation of Polyroof pre-formed GRP Drip trims at the bottom of the OSB3 ensured the timber would not be exposed to any rain water in the future as well as provide a neat, edge detail.To keep the overall aesthetic feel of the site, the application of the liquid waterproofing system at wall abutments was critical. This, combined with the undulating nature of the stone and brickwork meant that the contractor would not be able to install a cover flashing or termination bar. Instead, the contractor carefully dressed the system onto the wall to the standard minimum 150mm upstand height and into a chase.The edging was then finished with a mortar to provide a neat and clean weatherproof finish, in-keeping with the traditional methods of the site at the time of its construction.The roof terraces that cover the old mining areas also act as the main walkways to the Heritage Centre’s tour routes. Therefore, one of the main challenges of the project was the complex planning of the works to ensure that the site continued to operate so not to financially impact the heritage park. It was imperative that works were complete within an 8-week period with 17,500 visitors booked in for their annual Santa’s Grotto Experience Tour beginning in early December.The application speed of the catalyst cured Protec System, combined with communication between the contractor and the site to ensure unobtrusive installation, meant the centre stayed open and the tours running with minimum disruption.The benefits of using a fast-curing liquid waterproofing solution were also vital due to the ever-changing micro-climate in the Welsh valleys. On any single day, the weather would serve up anything from bright sunshine to windy, rainy conditions. Therefore, the fast-curing Protec System, combined with the flexibility of the installation team, who gave up weekends when required, ensured the project was finished on schedule. The works were completed to an extremely high standard with full encapsulation of the roof terrace areas and without a single detail being left exposed to the elements.ConclusionThe unique aspects of this project certainly kept the team on their toes. But they were determined to complete the project on time.The team worked tirelessly, even giving up their weekends to ensure that the project was completed on schedule. Despite the harsh Welsh weather, they pushed on and were determined to make sure that Santa could visit the children of the Welsh Valleys. It was a challenging project but the team’s hard work and dedication paid off.Finally, the project was completed and the results were astounding. The roof terraces are now fully waterproofed and refurbished, and the visual appearance of the visitor site was greatly improved. It was a project that was both memorable and rewarding to all those involved.
Sponsored
Emberton Park Caravan Site Choose Decimetric

Emberton Park Caravan Site Choose Decimetric

Anderson, GEC Ltd

Refurbishment of a campsite services facility at a popular country park provided an unusual testing ground for part of a new stainless steel kitchen furniture range developed for the professional catering sector. But after a full season’s camping at Emberton Country Park, the double bowl sinktop from GEC Anderson’s new Decimetric® range has met all expectations and is set for a long service life.Emberton Country Park, near Milton Keynes, was developed from disused gravel workings and is today an attractive parkland setting of 200 acres. It caters for a variety of uses and includes 58 pitches for tents and touring caravans, rally fields, lake and river fishing, a conservation area, children’s play areas, a shop and washroom/toilet facilities.As part of a major refurbishment of the services block for campers in the touring field, Milton Keynes Council’s Construction Services Department refitted the washroom where campers wash their crockery and cooking utensils. After another supplier was unable to deliver a suitable sinktop within the council’s timeframe, Robert Gritton, Project Manager for Milton Keynes Council, shopped around for a cost effective alternative – and became one of the first customers to order from the Decimetric® range. “GEC Anderson was able to custom make the sinktop in a very short time, and everyone has been very pleased with it. I’m very glad that the other make was not available,” he says. “The other big advantage of the Decimetric® product is that its 100mm modular size increments permit specification of the largest possible unit to fit a space, without the premium of a true bespoke installation.”The Decimetric® sinktop is extremely durable, but requires minimal maintenance. Park Manager David MacCarter says: “It’s really solid, well made and it will never wear out. The cleaners just give it a wipe over every day: it’s easy to keep clean and it looks great.”The 1,700 x 600mm sinktop of commercial grade stainless steel has a water-retaining 40mm lipped edge at the front and sides, and an 85mm sloping upstand at the back. The bowls are 400 x 400 x 250mm and positioned 100mm apart, centrally along the length of the sinktop. Both have 38mm outlets and two 30mm diameter tapholes at 200mm centres behind each bowl. The sinktop stands on square section stainless steel legs with adjustable feet. A solid stainless steel shelf is fitted under the sinktop. The new Decimetric® range from GEC Anderson offers a flexible and comprehensive selection of sinks, surfaces, support frames, cabinets and shelving. The range was developed mainly for the professional catering market, but its versatility, good looks and low maintenance requirements make it an excellent choice for applications requiring hard-wearing and hygienic surfaces. Decimetric® units are easy to specify and are offered in sizes from 500-3,000mm, with 100mm sizing increments (100mm = 1 decimetre). The modular approach makes for economy and short delivery times. Founded in England in 1962, GEC Anderson has pioneered the development of made-to-measure stainless steel products. Today, the company’s range includes bowls, worktops, cabinets, shelving and sanitaryware for use in domestic, commercial and specialist environments. All products are manufactured to ISO 9001 and backed by a comprehensive support service from planning and product specification to installation and maintenance.
Sponsored
x+why

x+why

Radii

Flexible workspace providers x+why’s new 33,000 sq ft location at 100 Embankment aims to provide “an impressive space from which to grow and thrive” for start-ups and established businesses across Manchester.Radii, working through our northern contracting office, joined John Robertson Architects and ADT Workplace in May 2023. Working across Ground, Mezz and 1st and 2nd Floors of the space, Radii’s popular single glazed Linear 25 (Rw 39 dB) and Linear 30 (Rw 41 dB) partitions and Hogan single and double pivoting doors (Rw 47 dB) were used for glazed fronts for a variety of different size meeting spaces and offices. Many of these were installed with our popular ‘Rio’ banding.Ei30 single glazed fire rated screens, complete with timber door frame junctions, provide exit route protection.The finished space also benefits from some of the 11 Ei60 FireTec double door sets installed across all eight levels of the building during the original base build Cat A fit out in 2020.
Sponsored
Sculptural Curves at One Blackfriars

Sculptural Curves at One Blackfriars

Armourcoat Ltd

Armourcoat’s Sculptural three-dimensional wall finish features in the ground floor foyer at One Blackfriars residential tower in London’s South Bank. The building designed by Simpson Haugh and Partners is a compelling architectural achievement, with a stunning arc of glass taking inspiration from Sarpaneva’s Lansetti II vase.Inside the building the curves continue with a vast, immaculate resident foyer and lift lobby by London based luxury interior design studio, Goddard Littlefair. With their signature quality and attention to detail it provides the feeling of a five-star hotel entrance. Armourcoat’s seamless ‘Fluted’ Sculptural design was specified by the studio for the flanking feature walls to provide a sense of scale and grandeur on entering the space.Armourcoat Sculptural wall designs are created using a combination of traditional hand sculpting and computer aided design to ensure total accuracy during installation whilst retaining the essence of hand crafting. The panels are mineral based and incorporate up to 30% post-consumer recycled content. They are non-toxic and completely non-combustible. Once the panels are installed, each design can be finished in a range of decorative surface finishes. Photography by Franklin & Franklin
Sponsored
Chiswell Street

Chiswell Street

Armourcoat Ltd

The recent refurbishment of 4 Chiswell Street by Ben Adams Architects includes Armourcoat’s Istria polished plaster wall finish. Situated close to the historic Bunhill cricket ground in Islington, this once tired office building has been re-imagined as a modern and open workspace.Entering through an impressive new façade and front entrance, the architect’s design includes a double height reception space bathed in natural light. A sculpturally fluted wall finished in Istria polished plaster and custom terrazzo floor continue a circular motif repeated throughout the design. With exposed services and stylish use of concrete colours, the structure has been transformed into a contemporary and relevant commercial building with a distinctive urban feel.Named after the characteristic building stone of Venice, the Istria polished plaster finish is made from a combination of slaked lime, recycled marble powder and special additives. The Istria finish is full of ingrained surface movement and creates a matt or honed stone appearance. Tonal variation and surface movement within the finish complements other natural materials including wood, stone and fabric.
Sponsored
Oval Village, Kennington, North London

Oval Village, Kennington, North London

Cemfloor Liquid Screeds

Oval VillageKennington North LondonScreed Supplied By: Capital ConcreteScreed Installer: The Progressive Group Ltd.Product Used: Cemfloor NH C25F5Berkeley Group is one of the UK’s leading developers and has won numerous awards for its commitment to quality, design and customer service.Oval Village, located next to the famous Surrey Cricket Grounds, and built on the old Gas Works, is a new luxury development of 1300 homes, along with Retail, Food, and Office spaces.As part of the project brief, there was a need to install a low depth flooring solution. Due to its high flexural strength Cemfloor NH provided the solution as it allowed a 40mm screed depth to be installed, without compromising onquality. Thanks to the pumpability of Cemfloor, Progressive Group were able to pump to height, and install the screed over 18 stories, with the material being pumped over a distance of 160 meters without any issues.The main advantage Cemfloor has over other flowing screeds is the quicker drying times, and that it can accept foot traffic after 24 / 48 hours, meaning that construction could continue quickly and efficiently to meet the projectdeadline.
Sponsored
Clement Conservation Rooflights chosen for Grade II listed unique landmark restoration project

Clement Conservation Rooflights chosen for Grade II listed unique landmark restoration project

Clement Windows Group

Stapehill Abbey is a unique estate of 45 two to five bedroom homes. Set within beautiful gardens and grounds, the recently converted Grade II listed refurbishment looks magnificent.The original Abbey House was built in the early 19th century, with the monastic buildings dating back to the 1840s. The twin chapels were designed by Charles Hansom in 1847 and the buildings were completed in 1851. Founded by a small group of nuns led by Madame Augustine de Chabannes, the Abbey was home to The Cross Abbey order of Cistercian Trappist nuns between 1802 and 1990.Dorset based developers Ankers and Rawlings worked painstakingly to retain the original artefacts and period features of this historical site. They chose over 60 Clement Conservation Rooflights for the project including both slate and tile profiles in sizes 1, 2, 3, 4 and 5.  Garry Hunter from Ankers and Rawlings said  “The homes at Stapehill Abbey have a mixture of slate and tile roofs, we chose Clement Conservation Rooflights as we needed a product that would look perfect in both. We are really delighted with end result and hope to use Clement rooflights again in the future”.
Sponsored
Waterproofing solution to Grade II Listed Commercial Structure

Waterproofing solution to Grade II Listed Commercial Structure

Delta Membrane Systems Ltd

The brief for this project was to design, supply and install a bespoke and sympathetic waterproofing solution to a Grade II listed, commercial structure with an impractical damp basement.Delta Registered Installers, MacLennan Waterproofing worked closely with the Principal Contractor, HB Projects to achieve a Grade 3 habitable space whilst preserving this historic structure.The Co-op shop in Petworth Village, provides the local community with everything they need, whether its household essentials or a place to meet friends.The site incorporates two Listed Buildings, including part of a Listed Church. The store applied for listed building consent to reconfigure its ground and basement floors, to increase the retail floor space and improve the functionality of the store.When designing a waterproofing/damp proofing solution in a historic building or a structure of architectural interest, additional design considerations should be employed during the design stage to maintain preserve aesthetic and structural integrity of the structure/building. The waterproofing design should be sympathetic in application whilst offering a robust solution.Care consideration should be applied when specifying products to ensure they are ideally suited for meeting the complexities of listed building requirements.
Sponsored
Damp Remedial Solutions

Damp Remedial Solutions

Delta Membrane Systems Ltd

Chepstow is a beautiful town and community in Monmouthshire, Wales. Located on the tidal River Wye, roughly 2 miles before the confluence of the River Severn. Steeped in history, Chepstow’s Great Tower keep was commissioned by William the Conqueror following the Battle of Hastings.With high ceilings and spaces which feel luxurious there is simply something that draws us towards the vast expanse of space and the warmth offered by listing buildings such as converted barns and farmhouses, often because of their idyllic rural locations.Delta Registered Installers, Tywi Damp Proofing were commissioned with the sympathetic conversion of an old farmhouse located in Chepstow. The project scope was to convert 1 listed farmhouse into 5 separate dwellings.Original features, such as 5ft thick walls were embraced in this conversion project.During initial inspections, penetrating damp was found. Penetrating damp is often referred to as lateral damp, which is the development of moisture through walls, roofs or any ground area of a structure. If left untreated this penetrating damp will cause problems for the structure envelope and can lead to significant damage to the fabric. Penetrating damp can be caused by a combination of problems such as the structure’s age, construction and exposed location.
Sponsored
Old Woking Retirement Home - Ventilation and Screening Louvres

Old Woking Retirement Home - Ventilation and Screening Louvres

Maple Façades

A new project in Woking showcases the many benefits of Maple’s new Pluto louvred screening system.Designed to hide unsightly HVAC machinery on the roof of a new four-storey independent living development, the system is lighter and easier to install than traditional systems.   It’s perfect for the rooftop location. Seen from the ground, it’s a sleek bank of aluminium louvres – but the modular system also means that installation is safer, with time spent working at height kept to a minimum.  Maple’s Pluto system fixes easily to the building sub-frame using galvanised steel brackets, while an advanced sub-structure of posts, mullions and rails in high grade aluminium will provide hidden support for the 100mm louvre blades.  Despite a practical function of hiding equipment, pipes and ducting, the screening will not detract from the clean lines of the building, which are complemented by a bank of curved louvres (also supplied and installed by Maple) on the west elevation of the building.  The project is a collaboration between Maple, Willmott Dixon, HNW Architects and Woking Borough Council. When complete, the four-storey development will provide a mix of 48 one- and two-bed flats, which will provide independent (but supported) living.

Showing 1765-1800 of 1905

Feedback