Lateral Bellows for Airport
Expansion

Lateral Bellows for Airport Expansion

FlexEJ

FlexEJ has designed and manufactured lateral expansion joints with Inconel 625 bellows designed to install in existing pre-cast concrete forms.The London City Airport terminal expansion is being built on a concrete deck supported on over 1000 piles. Between the sections of the deck there can be movement and where critical services pass between sections a fully enclosed expansion joint is required.INSTALLATIONDesigning the expansion joints for installation at site into the existing concrete sections was a challenge. FlexEJ designed and supplied installation tooling which allowed the expansion joint to be inserted into the concrete from one side – complete with internal removable pre-extension bars – and then finally seal welded.FURTHER DETAILSIf you are interested in finding out more about our expansion joint design and manufacturing capabilities, or if you have enquiries for utility related projects, please contact our Technical Sales Team on +44 (0) 1384 881188 or send an email to sales@flexej.co.uk.
Sponsored
Streetscape® High Strength Bedding Concrete | supplied to Vinci Construction UK | £350million Stoke-on-Trent Bus Station  | SMET Case Studies

Streetscape® High Strength Bedding Concrete | supplied to Vinci Construction UK | £350million Stoke-on-Trent Bus Station | SMET Case Studies

SMET Building Products Ltd

In partnership with Vinci Construction UK, we supplied BS 7533 compliant bedding course, jointing and priming mortars for the £350million Stoke-on-Trent City Council City Sentral redevelopment, comprising 3,500m2 of natural stone paving. The project was installed in the state-of-the-art new bus station designed by Grimshaw Architects and will form an impressive gateway into the city. The SMET Streetscape® portfolio complies with the rigorous requirements of BS 7533 with all products undergoing independent testing and certification to confirm compliance. By providing a superior level of customer service and focused aftercare to our Smet Supported Partners with the Streetscape® brand, we demonstrate best-practice in Streetscape Hardscaping construction partnerships. Click for more detailed information on the SMET Streetscape® BS 7533 range:https://www.smetbuildingproducts.com/products/streetscape/Click for more on some of the projects we have supplied to:https://www.smetbuildingproducts.com/projects/by-product/streetscape-high-strength-bedding-concrete/Contact SMET for any Streetscape enquiries.
Sponsored
Emseal SJS System Seals the structural deck movement joints on the new White-Link Ferry and Ro-Ro Terminal in Portsmouth

Emseal SJS System Seals the structural deck movement joints on the new White-Link Ferry and Ro-Ro Terminal in Portsmouth

NCC – Emseal Movement Joints

Client: Whitelink Ltd Contractor: Floor & Wall Ltd Main Products Used: Emseal SJS SystemWhitelink is the leading ferry operator across the Solent from the mainland to the Isle of Wight and carries more than 5 million passengers a year. Their Portsmouth car ferry terminal in Gun Wharf has benefited from White-link’s £45m investment programme to upgrade the facilities, with new double deck parking and boarding ramps. The wide deck and ramp joints needed to be designed to safely accommodate high levels of movement from the combination of thermal and direct frequent traffic loadings, with simultaneous exposure to the marine environment, as well as maintaining watertightness to protect the structure. The engineers knew that selecting the right expansion joint system was going to be critical to the success of the project and their evaluation showed the Emseal SJS System was the best solution. Unlike most trafficable expansion joint systems, the Emseal SJS solution was extremely cost effective, required no potentially damaging mechanical fixings and with installation from the top side only, therefore the works could continue with minimal disruption to ongoing ferry services and the normal White-link customer experience.
Sponsored
Wakefield’s New £3.76m State of the art Fire Station

Wakefield’s New £3.76m State of the art Fire Station

Naylor Concrete Products Ltd

The fire station is relocating from Dale Street, Ossett, to nearer Wakefield city centre as part of West Yorkshire Fire and Rescue Authority's Integrated Risk Management Plan and replaces the current near Ossett town centre. The new location will enable crews to support the Combined Aerial Rescue Pump based in Wakefield. Coun Tracey Austin, West Yorkshire Fire and Rescue Service vice chairwoman, carried out the ground breaking ceremony. She said: "This marks the start of a very exciting project in Wakefield district and I am looking forward to seeing the new station taking shape.”
Sponsored
Kenwood Warehouse - Concrete floor repairs, for heavy traffic areas

Kenwood Warehouse - Concrete floor repairs, for heavy traffic areas

Watco UK Ltd

Project detailsKenwood, a kitchen appliance manufacturer in Hampshire was suffering with dusty floors and wanted to improve the visual appearance of the warehouse area. Kenwood contacted Watco because they had come to trust our products, having used them over many years. We suggested not only the most suitable repair products and floor coatings but a trusted and experienced flooring specialist to apply the products, Aedean Flooring Ltd in Farnborough, Hampshire.Our solution The floor was shot blasted and lightly ground before being repaired with Watco Concrex® Carbon Fibre, an incredibly strong epoxy resin repair mortar and Watco Flowpatch®, a pourable patch repair material for heavily trafficked floors. Aedean suggested the use of colour inside the aisles, which Kenwood thought was a good idea as it would making identifying each aisle easier. Epoxy Gloss Coat in mid grey was used in the main walkways in the warehouse so that the area could be back in use quickly after coating. The colours chosen for the aisles were: Safety Yellow, Signal Red, Royal Blue and Black. Epoxy Gloss Coat is an extremely tough and decorative industrial floor coating which is ideal in situations where durability is important. "We are delighted with the outcome which completely revitalised the appearance of the warehouse, protecting the floor for many years to come."
Sponsored
Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

C-Probe Systems

Challenge: C-Probe's LoCem® +chase® anode mortar has been installed at the Omni Shopping Centre Car Park in Edinburgh, Scotland to 4 levels of underground car parking as part of a comprehensive corrosion management strategy. Overtime the popular car park had succumbed to structural damage and corrosion caused by the ingress of chlorides from de-icing salts from above.Solution: This system comprised of 42 ICCP zones and 7 additional monitoring zones forlevels protected using surface-applied corrosion inhibitors. In addition to this, some 6000 C-Puck galvanic anodes were used to protect newly repaired areas to 2 levels. All the anodes and monitoring could be controlled and data accessed remotely throughoutthe car park with AchillesICP and AchillesIES, helping to extend its service life for 100+ years.Outcome: This ESG compliant approach meant there was no need for demolition or extensive reconstruction using new materials, helping to reduce waste and harmful emissions. Reconstruction was also a near-impossible strategy due to underground facility and electric tram on land, meaning something non-invasive like cathodic protection was essentialto minimise social disruption. 
Sponsored
London Aquatic Centre - Olympic Pool

London Aquatic Centre - Olympic Pool

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

866,000 tiles were fixed in the London Aquatics Centre, which formed the gateway to the Olympic Park. Products used: ARDEX WPC Waterproof Protection System, ARDEX S 7 Flexible Waterproof Coating for Floors and Walls, ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar, ARDEX X 77 MICROTEC Flexible Wall & Floor Tile Adhesive, ARDEX-FLEX FL Rapid Setting Flexible Tile Grout for Wide Joints.
Sponsored
Cut Edge Corrosion Treatment, Hamilton, Scotland

Cut Edge Corrosion Treatment, Hamilton, Scotland

Liquasil Ltd

The roof of this bingo hall in Hamilton, Scotland was affected by cut edge corrosion. Liquasil's Flexlap cut edge corrosion treatment was specified to solve the problem. All surfaces were first prepared using wire brushes to remove any delaminating finishes, before being prepared with the Liquasil Corrosion primer. Once the primer had cured, the Flexlap hardened silicone top coat was applied to provide a moss and lichen resistant finish, offering 10+ years protection, all backed by Liquasil’s unique, Latent Defects Insurance Warranty.
Sponsored
Naylor Lintels Part of Westfield Bradford Broadway Shopping Centre

Naylor Lintels Part of Westfield Bradford Broadway Shopping Centre

Naylor Concrete Products Ltd

Westfield, the world's largest shopping centre developer and Meyer Bergman, pan-European retail real estate investor opened their latest shopping centre in Bradford in 2015. Renowned for their iconic shopping centres in major cities around the globe, Westfield offers the very best in high fashion and leisure. Confirmed tenants in the 570,000 sq ft scheme include Debenhams, Marks and Spencer, Next, Topshop, Topman, Sainsbury's plus many more. Bradford has a catchment of almost one million consumers with a weighted annual spend potential of £623 million.
Sponsored
Naylor Lintels used in construction of new Coronation Street set

Naylor Lintels used in construction of new Coronation Street set

Naylor Concrete Products Ltd

Soap chiefs have moved Weatherfield from Manchester to nearby Salford so they have more space for filming. Builders have recreated The Rovers Return, The Kabin and Dev’s corner shop as well as the characters’ homes down to every minute detail. Builders laid about 11,000 cobbles, 190,000 bricks of different types and used seven colours of mortar so it looks realistic. The new set is full size so two cars will be able to pass each other on the Street. Broughton Brickwork used Naylor lintels whilst building the Coronation Street lots.
Sponsored
London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

Sherwin-Williams

Sherwn-Williams demonstrated what technical assistance can be provided on projects before any quotations or specifications are organised. A low viscosity primer Resutop Binder was recommended as a penetrating primer to case harden and consolidate the screed. Epoxy screed repairs were installed where required to make good any damaged areas. Once a sound substrate was established Resuprime MVT moisture tolerant primer was installed incorporating a fabric mesh over all joints and pitted areas to reduce any potential cracking of this substrate, followed by 9mm thick FasTop RS69 polyurtehane screed.
Sponsored
The Little Chapel

The Little Chapel

Polyroof Products Ltd

The Little Chapel in Guernsey was built in 1914 and, at only 16 feet by 9 feet, is said to be “one of the smallest functioning chapels in Europe, if not the world”. The chapel and its unique appeal gained national fame after an article accompanied with a colour photograph was published in the Daily Mirror, and it has since been considered one of, if not the most famous tourist attraction in Guernsey.In 2015, work began to weatherproof the intricate building, with the Protec System specified as the best solution for the job.The ChallengeHaving never been finished by its original builder, Brother Déodat, the chapel has been undergoing a long-term restoration project to create a structurally sound building that retains the beauty of the original vision. Firstly, the foundations were underpinned and properly secured for the first time since they were created over 100 years ago. The next priority was to fix the roof, as described by Pat Johnson, chairman of the Little Chapel Foundation:“The asphalt on the roof was hollow and had to be taken off. The concrete underneath was hollow. We ended up with a substrate of soil and clink, so to repair it we had to go inside and grout all the cracks in the ceiling. [The new roof] comprises three layers of concrete, 340 stainless-steel plugs, a stainless-steel mesh and a final coating of concrete”.The task of making the new concrete surface waterproof fell to local Polyroof approved contractor Sarnian Roofing Ltd. Andy Gavey (Company Director) said about the project:“As a boy I would regularly visit The Little Chapel and I’ve always been blown away by its beauty and character. To get the chance to help restore the building to its full potential is a dream come true for me – this has to be my favourite roofing project yet. Polyroof’s contribution towards the roofing works has meant that we were able to provide a top-quality roofing solution that has done justice to the amazing exterior of the building.”The SolutionWith its ability to be applied directly to the concrete to form a lightweight, seamless and durable waterproofing membrane, Polyroof’s Protec System was a clear choice for waterproofing the chapel roof.The first stage was to make the entire roof area fully watertight. Following a coating of primer to seal the porous concrete surface, the first coat of Protec was applied which incorporated fibreglass reinforcement. After 30 minutes the coating had cured and the second coat was applied to the whole roof area. To areas where new mortar was laid to re-embed the pebbles and seashells, which had been painstakingly removed from the old roof, a coating of Polyfinish was applied to provide extra protection.The architect chose a sanded decorative finish to complement the exterior of the building, which is covered in a mosaic made from seashells, pebbles and broken china. To create this finish, a third coat of Protec was applied and, whilst still wet, Quartz Sand was broadcast into the resin. After brushing off the excess sand, the whole roof surface was sealed with an application of Polyfinish Clear.
Sponsored
Waterproofing Crossrail Deep Underground with Preprufe®

Waterproofing Crossrail Deep Underground with Preprufe®

GCP Applied Technologies

Reaching depths of more than 30 metres beneath the streets of London, Crossrail Stations required unique solutions to ensure water tightness. GCP Applied Technologies, a leading supplier on some of the major stations including Canary Wharf, Whitechapel, Liverpool Street, Moorgate, Farringdon, Tottenham Court Road and Bond Street, reached into an extensive portfolio of high performing and easy to install Preprufe® waterproofing products to solve challenges presented by each station. Composed of durable HDPE, the Preprufe® waterproofing membrane adheres directly to concrete with Advanced Bond Technology™ to form an impermeable seal. Find out more from gcpat.com.
Sponsored
MG100 Art & Heritage Training Space - Single Point Movable Acoustic Wall

MG100 Art & Heritage Training Space - Single Point Movable Acoustic Wall

ModernGlide Ltd

The ModernGlide MG100 Top Hung Movable Acoustic Wall provides seamless room dividing options and is ideal for dividing your interior space.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam or concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmFull height or inset pass door optionsSemi-electric top and bottom seal optionsStacking via single and double point suspensionFinishes include melamine, laminate, veneer, magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
Auditorium Hall - MG100 4-12 mtr High Top Hung Movable Acoustic Wall

Auditorium Hall - MG100 4-12 mtr High Top Hung Movable Acoustic Wall

ModernGlide Ltd

The ModernGlide MG100 Top Hung Acoustic Wall is ideal for large auditorium spaces and halls where room heights can be up to 12 mtrs high.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam on concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmInset pass door optionsSemi-electric top and bottom seal optionsStacking via single and double point suspensionFinishes include melamine, laminate, veneer, magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
Generali - Warsaw, Poland - Northward Bound, Colour Compositions, Nordic Stories, Poise, Polished Concrete (LVT)

Generali - Warsaw, Poland - Northward Bound, Colour Compositions, Nordic Stories, Poise, Polished Concrete (LVT)

Milliken

When this Italian insurance giant was refurbishing its Polish headquarters, they chose five Milliken floor covering products for its circulation, office and conference spaces. Chosen for their aesthetics and performance, the carpet and LVT products make an important contribution to the well-being of Generali employees working in this destination workspace.
Sponsored
Meeting Room - MG100 Top Hung Double Point Suspension

Meeting Room - MG100 Top Hung Double Point Suspension

ModernGlide Ltd

The ModernGlide MG100 Top Hung Double Point Movable Acoustic Wall provides seamless room dividing options and is ideal for separating meeting room space.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam on concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmFull height or inset pass door optionsSemi-electric top and bottom seal optionsVersatile stacking via double point suspensionFinishes include melamine, laminate, veneer and magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
Queens Crescent, London

Queens Crescent, London

Polyroof Products Ltd

Queens Crescent is a bustling retail street situated in London’s Kentish Town. The roof area above the Post Office building, which also served as a communal walkway area with access to the upper level of the adjacent buildings, had been suffering from leaks. To add to the issues, the aged promenade tiles had worn and become a slip hazard when trafficked. Looking for a lasting waterproof solution that can also provide heavy duty anti-slip surfacing, the client turned to Polyroof for a solution. To minimise access disruption to the upper level adjacent buildings, the client had organised a 5-day window for the waterproofing and surfacing works to be completed.The SolutionThe main contractor had removed the old paving slabs and membrane back to the concrete deck underneath and carried out repairs to create a level surface.Approved Polyroof Contractor Emperor Roofing began by priming the concrete surface to create a sealed, non-porous substrate. With its quick-curing properties, the Polyroof primer was ready to be over-coated only 30 minutes after its installation.A specialist twin-pack epoxy metallic primer was applied to metal detailing sections, including ducting vents and the intricate balustrade detail alongside the communal stairwell, which also formed part of the specified works.Local reinforcements were carried out to these details involving taking Protec resin and PolyMat 450 up by 150mm before applying the full waterproofing system.Upon completion, the balustrades were re-painted, with the paint being taken over the waterproofing membrane to create a neat detail. A key advantage of liquid systems in general is their ability to seamlessly seal around complex detailing; in this instance, quite simply, the balustrades could not have been sealed effectively using a traditional waterproofing technology.Polyroof’s Protec System enjoys exceptionally fast detailing speeds, where its formulation allows it to rapidly break down the chopped strand mat reinforcement and neatly moulds around the detail it is covering. To the left of the stairwell, the Protec system was chased in at a height of 150mm above the level of the stairs.The termination point of the waterproofing membrane was sealed with mastic to create a fully weatherproof detail. The Protec system was dressed onto the wall abutments to the main areas but left self-terminated as new render is to be applied to the walls and taken down over the top of the Protec system.After local reinforcements were completed the main waterproofing system was applied to the walkway and stair areas.The two-coat Protec system was able to be rapidly installed with its 30-60 minutes cure times, meaning the project was comfortably ahead of schedule by the time it was complete.Next, the designated anti-slip areas were carefully masked off, leaving the exposed waterproofing to the roof perimeters, detailing and vertical sides of the step and stairs. A third coat of Protec was applied to the masked sections and, whilst the liquid was still wet, 0.7-1.2mm quartz sand aggregate was broadcast into the resin.Once dried, the aggregate is embedded within the membrane and lose sand was brushed off and collected to be re-used. In order to provide an extra-tough surface that sealed that aggregate in place, a coating of PolyFinish was applied over the aggregate in the client’s choice of light grey.
Sponsored
Regent Hotel

Regent Hotel

Lorient

This 5-star luxury hotel needed high-performance acoustic sealing systems as part of a refurbishment programme for a number of different doorsets. Our highly regarded Batwing® perimeter seal, LAS8001 si drop seal, LAS3004 si door bottom seal and LAS7005 si perimeter seal were used throughout the refurbishment.
Sponsored
Grand Lisboa Palace

Grand Lisboa Palace

Lorient

Grand Lisboa Palace is a $5 billion development in Macau,China, with 1,900 guest rooms and suites in the GrandLisboa Palace Hotel, Palazzo Versace Macau, and KarlLagerfeld Hotel. Lorient supplied a combination of AURA® AAS8501 dropseals, Batwing®, FirtreeTM and LAS7001 perimeter seals,LAS3006 door bottom seals, LAS6002 magnetic seals andRP2004 fire seals.
Sponsored
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

NCC – Emseal Movement Joints

Client: Canary Wharf Group Consultant: Adamson Associates Architects Main Contractor: Kilnbridge Construction Ltd Main Products Used: Emseal DFR-2 SystemsWood Wharf Development is certified as a BREEAM Outstanding rated, sustainable mixed-use development that covers a 23-acre site. It consists of 6 individually designed building structures that provide 2 million square feet of curated workspaces and offices, more than 3,500 new residential homes and 500,000 square feet of retail space. The site is being developed as a new 5G and Wi-Fi-6 enabled, London District to include more than 9 acres of interconnected riverside leisure space with boardwalks, squares, and parks to create an oasis of urban green space. The new multistory building structures were designed with 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. These joints also had to minimise any noise transmission through the floors and provide a minimum of 2-hours fire resistance, which is a key reason the consultants selected the Emshield DFR-2 System as it could easily meet all these stringent requirements. In fact the innovative Emshield DFR-2 System can accommodate more than 100% joint movement capability and is CE Marked to EN-1366-4 for up to 4 hrs fire resistance. This unique Emseal solution also has the advantages of not requiring any potentially damaging mechanical fixings into the structure, as it is easily bonded into the joint, with access only required from above. 
Sponsored
Larsen x Midland Metropolitan University Hospital

Larsen x Midland Metropolitan University Hospital

Larsen Building Products

Midland Metropolitan University Hospital Case StudyDemonstrating Products That Perform!Project Description:Nestled between Sandwell and West Birmingham, the Midland Metropolitan University Hospital is poised to become the centre of acute and emergency care at our Trust when it opens in 2024.Midland Met is not just a hospital...situated within a designated regeneration zone, this new hospital build represents not just progress in healthcare but opportunity to revitalise the region. Product Showcase:Used in multiple locations across the project including Level 5 Winter Garden, Larsen Streetscape paving mortar system is a collection of high-performance mortars for the construction of pavements. The preferred option for laying paving, the products are specifically formulated to exceed performance characteristics, as set out in BS 7533. Products used:         FBC Eco Fine Bedding Concrete • Ideal for pavements constructed with natural stone, concrete & clay paving units.PS Eco Priming Slurry• Applied to the underside of all paving units to create an exceptional bond to FBC Eco Fine Bedding Concrete.FJM Eco Flowable Jointing Mortar• Filled the joints to complete the installation. Rapid setting with high early strength gain, FJM Eco can be opened to foot traffic in one hour.3 in 1 Seal Plus• A water-based acrylic hybrid dispersion paving sealer, sand stabiliser and protector suitable for most paving. For further information or technical data sheets on the Larsen Streetscape product range, please visit www.larsenbuildingproducts.com. 
Sponsored
Battersea Power Station

Battersea Power Station

Lorient

Lorient supplied LAS8001 si drop seals with bespoke 'Battersea bronze' end caps, Batwing® perimeter seals, Finesse™ acoustic, smoke and fire seals, and lock and latch protection kits to the residential project.
Sponsored
Emseal Colorseal celebrates 3 decades of successfully sealing wide expansion joints between the original building and its 10-story extension added back in 1992 at the Guggenheim Museum in NYC

Emseal Colorseal celebrates 3 decades of successfully sealing wide expansion joints between the original building and its 10-story extension added back in 1992 at the Guggenheim Museum in NYC

NCC – Emseal Movement Joints

Client: Solomon R. Guggenheim Foundation Architects & Engineers: Thelwell Gwathmey Siegal Kaufman (concept by Wright in 1951) Main Emseal Products Used: Emseal Colorseal is on Permanent Exhibition at this Landmark Museum following a hugely successful 24- year ‘run’ at the Guggenheim in New York City. Twenty-four years ago Emseal Colorseal system was installed between a neighbouring building and the 10-story Guggenheim museum office extension completed in 1992; it is clearly still as resilient and watertight as the day it was put in. Where’s the Emseal Colorseal? - The joint is between the limestone-faced building extension on the left of Frank Lloyd Wright’s iconic original and the darker neighbouring brick building to its left. For most designers expansion joints are a necessary evil – and ‘Evil’ for their disruption of design aesthetics – although when cleverly positioned, as in this case returned and rebated slightly back from the building face, the joint becomes a part of the shadow line. From just 2-3m away the joint remains essentially an insignificant 'shadow-line', and back in 1992 it was colour matched with the limestone façade as seen when viewed close-up. Today in 2022, the Emseal Colorseal joints are still fully intact and securely non-invasively bonded in position on both sides of the joint. The material is resilient and responsive, the stored energy of pre-compression remains very evident and there are no signs at all that the material is starting to degrade in the joints, even after this length of service in the exposed environment of NYC in Manhattan.
Sponsored
Axis Madrid

Axis Madrid

EFFISUS

The property, that has been renamed Axis, has four floors and an amazing facade, composed by a structure of beams and supports that cross diagonally. A feature that allows to minimize energy costs, because of the large stainless steel and glass cube that uses the latest technologies to combine a transparent facade with an outer mesh. Effisus Ecofacade SA Edge membranes were used on this project for sealing facade connections. Effisus Pre-Fab True Seal, a pre-fabricated sealing solution, was developed and applied for sealing difficult facade 3D details, minimizing human error possibility.
Sponsored
Dubai Opera

Dubai Opera

Lorient

Dubai Opera is one of the most significant, vibrant and successful performing arts and entertainment centres in the Middle East.The 2,000 seat, multi-format theatre has been captivating its visitors since 2016.Lorient’s high-performance acoustic seals; LAS8001 si drop seals & LAS1212 Batwing® acoustic & smoke seals were specified for this prestigious project.
Sponsored
School Heating Renovation

School Heating Renovation

Kompozit'All UK

application area: commercial gas heatinguse type: condensing gas boilersproject scope: line commercial freestanding chimney for condensing operationadded value: corrosion-resistant, air-tight and waterproof finishBackgroundThe combustion gases from the school's boiler room are exhausted through a freestanding 28-metre brick chimney. The structure was not suitable for the wet operation of condensing boilers. FuranFlex-25 Black was the chosen lining material.The new boiler plant required a 500mm diameter flue liner but the chimney could not accommodate a rigid liner this size. A FuranFlex25 Black liner was therefore specified as it expands into the rectangular flue shape when inflated with steam.Statement of workFuranFlex25 comes as a folded and soft tube. Inflating with steam irreversably hardens the liner fixing it in place. Within a few hours of steaming the liner was ready for connecting to the boilers. The appropriate adaptors/terminals were fitted making the chimney ready for operation.
Sponsored
Home Gas Fire Conversion

Home Gas Fire Conversion

Kompozit'All UK

application area: domestic heatinguse type: gas fireplace project scope: restore fireplaces, rebuild chimney, line chimney ductadded value: 25-year guarantee on liner, quick and clean install, non-destructiveBackgroundThe camera survey revealed cracks in the chimney flue of a large victorian house in Muswell Hill. To protect against carbon monoxide leaks, the chimneys had to be lined before the gas fireplaces could be fitted. A flexible and uninflated FuranFlex tube was placed inside the chimney duct. Each FuranFlex liner is produced to fit the dimensions of the duct. Hot steam is used to inflate and harden the liner, fixing it in position.Statement of workThe installation took one day per chimney. The jointless and air-tight liner provides good draught and a clean and safe operation for the fireplaces. When FuranFlex liners are inflated they take up the shape of the chimney, providing maximum lined diameter and natural draught.
Sponsored
Thermally Broken, Glazed, Sliding Hatch

Thermally Broken, Glazed, Sliding Hatch

Surespan

The new thermally broken sliding roof hatch opens horizontally on fixed or telescopic rails. The hatch features the following key points: Thermally Broken Lid & Upstand Fixed or Telescopic Rails ‘Lift-Off’ Unseated Opening, ensures the hatch is sealed and secure when closed. Self Sealing Double Seals 0.43 W/m²K U-value Perfect for manual operation, the sliding cover easily and smoothly opens. Brush seals around the front and side ensure that no roof debris can interfere with the mechanism and the external fixed rail provides enhanced support for larger sliding covers.
Sponsored
HODGSON SEALANTS BRINGS MANCHESTER TOWN HALL WINDOWS TO LIFE

HODGSON SEALANTS BRINGS MANCHESTER TOWN HALL WINDOWS TO LIFE

Hodgson Sealants

As part of the multi-million-pound restoration of Grade I listed Manchester Town Hall, window restoration specialist Shepley Engineers is restoring, refurbishing, repairing and replacing hundreds of historic leaded and metal casement windows throughout the site using Hodgson Sealants Metal Casement Putty and Leaded Lite Cement. Each piece of glass from the iron-framed leaded lite windows from the state rooms has been removed, cleaned, repaired – or replaced by new fabrications if necessary – and reinstated using Hodgson’s Leaded Lite Cement in Shepley’s on-site restoration studio. The metal casement windows on the lower floors have been removed to Sheffield for restoration using Hodgson’s Metal Casement Putty, a high quality, hand-applied glazing compound that is formulated or bedding and external fronting of single glass into primed steel, timber frames, sealed hardwood and concrete. It is designed to be overpainted as in this project.
Sponsored
Fulwith Mill

Fulwith Mill

Fosroc International Limited

THE PROJECTFulwith Mill in Harrogate is located in an exclusive upmarket area – so much in fact, in 2019 Fulwith Mill Lane was named by Zoopla as the most expensive road in Yorkshire. For this new build project, Fosroc were asked to specify suitable products for the waterproofing aspect of the basement construction. The main challenges included a high water table, high clay concentration in surrounding area leading to a perched water table, and potential for hydrostatic pressure against the basement construction. Howard Civil Engineering was the main contractor for the project, with Fosroc being selected as materials supplier due to a long standing relationship between the companies, and a number of previous deployments.THE SOLUTIONFully bonded Proofex Engage membrane was used on the basement slab, combined with Supercast Watertight Concrete Powder (WCP) to provide a high level of resilience to both water ingress and potential defects. Supercast WCP is a concrete admixture that reduces porosity and permeability, increasing water and corrosion resistance. The vertical elements were cast in Supercast WCP with Proofex 3000, to provide a greater degree of flexibility to enable the contractor to install effectively in the tight spaces around the site, and around the complex shape of the structure. Proofex 3000 is a cold applied, highly flexible waterproof membrane – ideal for application of membrane around intricate building features.THE BENEFITSThe products specified for this project provided multi-layered and seamless protection to the underground element of this exclusive residence to meet stringent BS8102 Type A waterproofing standards. Proofex Engage provides water, water-vapour and gas protection to water excluding structures such as basements, and protects concrete from aggressive ground salts, chemicals and hydrocarbons. It is supplied with a self-adhesive strip on one side of the roll to provide sealed laps and comes with a range of auxillary products (for this project, Supercast SW20 Hydrophillic Waterstop) to form a complete waterproofing solution and simplify application for the contractor. Its unique mesh system bonds permanently to concrete, remaining in pace even if settlement takes place – the exceptionally high bond strength of Proofex Engage - 2.96kN, sets it apart from the competition, at 70% stronger than the leading chemically bonded membrane.
Sponsored
University of Macau

University of Macau

Lorient

The University of Macau campus in China is separated from the Taipa island by a river. The campus has more than 60 buildings and entrance can be accessed through an underwater tunnel. The campus was designed by He Jingtang, an architect and member of the Chinese Academy of Engineering. Lorient supplied a combination of AURA® AAS8501 drop seals and AAS4504 threshold plates, LAS3002 si door bottom seals and LAS1025 compression seals.
Sponsored
Science Park

Science Park

Lorient

The Hong Kong Science Park is a living laboratory where innovative technologies are tested and applied, and valuable data and feedback are collected to enable future innovation. It is also piloted as a smart region to further Hong Kong’s Smart City vision. Lorient supplied high performance acoustic sealing solutions to over 2000 doors; combining LAS8001 si drop seals, Batwing® and Firtree® acoustic and smoke seals.
Sponsored
Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester

Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester

NCC – Emseal Movement Joints

Client: Manchester Airport Group Architect: Pascall Watson Consulting Engineer: Burro Happold Main Contractor: Laing O’Rourke Specialist Contractor: Thelwell Flooring Main Products Used: Emseal SJS System and Emshield DSMThis new 9-storey car park with 3,800 spaces, was built as part of the £1 billion Terminal-2 redevelopment for Manchester Airport Group (MAG). To save time and space on site, the consultants used an innovative design, with a hybrid combination of steel delta beams and precast concrete, then on site the hollow-core precast floor slabs were topped with a 100mm thick reinforced concrete screed. To fully accommodate the anticipated levels of thermal movement and loadings in service, the engineers incorporated wide, high movement capability, structural expansion joints across the parking decks, between the different sections of the building. Given the dimensions of the deck joints (100mm) and the high movement capability required (100% = +/- 50%), with simultaneous exposure to the elements whilst under frequent heavy traffic, the joint sealing solution could only be specified as the Emseal SJS System. This unique structural expansion joint system easily accommodates high levels of movement in more than one plane, plus it has an integral coverplate to provide protection of the central movement section and the joint arrises. Importantly, the Emseal SJS is bonded into position with a structural epoxy adhesive from above, therefore requiring no access from below and enabling other works (e.g. M&E cable works etc.) to continue, plus as it is fully bonded, the SJS system requires no potentially damaging drilling into sound concrete to install mechanical fixings. In less trafficked wide joints at the perimeter, the Emseal DSM System was used, as a cover plate was not necessary.
Sponsored
Braefoot Jetty - Fife, Scotland

Braefoot Jetty - Fife, Scotland

Saint-Gobain Weber

Located between St. David's and Aberdour, the tanker terminal at Braefoot Bay is a base for the export of liquefied petroleum gas. The terminal consists of two jetties located on the north shore of Incholm Island. The gas is piped to the Mossmoran Plant in Fife direct from the North Sea, broken down to form ethane and then converted into ethylene, the basic hydrocarbon 'building block' of the petrochemical industry. The products are then piped the final three mile journey to the Braefoot Marine Terminal where they are fed into tankers and gas carriers for markets in Europe and the USA. The terminal is operated jointly by Shell Expro and Exxon.The jetty was suffering from increasing levels of deterioration of the reinforced concrete structure due to the relentless corrosive action of the marine salt environment on the reinforcing steel. A remedial plan was developed to carry out repairs and to introduce a cathodic protection (CP) system to greatly enhance the protection level and therefore extend the life of the structure. The plan was prepared by structural engineers from Shell, led by Hans Verheyde, and Balfour Beatty Construction Services UK (BBCS) was awarded the contract.Two major factors had to be accommodated within the repair programme. Firstly, the tidal flow that submerged the lower part of the jetty twice every 24 hours and secondly, the jetty is a fully live and very active transport hub and shipping schedules had to take precedence at all times. Round-the-clock flexible working maintained delivery of the twelve-month project.Saint-Gobain Weber's specialised repair concrete products were specified for the remedial actions on the Braefoot Bay jetty and technical application advice was provided for the active phase of the project. A suspended scaffold was designed and installed which allowed fast access when the tide ebbed so that productivity could be maintained. Traditional techniques were used to breakout the spalled and cracked concrete and to wash out the surface chlorides and clean the existing reinforcement steels.webercem five star repair concrete CP is a shrinkage-compensated, high strength, low resistivity, flowing repair concrete designed for use in conjunction with CP systems. This pre-blended cementitious concrete fully complies with the Highways Agency Specification Class 29F for high-strength flowing concrete for major structural repairs. It contains non-reactive aggregates with a low soluble-alkali cement content which is particularly important where CP is to be used. The rapid strength development and dimensional stability of webercem five star repair concrete CP – which reaches 27N/mm² in 24 hours – was especially valuable in the tidal conditions in Fife. Tight shuttering was used on the wide beam sections of the jetty to take the poured concrete which reached an integral bond with the original concrete. This process reformed the structural integrity using products with proven durability.An innovative CP system using Duogard® hybrid anodes from CPT was installed to protect the steel reinforcement with the anodes fixed into the soffits with a special CPT mortar. Where the CP installation required chases to carry the cabling, webercem HB40 high-build structural repair mortar was used to fill and seal the chases. webercem bondcoat, a polymer-modified, cementitious bonding aid and steel reinforcement primer, was first applied into the chases to ensure enhanced bonding. webercem HB40 is an acrylic-polymer modified, single component mortar and is lightweight with high build qualities. It can be applied in layers up to 75mm thick vertically, and 50mm on overhead soffits, and can be used without formwork. It was then applied onto the tacky webercem bondcoat primer and finished flush to the concrete surface.The Braefoot Bay terminal project has been completed successfully and Dewi Miller, contracts manager, BBCS, is confident that the jetty protection will extend the working life of the structure. "The products we have used are excellent and the application methods have enabled us to deliver a high degree of protection and reinstatement to the concrete structure. Working on a live site in a tidal zone has required a flexible work schedule but the whole project has worked exactly to plan and the client is very pleased with the result. The Weber materials have been the key to achieving this success."
Sponsored
Lots Road Power Station - London

Lots Road Power Station - London

EFFISUS

On January 2006, the Secretary of State granted the permission for the project, and the developer was really confident that it will be completed by 2013, but it got delayed because of the economic downturn. This is a £1 billion scheme and it is considered “the biggest riverside development on the north bank of the Thames for over 100 years”, creating 106 homes. In this project Effisus Pre-fab True Seal, a pre-fabricated sealing solution, was developed and applied for sealing difficult facade 3D details, minimizing human error possibility.