NBS Source
I'm a manufacturer

"quilts and mats"

1,701 results found

Sort by:

Showing 145-159 of 159

Sponsored
Appleby Magna Recreation Ground

Appleby Magna Recreation Ground

Broxap Ltd

Hand Made Places were approached by Appleby Magna Parish Council to provide them with a wide range of playground equipment. The equipment was for an already established recreational ground in Appleby Magna, Derbyshire. The parish council acquired funding to expand their playground. This was done in order to encourage more children to get involved in outdoor activities. The funding was supplied by Tesco’s ‘Bags of Help Initiative’. This uses the money from carrier bag sales to enhance their surrounding communities. Working to the strict budget supplied by this great scheme Hand Made Places needed to provide a wide variety of equipment, which would be suitable for all age groups. The equipment not only had to be enjoyed as a collection of single units, but it also had to work well together. The equipment also had to integrate well with the pre-existing metal equipment which was already present on the piece of land.Our wide range of equipment which was installed created a fun and interesting trim trail. This surrounded both the pre-existing equipment as well as our Hawks Nest. The installed trim trail included: Swing Steps, Trapeze Rings, Duck ‘n’ Weave, Wobble Bridge, Rope Walk, Zig Zag, Balance Beam and Stepping Stones. These pieces of equipment fit the clients brief in providing a fun place for children to enjoy physical play. It also provided a wide range of equipment which will help to encourage children to develop certain important skills, including both coordination and balance. All of these products were positioned in such a way as to allow the playground to flow whilst not overshadowing the pre-existing metal equipment.Our equipment is both fun and safe for use by a wide range of children all of whom fall into different age groups. To further enhance safety however, grass matting was installed to provide an impact absorbent surface.
Sponsored
JACKOBOARD® is the “ideal” companion for underfloor heating

JACKOBOARD® is the “ideal” companion for underfloor heating

BEWI UK Construction

The JACKOBOARD range from BEWI is “ideal” for use as a tile backerboard on projects where increasingly popular underfloor heating systems are being installed, the company says.Made from extruded polystyrene foam (XPS), the construction boards are said to be inherently waterproof because the structure of the board does not allow water to penetrate. They are designed to be easy to work with and cut, as well as truly lightweight.They are finished on both sides with a special coating and reinforced fibreglass mesh, ready to be tiled, rendered or plastered. The boards are said to possess excellent thermal insulation properties, which give them enormous advantages over plasterboard or cement board. They are especially suitable for interior construction, the company says, especially in rooms subject to high moisture levels.According to BEWI, JACKOBOARD goes “beyond bathrooms” and can be used in any room of the house and as a backerboard for virtually any tiling project.The boards are suitable for quickly and effectively levelling uneven walls and floors, for partition walls, compensating for cracks in substrates and for creating substrates for laying tiles on non-adhesive surfaces.JACKOBOARD is also said to provide the best waterproof, insulated, tiling substrate for underfloor heating projects. Whether electric mats or hot water systems are being installed, BEWI says, JACKOBOARD – laid underneath the heating elements or pipework – will help to decrease warm-up times of the system by pushing the heat directly up to the tile layer. In this way, the heat generated by the system is used in the most efficient way, not just during the initial heat-up stage, but in general usage with the continued thermostat-controlled use of the heating system.As builders are forced to reduce the carbon footprint of their projects, the materials they choose to build with can provide a key to unlocking the thermal performance of a building. The XPS foam used on JACKOBOARD products reportedly achieves excellent insulation properties. It’s designed to help maximise the energy efficiency of walls and floors, improving the overall thermal performance of any property.www.bewi.com
Sponsored
Case Study - Proteus Cold Melt® - Battersea Cats & Dogs Home

Case Study - Proteus Cold Melt® - Battersea Cats & Dogs Home

Proteus Waterproofing

Battersea Dogs and Cats Home in London, the best-known animal sanctuary in the world, is currently undergoing the biggest development in its 154-year history - a £5 million scheme delivered by main contractor, Sir Robert McAlpine. The development will bring the charity’s existing buildings and facilities into the 21st century and will include a new build, state of the art veterinary hospital which will be protected by an innovative new waterproof membrane – Cold Melt® from Proteus – a seamless application designed to work in harmony with the roof infrastructure and so tough that it has been BBA certified to last for the lifetime of the building.Quality Control An integral part of this transformation is the built up roofing system of 1,200 square metres of Cold Melt®. Applied by the Proteus Licenced Contractor, a 5 layer built up system was employed to offer a bespoke specification tailored to the client’s needs and budget.The built up system consisted of a layer of Cold Melt® Proteus’ own innovative, cold-applied liquid membrane, over which an insulation layer of Proteus Pro-Therm XPS was laid. The Licenced Contractor then added a separator sheet of Proteus Low-K followed by an attenuation mat and then three different finishes in three different areas of the roof – paving slabs, a green roof and decking.Health & Safety Proteus’ liquid applied systems are cold installed and therefore negate all the elements of fire risk when working in confined spaces. Of particular importance was the low odour that Cold Melt® exhibits, meeting all the health and safety criteria necessary to protect both the Licenced Contractor’s operatives and the dogs and cats home’s residents.Long term performance Cold Melt® incorporates recycled rubber-crumb and other organically grown products and when covered, creates an elastomeric, seamless and cold applied membrane which has a life expectancy longer that the design life of the building on which it is installed.
Sponsored
Westminster Bridge Road

Westminster Bridge Road

OptiTec Ltd

We have recently completed a 600m2 project in Westminster with installation by one of our main Approved Contractors, Ridgewell Flat Roofing.Specification – System UsedThis project called for extremely durable yet cost-effective waterproofing to be installed, which made the OptiTorch-Premium Bituminous Felt System the ideal choice. Having been used in the roofing industry for over 50 years, felt has been consistently developed and improved, and still remains one of the most popular systems available.OptiTorch-Premium bituminous felt is a high-performance waterproofing system that can be installed year-round, with excellent flexibility at temperatures as low as -25oC. This system provides long lasting resistance against UV rays and even contains special additives to protect against root growth.There was also a lot of detailing work and some gutter repairs required, so OptiFlex-Rapid PMMA Liquid was used for these parts of the project to ensure a completely watertight and visually appealing result.OptiFlex-Rapid is a quick-curing PMMA liquid waterproofing system with a typical curing time of just 20 minutes! It is cold-applied and is reinforced with 150gsm matting for extra resilience. OptiFlex-Rapid can be applied year-round and is a great choice for detailing and repair work as it can be applied directly onto most surfaces without the need for primer, which can often save time and money!The ProjectThis project was a 600m2 warm roof design with a standard build-up including 120mm tissue-faced PIR insulation, and also consisting of: OSA5 Primer, Vapour Control Layer, Insulation Adhesive, Insulation, Premium Self-Adhesive Underlay and Techno58 SBS Capsheet.Ben Ridgewell, owner of Ridgewell Flat Roofing, took on the project with Grant Jones (Co-Director) and his team, and completed the installation to their consistently high standards with an impeccable finish.The ResultsThe overall completed look of this project is very tidy and aesthetically pleasing – thanks to Ben and his team for a great installation, including an OptiTec warranty of 20 years to ensure peace of mind for the building owner for years to come.
Sponsored
Canberra House

Canberra House

Bauder Ltd

Canberra HouseBauder Cold Applied LiquiTOP SystemSynopsisCanberra House is an office facility in Swindon. The existing single ply PVC waterproofing system roof was leaking and so Bauder carried out a full site survey. The resultant report gave the client several options to rectify the leaking roof.Bauder Building BoardProject nameCanberra HouseLocationSwindonProject typeRefurbishmentRoof size985m²SpecifierRapleys LLP (Bristol)Approved contractorCentral Roofing & Building Services LimitedThe specificationThe LiquiTOP system was chosen as it can be applied directly to the prepared and primed existing single ply covering. The liquid system allowed us to get into tight spaces and without the need for any hot works.LiquiTOP is excellent on refurbishment projects where the complexity of the roof involves intricate areas to be detailed that are not easily achieved with a sheet membrane, or the actual working space on the roof is constricted.Project challengesLarge areas of plant and machinery were situated just above the roof level making access to the areas below difficult with the plant in-situ. The available budget on this project did not allow for lifting or removing the plant, stripping the existing waterproofing system, and replacing with new. Therefore, the decision was made to overlay the existing single ply membrane with a cold applied liquid waterproofing which can be installed without the need to raise any plant.To overcome drainage challenges, secondary upstands were created under the plant and fabricated channels placed underneath allowing water to flow through to the drainage points.The resultBauder was able to offer a cost-effective solution without the necessity to remove or decommission the roof mounted plant and machinery. Cost reductions were achieved for the client by overlaying the existing roof, negating any need to strip existing materials, and not having to remove or raise the plant.The works were carried out by Central Roofing who manged the project impeccably and also finished ahead of schedule.System installedBauder Cold Applied LiquiTOP System1 LiquiTOP PU cold applied liquidA moisture triggered curing polyurethane waterproofing resin; applied in 2 coats, reinforced with Bauder LiquiTOP Glass Fibre Mat.
Sponsored
The Ironworks. Sheffield

The Ironworks. Sheffield

Rawson Carpet Solutions Ltd

Rise Homes has developed and proudly opened The Ironworks Project in Sheffield. Built by Clegg Construction, the new ten storey build-to-rent scheme comprises 229 apartments & luxury 2- bed duplex’s. With resident lifestyle in mind, The Ironworks features extensive indoor and outdoor amenity areas. Rooftop garden, external courtyard, lounge, workstations for remote working, meeting and movie rooms.Rawson Carpet Solutions have supplied over 11,000 sqm of their Solution dyed nylon range of carpet tiles called ‘Jazz’. In 3 main colours in-keeping with the building scheme and furniture. Taking influence of natural colours, ‘Trism’, ‘Chilli’ and ‘Spanish stripe’ have been used to good effect. The warm colours of chilli nylon carpet tile support the leather finishes to furniture in the breakout spaces. This desert red, natural hew of the carpet tiles promote relaxation and socialisation. work and meeting spaces along with corridors utilise the bright and enthusing blue Spanish stripe, and the remaining spaces receive the natural grey tone of ‘Trism’ coloured nylon carpet tiles.Installed by Titan Flooring, Jazz Nylon Carpet tiles are manufactured Carbon Neutral, they offer class 33 heavy contract rating and excellent sound reduction properties. Working closely with teams in the construction process is vital to ensure the confidence of our customers and so we were very pleased to receive such praise as to the way Rawson Carpet Solutions had supported the project in the provision of carpet tiles for this project.Kevin Gamble of Clegg Construction commented ‘I would like to take the opportunity to thank Rawson’s for their efficient service. All the carpet tiles ordered, arrived on the due dates which allowed us to meet our contract completion date on time.’At Rawson, The long standing relationships we create are of paramount importance to us.Confidence can be gained in choosing the right carpet tile solution for the space to complement the aesthetics, ensure longevity and easy cleaning.Jazz nylon carpet tiles from Rawson Carpet Solutions achieve 26dB sound reduction, contributing to the calming environment and come in a selection of complementing patterns too.In addition, inlay entrance matting was completed by Rawson, providing an impressive, branded entryway to the building
Sponsored
Grand Designs: Green Roof Project

Grand Designs: Green Roof Project

Polyroof Products Ltd

The Protec System was used to waterproof the domed green roof areas of this striking, sustainable house development which was featured on Chanel 4’s Grand Designs. With an ambitious vision and a tight budget, Robert and Milla Gaukroger set about transforming a dated 1980’s house overlooking Lake Windermere into a state-of-the-art, eco-conscious home. Since the house lay in beautiful hillside surroundings, in order to blend into this setting, the domed roofs of the house were to be covered with a wildflower meadow mix to provide a green roof construction.The SolutionThe Protec System was chosen as a waterproofing membrane for the roofs as it is ideally suited for green roof applications. Lightweight, flexible and highly durable, the system can easily accommodate structural expansion movements and is tough enough to resist root penetration. The Protec system was applied to over 350m2 of domed roof to provide a long-lasting waterproofing membrane.The key reasons why Eastleigh chose Protec are the same reasons that has seen it become one of the fastest growing cold-applied liquid roofing systems in both the new build and refurbishment markets. Combined with the timber cladding to the verticals of the building, the finished aesthetics of the development blended seamlessly with the surrounding areas.A warm roof build-up that can be made waterproof at multiple stages:For larger projects the Protec system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier.The second phase follows the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.Highly flexible membrane:Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.RapidCure technology for quick installation:The application of Protec as a liquid, through to the curing process where a solid, tough membrane that can be walked over, takes only 30 – 60 minutes. This enables large sections of the roof to be fully completed in a short space of time.Installing the Roofing SystemsThe Protec System provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).The roof installation was carried out with a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.The use of a high-performance aluminium vapour barrier not only eliminates the risk of condensation within the roof, but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application – making for an extremely rapid installation. As you can probably imagine, fixing through 170mm of insulation into the crowns of the metal deck can be a tricky and time-consuming task.A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. An interesting fact when using Protec in inverted roof situations is its incredible durability performance – as tested by the BBA, Protec “can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated”.Monitoring and CompletionThroughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof’s free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner – saving the client time and money.
Sponsored
Fort Dunlop

Fort Dunlop

Bauder Ltd

Fort DunlopBauder Total Green Roof System (BTGRS)SynopsisDuring the recent regeneration in and around Birmingham, innovation has been a key factor; a theme optimised by the redevelopment of the Dunlop Tyres warehouse which has been transformed into 45,000m² of office space and a 6,000m² hotel.Bauder Building BoardProject:Fort DunlopInvestor:Urban SplashLocation:BirminghamArea Size:7,100m2Architect:Shed KMContractor:James M Green Company LimitedThe specificationPractical challenges such as the reduction of noise pollution and maximising the building’s lifespan were all met by the Bauder Total Green Roof System with an extensive landscaping of sedum. The planting scheme provided instant coverage as the sedum was laid as pre-cultivated vegetation mats. Green roofs have excellent acoustic qualities for both external sound (up to 3dB) and internal noise (up to 8dB). This proved essentially in the selection of the Xero Flor blanket due to the proximity of Fort Dunlop to Birmingham Airport. The resultThe entire solution provided a watertight installation in conjunction with a 20-year guarantee whilst making the structure both environmentally friendly and aesthetically pleasing.System installedBauder Total Green Roof System (BTGRS) 1 BauderPLANT EA torch-applied, root resistant capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC KSA DUOA self-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. 3 BauderPIR FA-TEFlatboard insulation used on the lantern roof area to help meet its U-value of 0.15W/m²K. 4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder insulation adhesive.Bauder XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green
Sponsored
Light Reflective Values for Brett's Alpha provide the solution at Litchfield dementia care facility.

Light Reflective Values for Brett's Alpha provide the solution at Litchfield dementia care facility.

Brett Landscaping

According to Alzheimer’s UK, there are around 900,000 people with dementia in the UK and this figure is expected to rise to 1.6 million by 2040. Dementia is an umbrella term and is caused when diseases, such as Alzheimer’s, vascular dementia and other conditions, damage the brain. As well as memory problems, dementia can also cause issues with vision and perception, leading to problems such as a welcome mat by a door looking like a black hole. The Equality Act and Building Regulations (Part M) make provision for people with dementia and there are some, when specifying paving for care homes and in the public realm, that can make a significant difference. One of the key points that can be addressed by speaking to a reputable paving manufacturer is the consistency of light reflection values (RV) throughout the landscape design. LRV measures the amount of light reflected back from a material when illuminated by a light source. The more light reflected, the higher the LRV. It is usually measured using aspectrophotometer. Research by Liverpool John Moores University demonstrated that an ‘uneven’ appearance of ground surface or patches of darker tone or colour can be confusing and potentially cause accidents. The institution also described how paving patterns or changes in colour that are arbitrary can cause confusion. It has concluded that strong paving patterns - such as chequerboard - may cause disturbance, as consistent light reflectance values are required. When Keepmoat Homes was involved in the building of the planned dementia care facilities in Litchfield, Staffordshire, the company spoke to specialists at Brett Landscaping. Keepmoat was working on a centre that would house up to 90 people in six buildings and needed the paving to be suitable for the residents at the centre. It required external paving which registered between 25 and 45 on the light reflective value spectrum. Rigorous and extensive testing of the LRVs of Brett’s products enabled Keepmoat to install paving that falls within the strict parameters of the guidelines. Testing of Brett’s Alpha Flow permeable paving systems at Brett’s manufacturing plants in Kent and Dorset, showed that the LRV was consistent on individual colour ranges. It also revealed that the variance between all three colour ranges (Autumn Gold, Brindle and Charcoal) is ideally suited for the project. Brett’s Alpha Flow paving is already widely used across the country for developments where developers are looking to improve surface water drainage and prevent flooding. Existing Alpha Flow pavements are also still offering between 15 and 20 years of low maintenance service. Other than the consistency of light reflective values, Alzheimer’s UK has called for other work to help those living with dementia. It also recommends carefully selecting materials to avoid reflective or dark surfaces which could confuse perception, planning continuous, level routes and avoiding steps if possible.
Sponsored
Social Housing & Local Authorities - Dudley Council

Social Housing & Local Authorities - Dudley Council

Tarmac

The Problem:Associated problems caused by damp and flooding are commonplace throughout the UK’s housing stock. Growth of black mould and efflorescence caused by salt transfer can lead to thedelamination of the plaster and there is no simple resolution. Often the only choice left to the housing association or local authority is to remove the original plaster and treat the walls with a Damp Proof Course (DPC), before waiting for it to dry to receive a backing plaster – all at the expense of the landlord or local authority.The Solution: A Modern, Lightweight Renovating Plaster:Limelite Renovating Plaster solves all of these problems. Firstly, it can be applied to damp walls, saving an enormous amount of money for time that would be otherwise spent waiting for the walls to dry out – it effectively controls dampness passing through walls, as well as providing a barrier against salt transfer – ultimately allowing the substrate to dry naturally. Secondly, and crucially, Limelite Renovating Plaster will withstand damp issues caused by future events, which may be likely in properties susceptible to damp and flooding.Thirdly the Limelite plaster system offers Thermal Insulation by drying the walls rapidly, reducing loss of heat and insulating the internal walls to meet modern day standardsThermal Conductivity, λ10,dry,mat, P=50% = 0.17W/m.KThermal Conductivity (k) at 0% moisture = 0.13W/m.KAnother benefit with Limelite plasters for internal use is their fire resistance/protection as a non-combustible product (as defined by BS476:Part 4) which can be assigned Class O in accordance with the requirements of the National Building Regulations and Reaction to Fire = Euroclass A1 Making the Difference for Local Authorities Dudley Council in the West Midlands is among the many local authorities that specify the use of Limelite Renovating Plaster when tackling such issues in social housing.“Where a renovating plaster is required we use the original and proven, Limelite” said Andy Pratt, Specification and Design Manager for Dudley Council, which has been specified by the council for over 40 years.Where existing plaster is sound, a small area of plaster is removed and replaced with Limelite.In more severe cases where the existing plaster is unsound, all plaster is removed and the wall is treated with a DPC before Limelite Renovating Plaster is applied. Limelite Renovating Plaster is also used for patch repairs in areas such as window reveals, where again the damaged plaster is removed and replaced with Limelite.A BBA Approved SystemLimelite Renovating Plaster is a BBA approved solution, when used as the backing plaster in a 2-part system, finished with our High Impact Finishing Plaster - a hard, durable finishing plaster that produces a Grade D impact resistant surface.
Sponsored
Third Space Islington Gym

Third Space Islington Gym

Total Vibration Solutions Limited t/a TVS Group

Third Space has opened its sixth and most luxurious health club in London with spacious training areas, state-of-the-art facilities, tranquil yoga studio, 20m adult pool, cycle amphitheatre and special facilities for youngsters.Free Weights AreaTVS Group’s heavy-duty, interlocking SPORTEC® Style Tiles, custom-produced black and grey-flecked finish perfectly completemented the gym’s colour scheme. Installing a layer of SPORTEC® Team Cup-X flooring beneath the tiles provided extra protection for the concrete subfloor and will further reduce noise and vibrations, while TVS proprietary rubber ramped edges created a neat transition with adjacent gym areas.Stetching AreaTo offer comfort and durability for the club’s large stretching area, TVS Group installed its SPORTEC® MotionFlex product, a fine-grained polyurethane puzzle-mat. It is ideal for fitness applications involving floor-based movements and wellness activities. The interconnecting tiles are simple to install and neatly shaped to suit most flooring schemes while their elegant dark grey colour set the calming mood for this part of the gym.Athletics-Based Track AreaTVS Sports Carpet was selected for the track as it offers excellent grip underfoot, especially relevant for speed, agility and quickness drills. The durability of the surface also allows athletes to push or drag a sled, helping to further develop their muscular strength and endurance. The track was supplied in a cool, oceanic navy blue and white colour scheme.Main Gym AreaThe expected high usage of the main gym area meant the flooring had to be sufficiently resilient. To achieve this and to ensure a perfectly level flooring finish across the gym, TVS Group first laid a dense rubber shock pad over the concrete substrate. It was overlaid with a covering from the highly wear resistant SPORTEC® Purcolor range. A light grey finish was chosen to reflect the sophisticated look and feel of the club.The StudioIn the studio, where high intensity training will take place, TVS Group opted for a highly elastic shock-absorbing underlay overlaid with a wear-resistant performance layer called SPORTEC® Color. The combination will protect the concrete substrate below while offering a comfortable and safe surface above for those involved in a diverse range of training activities.Other Fitness AreasIn other areas of the gym TVS Group supplied and installed a variety of high performing acoustic underlays, helping reduce noise and vibrations caused by treadmill running and other high impact activities in the studios.
Sponsored
SuperPhon gifts sound of silence to Droylsden Academy music rooms

SuperPhon gifts sound of silence to Droylsden Academy music rooms

CMS Danskin Acoustics

Opened in 2009, Droylsden Academy in Manchester is a contemporary, open plan teaching environment. The state-of-the-art secondary school serves 1,400 pupils, however since opening it had become apparent that its design and layout had some challenges, in a large part due to the sound pollution associated with the open-plan layout. Contractors Buildmain were briefed to reconfigure a number of areas in order to minimise reverberation and improve the learning environment – and looked to CMS Danskin to identify an appropriate remedial acoustic solution.The ChallengeOne area of the school that needed particular attention was the music room, which was too large to be conducive to effective music practice. Contractors Buildmain were briefed to reconfigure the space into four separate rooms, to provide a soundproof environment for music recital and practice. The new practice rooms were to adjoin an existing classroom and the communal corridor, so controlling reverberation was an integral part of the scheme – the architects had specified the control of sound levels up to 68dB.The SolutionA complete overhaul of the existing music rooms was required – partition walls were removed and a new layout designed to incorporate the four separate practice rooms, an internal corridor and a store room. To achieve the dB rating of 68, Buildmain opted for a combination of acoustic solutions provided by CMS Danskin, including SuperPhon panels in all four rooms.In order to control reverberation in the area, Buildmain constructed the new rooms using a twin-wall method, using 15mm Soundbloc plasterboard with an acoustic matting sandwiched between the layers. The walls were then over-clad using IsoMax Acoustic Insulation Clips. A total of 20 panels were installed by direct fix to the walls of each of the four new music rooms. The 50mm thick panels were supplied in three sizes; 1200x600mm, 1000x500mm and 1000x750mm, and the colour was matched to the school’s existing interior scheme.To offer even higher levels of absorption, CMS Danskin recommended SuperPhon acoustic wall panels to reduce reverberation times and reflected sound. To assist with the correct specification, a CMS Danskin representative visited the site, at short notice, to assess the rooms and subsequently advised on the best options for the SuperPhon panels.The ResultCMS Danskin worked closely with contractors Buildmain in order to meet the very tight time frame of six weeks to install the Superphon wall panels – the project needed to be completed within the school summer holidays, so that the rooms were ready for pupils on their return to school in September 2016.Paul Bryan of Buildmain said: “We had to fit eight weeks’ work into the six-week summer holiday, and CMS Danskin impressed us with their ability to turn around the product so quickly. Not only were they able to deliver to meet our schedule, they were also able to send out an expert to advise on the best options to meet the specification, all within the timeframe.”
Sponsored
Kal Kitchen Accessories

Kal Kitchen Accessories

Polyroof Products Ltd

KAL is a member of the Gowan Group, a family-owned holding company, directly controlling many successful trading companies as well as significant property holdings and financial investments in public and private companies in Ireland, Northern Ireland and the UK.The largest appliance distributors in Ireland, KAL rely on a 30,000 square foot designer showroom for unique kitchen and domestic appliances. Their showroom at Dublin’s Citywest is one of the largest of its kind in Europe showcasing all their kitchen and consumer appliance brands.The ChallengeAfter conducting a survey of the 1,000m2 roof, it was determined that the areas of the roof, specifically the office area, were in need of repair. Some areas of the original roof build-up were starting to leak and lap joints failing due to a poor install.Following the site survey and adhesion tests, a site-specific specification was produced for the client and contractor to overview once all parties were happy with the proposals. With some complex detailing work involved, a decision was made to overlay the existing roof build with Polyroof Protec System.The SolutionPolyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application, the works could be carried out during working hours, with little disruption to the office staff below and little working time lost for the client.IPRS Limited, an experienced roofing and panel repair contractor and Polyroof Approved Contractor, were chosen to undertake the work on the project. Firstly, before any work could begin, the original waterproofing of the office roof was pressure-washed and cleaned down. Once all initial preparation was completed, the Protec System application could begin.All areas requiring priming before the main system application were primed and allowed to cure. Any joints were sealed using taping mat and Protec Resin and allowed to cure. Once this preparation had been completed the main Polyroof Protec System, chosen in light grey by the client, was applied.The first coat was allowed to cure before the final coat was applied. Due the Protec System Rapid Cure technology, the finished roof could be walked on after just 30-60 minutes after applications. This allowed for large roof areas to be made fully waterproof within a matter of hours. After the inspection was completed, the client received Polyroof’s trusted Accredited System Guarantee.Taking away the challenges of flat roofing projects.Polyroof’s reputation has been built on the high level of technical support provided to clients before, during and after every contract. We like to work closely with our clients from the very beginning of a flat roofing project right through to completion and throughout the lifespan of the roof. From our experience, this is the best way to guarantee that all aspects of the roof are finished to the superior standards that our clients expect.
Sponsored
Queens Crescent, London

Queens Crescent, London

Polyroof Products Ltd

Queens Crescent is a bustling retail street situated in London’s Kentish Town. The roof area above the Post Office building, which also served as a communal walkway area with access to the upper level of the adjacent buildings, had been suffering from leaks. To add to the issues, the aged promenade tiles had worn and become a slip hazard when trafficked. Looking for a lasting waterproof solution that can also provide heavy duty anti-slip surfacing, the client turned to Polyroof for a solution. To minimise access disruption to the upper level adjacent buildings, the client had organised a 5-day window for the waterproofing and surfacing works to be completed.The SolutionThe main contractor had removed the old paving slabs and membrane back to the concrete deck underneath and carried out repairs to create a level surface.Approved Polyroof Contractor Emperor Roofing began by priming the concrete surface to create a sealed, non-porous substrate. With its quick-curing properties, the Polyroof primer was ready to be over-coated only 30 minutes after its installation.A specialist twin-pack epoxy metallic primer was applied to metal detailing sections, including ducting vents and the intricate balustrade detail alongside the communal stairwell, which also formed part of the specified works.Local reinforcements were carried out to these details involving taking Protec resin and PolyMat 450 up by 150mm before applying the full waterproofing system.Upon completion, the balustrades were re-painted, with the paint being taken over the waterproofing membrane to create a neat detail. A key advantage of liquid systems in general is their ability to seamlessly seal around complex detailing; in this instance, quite simply, the balustrades could not have been sealed effectively using a traditional waterproofing technology.Polyroof’s Protec System enjoys exceptionally fast detailing speeds, where its formulation allows it to rapidly break down the chopped strand mat reinforcement and neatly moulds around the detail it is covering. To the left of the stairwell, the Protec system was chased in at a height of 150mm above the level of the stairs.The termination point of the waterproofing membrane was sealed with mastic to create a fully weatherproof detail. The Protec system was dressed onto the wall abutments to the main areas but left self-terminated as new render is to be applied to the walls and taken down over the top of the Protec system.After local reinforcements were completed the main waterproofing system was applied to the walkway and stair areas.The two-coat Protec system was able to be rapidly installed with its 30-60 minutes cure times, meaning the project was comfortably ahead of schedule by the time it was complete.Next, the designated anti-slip areas were carefully masked off, leaving the exposed waterproofing to the roof perimeters, detailing and vertical sides of the step and stairs. A third coat of Protec was applied to the masked sections and, whilst the liquid was still wet, 0.7-1.2mm quartz sand aggregate was broadcast into the resin.Once dried, the aggregate is embedded within the membrane and lose sand was brushed off and collected to be re-used. In order to provide an extra-tough surface that sealed that aggregate in place, a coating of PolyFinish was applied over the aggregate in the client’s choice of light grey.
Sponsored
Wedding Cake, Waddesdon, UK

Wedding Cake, Waddesdon, UK

Vebro Polymers

Client: Rothschild FoundationLocation: Waddesdon, UKYear: 2023Project size: 100 m²Vebro systems: vebroflex Comfort UV PlusA resin floor was required to ensure a seamless visual transition between the floors and walls at a unique, 12 metre high, wedding-cake-shaped venue, colour matching perfectly to the vibrant pastel pallet of the tiles and sculptures adorning the exterior façade.Set in the beautiful English countryside in Buckinghamshire, Waddesdon Manor was built by Baron Ferdinand de Rothschild to display his collection of arts and to entertain his friends.According to Rothschild Foundation, who manage the house, “The contemporary ethos of the estate looks to ensure all of its assets are cared for holistically and the past, present and future combine and are presented to the highest standard and level of inspection at all times”.Standing within a grove of trees on the estate of Waddesdon Manor, this ceramic sculptural pavilion – in the form of a three-tiered wedding cake – is the latest Rothschild Foundation commission from celebrated Portuguese artist Joana Vasconcelos.Aptly named Wedding Cake, over 25,000 gleaming, icing-like ceramic tiles decorate the cake – all made in a traditional Portuguese manufactory – glazed in pale pinks, greens, and blues.100 square metres of Vebro Polymers’ vebroflex Comfort UV Plus system was installed in two colours – RAL 6019 Pastel Green in the central area atrium with RAL 9010 Pure White around the perimeter.vebroflex Comfort UV Plus is a solid-coloured, UV-stable, elasticised, polyurethane liquid-vinyl resin that achieves up to 200% elongation at break. Once cured, the material delivers a smooth, matt-finish surface that deadens sound transfer between floors by up to 4Db. Additional sound absorption can be achieved with a liquid membrane or rubber matting.The cementitious screed was reinforced using vebroscreed R&S (Repair & Strengthen) to improve the compressive strength of the sand / cement screed.vebroscreed R&S is a transparent, solvent free, epoxy material used to penetrate fine crack and fissures in cement-based semi-dry cementitious levelling screeds – injecting additional strength and reinforcement prior to the installation of floor coverings.One of the most interesting aspects of the install involved an intricate mandala formed in brass, which was positioned in the centre of the lower atrium floor, creating a stunning central focal point underfoot for visitors.The pigmented aliphatic comfort resin was used to infill each of the brass trim petals using a large syringe. Each petal was meticulously injected one by one, taking a whole day to complete.Resin Flooring Specialists (RFS) are one of the UK’s leading resin flooring installers, based in Kent, and working throughout England.RFS works alongside the UK’s largest construction companies, as well as working direct for clients across a wide range of industry sectors.Mindful of slip resistance, cleaning, performance and aesthetics, RFS pride themselves on being able to deliver the right solution for all resin flooring needs no matter what the environment.RFS are members of the Resin Flooring Association – FeRFA – and Construction Line as well as being an Alcumus Safe Contractor and CHAS Accredited contractor.

Showing 145-159 of 159

Feedback