NBS Source
I'm a manufacturer

Kal Kitchen Accessories

OVERVIEW

KAL is a member of the Gowan Group, a family-owned holding company, directly controlling many successful trading companies as well as significant property holdings and financial investments in public and private companies in Ireland, Northern Ireland and the UK.


The largest appliance distributors in Ireland, KAL rely on a 30,000 square foot designer showroom for unique kitchen and domestic appliances. Their showroom at Dublin’s Citywest is one of the largest of its kind in Europe showcasing all their kitchen and consumer appliance brands.

The Challenge


After conducting a survey of the 1,000m2 roof, it was determined that the areas of the roof, specifically the office area, were in need of repair. Some areas of the original roof build-up were starting to leak and lap joints failing due to a poor install.


Following the site survey and adhesion tests, a site-specific specification was produced for the client and contractor to overview once all parties were happy with the proposals. With some complex detailing work involved, a decision was made to overlay the existing roof build with Polyroof Protec System.


The Solution


Polyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application, the works could be carried out during working hours, with little disruption to the office staff below and little working time lost for the client.


IPRS Limited, an experienced roofing and panel repair contractor and Polyroof Approved Contractor, were chosen to undertake the work on the project. Firstly, before any work could begin, the original waterproofing of the office roof was pressure-washed and cleaned down. Once all initial preparation was completed, the Protec System application could begin.


All areas requiring priming before the main system application were primed and allowed to cure. Any joints were sealed using taping mat and Protec Resin and allowed to cure. Once this preparation had been completed the main Polyroof Protec System, chosen in light grey by the client, was applied.


The first coat was allowed to cure before the final coat was applied. Due the Protec System Rapid Cure technology, the finished roof could be walked on after just 30-60 minutes after applications. This allowed for large roof areas to be made fully waterproof within a matter of hours. After the inspection was completed, the client received Polyroof’s trusted Accredited System Guarantee.


Taking away the challenges of flat roofing projects.


Polyroof’s reputation has been built on the high level of technical support provided to clients before, during and after every contract. We like to work closely with our clients from the very beginning of a flat roofing project right through to completion and throughout the lifespan of the roof. From our experience, this is the best way to guarantee that all aspects of the roof are finished to the superior standards that our clients expect.

Products featured in this case study

View all products (6)
Protec Overlay Roof Systems - Cold-applied liquid waterproofing

Protec Overlay Roof Systems - Cold-applied liquid waterproofing

More case studies from Polyroof Products Ltd

View all case studies (31)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

More case studies from Liquid-applied cold roof covering systems

View all case studies (28)
Fleming Park Leisure Centre

Fleming Park Leisure Centre

Durham University Gateway

Durham University Gateway

Barton Hill Academy

Barton Hill Academy

Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School