NBS Source
I'm a manufacturer

"construction plant equipment"

8,110 results found

Sort by:

Showing 1405-1412 of 1412

Sponsored
Westminster Quarter development

Westminster Quarter development

Eclisse UK

ECLISSE are delighted to have been the supplier of choice for this prestigious development in the heart of historic London. The Westminster Quarter development comprises of 102 private luxury apartments, many with private outdoor space. Residents will also benefit from an exclusive gym, 24hr concierge service and landscaped courtyard and the roof terrace and roof lounge have stunning views of the Houses of Parliament and other iconic landmarks. Completion: 2017 Residential Units: 102 Construction Cost: £35.5m Architect: White Ink Architects Client: Taylor Wimpey Contractor: McAleer & Rushe
Sponsored
Green Hollow, Cheshire

Green Hollow, Cheshire

Technal

This contemporary style, five-bedroom detached house commands a floor area of 10,000sq ft and includes an indoor swimming pool together with gym and leisure facilities. Rear facing, the property has been constructed on raised land that slopes down to a natural stream with breath-taking countryside views beyond.Following the initial design with the architect, TECHNAL provided a full NBS specification for the aluminium systems with typical through sections and full thermal value calculations, as well as budget budget pricing pre-tender to ensure an accurate tender package.
Sponsored
APL Case Study -  StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - BMW Swindon Press Shop

Architectural Profiles Ltd

Year: 2019Architect: Maber Assembly:·        Walls – APL StrongBak™ with external vertical APL profiled cladding Size:·        Approx 23,000 m² of StrongBak™ & APL external wall profiles Special Features:·        StrongBak™ system requested direct from client·        A follow-on project from the new BMW Mini factory in Oxford, which APL supplied as the same construction assembly and area·        Building 23m high·        All materials delivered to site within a 6-7 week period Building Location:·        Swindon, Wiltshire
Sponsored
Protection Board - London Aquarium

Protection Board - London Aquarium

Wallbarn Ltd

The contractor was relaying a waterproof membrane immediately above the London Aquarium and naturally the client was concerned about leaks with such precious livestock beneath. The waterproofing was torch-on bituminous felt membrane, due to be covered with road grade asphalt. Protecto-board was laid onto the waterproofing and secured with tape. It was cut to shape around the curbs cleanly and effectively without leaving vulnerable areas and without delaminating or crumbling, or leaching bitumen. It protected the waterproofing from temporary construction process damage and permanently protected it when covered with hot road grade asphalt afterwards
Sponsored
KPMG Edinburgh

KPMG Edinburgh

Optima

A recent project saw us working alongside main contractors GHI and architects, Michael Laird in Edinburgh. KPMG’s new Edinburgh headquarters concluded after a period of regenerative construction and development, split between 2 phases. The intention to reflect the history and people which make Edinburgh an iconic city. Phase one included creating a space for employees to work as employee wellness was at the forefront of design during this phase. When working on phase two, we installed partitions to the cafés and client suites. KPMG’s objective is to have an environment ‘that encourages interaction, collaboration and communication’.
Sponsored
Ping An Finance Center

Ping An Finance Center

Jotun A/S

Ping An Finance Center is an iconic 115 story skyscraper in Shenzhen, China. Reaching 600 metres high, this striking building was completed in 2017, making it the world’s fourth tallest building and the second tallest in China. Jotun was chosen as the single source provider due to our long track record of multi-divisional, complex projects. Jotun Protective Coatings and Powder Coatings were specified to protect the steel structure and façades. An ideal choice, confirmed by both the contractor and applicator, due to Jotun’s consistent application properties under varying environments and construction conditions.
Sponsored
Vapour Control Epoxy flooring to luxury basement in Surrey

Vapour Control Epoxy flooring to luxury basement in Surrey

Koster Aquatecnic Ltd

During a basement construction project in Surrey it was revealed that there was no functioning vapour barrier installed under the concrete raft slab. Koster Aquatecnic designed and assisted in the installation of the Koster VAP I 2000 system followed by Koster epoxy decorative coatings to prevent damage caused by vapour release and leave a beautiful finish.Please visit our case study via the link. If you would like further information or have a similar project you would like assistance with designing, please contact the Koster Technical team at technical@kosteruk.com.
Sponsored
The Hub, Hattersley - Leaking Podium Deck

The Hub, Hattersley - Leaking Podium Deck

Delta Membrane Systems Ltd

Delta were employed to assist on this leaking podium deck project. Following a full assessment of The Hub and its underground parking facilities it was identified that rainwater was entering the basement car park through the ceiling deck at multiple points. These points included holes that were formed to allow drainage from the surface, movement joints and investigation holes that had been created through the steel rib and concrete deck. Based on “as built plans” a system was designed post construction that would offer the same quality of structural protection had it been incorporated during the build phase.

Showing 1405-1412 of 1412

Feedback