NBS Source
I'm a manufacturer

"wood block and strip flooring"

7,410 results found

Sort by:

Showing 1189-1224 of 1520

Sponsored
Eggborough Power Station

Eggborough Power Station

Lionweld Kennedy Group

Contracted by the 'National Grid', Lionweld Kennedy supplied and installed protection for the Eggborough Power Station. We created 46.6m high protective blast screens and kentlidge support blocks to the transformer station. All of the steel provided was manufactured in-house and fabricated to meet the needs of the client.
Sponsored
Klasse G-board | Rosebank Way, Ealing

Klasse G-board | Rosebank Way, Ealing

Klasse Group Ltd

This residential block in Ealing, London required replacement cladding, in part due to recent fire regulations and rules that have come into effect.Klasse G-board was utilised on this project due to its ease of use and A1 fire-rated, fully non-combustible classification.
Sponsored
Castle Basin

Castle Basin

Tobermore

The Castle Basin area of Enniskillen in Northern Ireland was transformed with a £1.7 million investment, funded by the Department for Social Development and Fermanagh and Omagh District Council. Tobermore’s Fusion block paving and Mayfair Flags were used to create a contemporary look for the tranquil walking route.
Sponsored
Apartments Bainbridge Court, Leicestershire

Apartments Bainbridge Court, Leicestershire

Wienerberger Ltd

Wienerberger's Porotherm Cellular Clay Blocks (PTH100, PTH140, PTH190) were used to construct a McCarthy and Stone development, in Ashby de la Zouch, Leicestershire, consisting of 32 one and two bedroom apartments, and was the third Porotherm development to be undertaken in the West Midlands region.
Sponsored
‘Copper Mine’ powder coated finish on solar shading makes a stunning statement for offices in a rural location

‘Copper Mine’ powder coated finish on solar shading makes a stunning statement for offices in a rural location

Powdertech (Corby) Ltd

The designers for the new offices in Atherstone, Warwickshire focused on creating a building that would be in tune both with its rural surroundings and also with the inventive and artistic profession of the occupants. The premises are the headquarters and design studio for a well known video game development company.The design of the building is based on a large barn with attractive contemporary wooden panelling and external posts and beams. Running alongside these posts and beams is dramatic bespoke aerofoil solar shading and weather louvres.As a perfect colourful contrast for offsetting the wood, ‘Copper Mine’ - gives the effect of patinated copper or Verdigris. The project comprises of 475 linear metres of 170mm elliptical aerofoil blades.The final effect of the blue/green aerofoil fins set against the wood is stunning as the images show. ‘Copper Mine’ is a textured finish and will give a pleasing variation in shade as sunlight moves across its surface
Sponsored
Injured Jockey Fund Gym

Injured Jockey Fund Gym

CMS Danskin Acoustics

BackgroundThe Injured Jockey Fund (IJF) Oaksey House rehabilitation centre in Lambourn, Berkshire, was opened in 2009 by the IJF Patron, HRH The Princess Royal. Oaksey House provides specialist rehabilitation treatment for physical and neurological injuries, it has a fully equipped gym which includes a state-of-the-art anti-gravity treadmill. The centre has respite accommodation available for those receiving extended treatment and their carers. Educational courses on fitness and nutrition for the general well-being of young and aspiring jockeys are also on offer.Oaksey House is not only a rehabilitation centre for jockeys, but anyone with physical or neurological injuries. Although the centre was only opened in 2009, it was decided that a refit was required to make improvements to further support the people that pass through its doors. The refit included moving the gym to the first floor and building a hydro pool on the ground floor.The ChallengeRelocating the gym to the first floor was no easy task, primarily because the building structure was composed of a steel tray and concrete base. To accommodate gym activity, the floor build-up would need to be enhanced to prevent noise and vibrations travelling through the building.As a charity, the IJF had limited funds to work with, so flooring specialists, Sport & Fitness Flooring, worked with the architect and an independent consultancy to identify an effective solution within the specified budget. Moreover, the floor had to be designed to meet the needs of four distinct areas: a cardiovascular zone, a running track, main gym area and an entrance lobby.The project was unique because various performance requirements had to be met across the four areas but the floor level needed to be consistent throughout to make it accessible for wheelchair users. Sport & Fitness Flooring consulted CMS Danskin Acoustics – Gym Flooring Division to advise on potential solutions to address this challenge while remaining cost effective.The SolutionCMS Danskin Acoustics worked with Sport & Fitness Flooring to undertake on-site subjective testing to determine the level of sound reduction and vibration control that would be required. The primary objectives were to prevent vibration travelling into the structure of the building thus resulting in potential structural damage or unwanted noise levels on the ground floor below. Samples of different build ups were provided by CMS Danskin Acoustics on site for testing within a day of the initial request.“Throughout the planning stages CMS Danskin Acoustics acted as a ‘springboard’ for our ideas. They were extremely helpful in offering their expertise to find solutions to meeting the performance requirements of the floor,” said Darren Wood, Director of Sport & Fitness Flooring.Sport & Fitness Flooring worked with CMS Danskin Acoustics to identify a way of raising the floor in different areas to meet a consistent 84mm thickness throughout, without having an adverse effect on the acoustic performance of the flooring. CMS Danskin Acoustics developed a bespoke specification for the four key areas, with solutions subsequently presented to the architect and approved for use on the project.The ResultCMS Danskin Acoustics was able to meet the performance, volume, and diversity of product needed to effectively treat the floor at a competitive price and on budget.In the main gym area, a high-performance combination of everroll® Multitile (everroll Multitile 27mm) was bonded to Regupol® 40/80 Acoustic Foam and fitted to Regupol® Vibration 300. In the cardiovascular zone, Multitile (everoll Multitile 27mm) was bonded to Regufoam® 270 acoustic PU foam and fitted to ply which was adhered to Regupol® Vibration 300. The track was treated with BOK Sprint track bonded to a everroll® Impact Pad elastic layer, ply build up and Regupol® Vibration 300. Finally, concrete effect Luxury Vinyl Tiles (LVT) were used to create a purpose-built ramp up to the 84mm floor level from the entrance lobby.On day one of the build schedule, there was a timed delivery of the material. The bespoke order was exactly as specified and allowed installation to begin immediately with no delays. CMS Danskin Acoustics attended Oaksey House to provide expert on-site support and technical guidance on the installation. The project finished a week ahead of schedule, on budget and the flooring met all the performance requirements that were specified. Crucially, a consistent floor level was successfully achieved throughout the gym.“It’s quite common for suppliers to just sell a material and move on, but CMS Danskin Acoustics deliver a first-class expert and professional service from initial technical involvement, to tracking, delivery, installation and sign off. We regularly work with CMS Danskin Acoustics on various bespoke projects and are always confident in the solutions and expertise provided,” concluded Darren.
Sponsored
Saxton Lane

Saxton Lane

Cemfloor Liquid Screeds

Project Name:Saxton LaneProject Location:LeedsMain Contractor:Torsion ConstructionCemfloor Installed By:B & K SystemsProduct Used:Cemfloor C25Saxton Lane is made up of two residential tower blocks in the heart of Leeds.The 18 and 22 storey tower blocks contain over 300 apartments on the former Alton Cars Showroom site, in an area that is currently enjoying substantial investment and economic growth.Cemfloor C25 was chosen for this project thanks to its many benefits including;Reduced drying time compared to other screedsCement based screed that is compatible with all cement based adhesives; including fast track systemsEasy Installation which reduced time and costsFoot traffic allowed after 24/48 hours which meant other aspects of the project could continue
Sponsored
Timber Yard, Birmingham

Timber Yard, Birmingham

Cellecta Ltd

Timber Yard consists of two residential buildings made up of a collection of 379 modern apartments in Birmingham’s Southside district. The East Block features stylish one, two and three bedroom apartments, while the West Block includes a mix of studio, one and two bedroom apartments; both buildings surround a private courtyard garden. This development provides leisure facilities such as a gym, concierge services, a club lounge and screening lounge, and parking. The location is pedestrian friendly, with Birmingham New Street and Birmingham Moor Street walkable within 10 minutes.Cellecta HEXATHERM XFLOOR 250 was specified by Claridge Architects on this project for its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for residential applications.Galliard Homes and Apsley House Capital were awarded this 7,500m² contract to construct this development.
Sponsored
Chiswell Street

Chiswell Street

Armourcoat Ltd

The recent refurbishment of 4 Chiswell Street by Ben Adams Architects includes Armourcoat’s Istria polished plaster wall finish. Situated close to the historic Bunhill cricket ground in Islington, this once tired office building has been re-imagined as a modern and open workspace.Entering through an impressive new façade and front entrance, the architect’s design includes a double height reception space bathed in natural light. A sculpturally fluted wall finished in Istria polished plaster and custom terrazzo floor continue a circular motif repeated throughout the design. With exposed services and stylish use of concrete colours, the structure has been transformed into a contemporary and relevant commercial building with a distinctive urban feel.Named after the characteristic building stone of Venice, the Istria polished plaster finish is made from a combination of slaked lime, recycled marble powder and special additives. The Istria finish is full of ingrained surface movement and creates a matt or honed stone appearance. Tonal variation and surface movement within the finish complements other natural materials including wood, stone and fabric.
Sponsored
Wavy seating on private members club roof terrace

Wavy seating on private members club roof terrace

Furnitubes International Ltd

Members-only club in London’s Covent Garden, The Conduit Workspace focuses on sustainability and ethical hospitality, encouraging creativity and collaboration.Featuring relaxed working and dining spaces as well as event space, a library, and rooftop bar and restaurant, it spans across six floors offering everything needed to connect its members.The brand new rooftop terrace was created in partnership with the House of Champagne, Ruinart, with the goal to place nature at the heart. The rooftop features plants chosen specifically for pollination as well as upcycled and recycled furniture and art.To complete the rooftop extension, designer, Alice Crispi, approached us after seeing our RailRoad seating range - she wanted a continuous wavy modular solution that would also accommodate large planter pots within the curved sections. A 15m RailRoad Delta seat with a continuous backrest was delivered in modules making it easily transported to the roof terrace. A UVP protective coating in teak was also applied over the timber slats to maintain the wood’s colouration.Surrounded by greenery, members can relax and enjoy stunning views across London from the rooftop terrace.
Sponsored
elZinc Rainbow Red - Adelaide Convention Centre

elZinc Rainbow Red - Adelaide Convention Centre

AccuRoof

The Adelaide Convention Centre ACC celebrated 30 years in operation in 2017 with the opening of the last phase of its expansion, the East Building, designed by architects Woods Bagot. The building is faceted like rocks and clad in elZinc® Rainbow Red to reflect the South Australian landscape.
Sponsored
Berkeley House, Wothorpe

Berkeley House, Wothorpe

Trespa UK Ltd

Trespa® Meteon® NW02 Elegant Oak is chosen for the Berkeley House project in Wothorpe. A new departure for a traditional builder who wanted a crisp modern appearance yet using materials with a traditional nature. The use of Wood decors gives a warm elegance to the façade.
Sponsored
Hillside Gardens Lambeth MMC Affordable Housing

Hillside Gardens Lambeth MMC Affordable Housing

FastClad

Traditional Brick for a Modern AestheticFastClad was introduced to this project by EH Smith Clay Products as the best solution for processing the First Quality Facing bricks, which were critical for meeting the planning conditions, to provide a real brick faced rainscreen with a BBA Certified minimum design life of 60 years.The mission was to construct affordable housing on a difficult to access site and to demonstrate that social housing that has not been traditionally built looks as good, if not better, than traditionally built private developments.Taking the external skin off the critical path of the build, delivering the equivalent of 1,200 bricks on one pallet (as opposed to three packs of brick) to save site compound space and being able to strip the full scaffold to install the FastClad off mobile towers freeing up the site for other trades, are just some of the benefits of moving away from a full masonry build up.
Sponsored
IMPRESSIVE WINDOWS RELY ON HODGSON SEALANTS

IMPRESSIVE WINDOWS RELY ON HODGSON SEALANTS

Hodgson Sealants

78 St James Street, a very special office refurbishment in the heart of London’s Mayfair, has involved a slew of skilled and experienced contractors to make the Grade II* Victorian building a commercial space fit for 21st century working while retaining the building’s magnificent fabric. Halifax Glass has used Hodgson Sealants’ U9 silicone for sealing the building’s impressive timber window units.  The windows, which are the full height of the storeys on the front façade, required a specialist glazing company to meet the demands of the project. Halifax Glass has many years’ experience in creating architectural glazing solutions and was called in to produce and install the windows at St James Street using Hodgson Silfix U9 Silicone Sealant for the job.  Halifax Glass also used quantities of Hodgson’s Flexistrip, the market-leading load-bearing security glazing strip for installing double glazed units, laminated glass and single glass into windows and doors.
Sponsored
Guy Nelson Hall

Guy Nelson Hall

Knauf Ceiling Solutions Limited

Knauf integral in Warwick Hall development.The Knauf team has played a significant role in the  specification and design process during recent  construction at one of the oldest schools in England, working alongside award winning Associated Architects to produce a masterclass in acoustic  performance.The site consisted of an existing hall, which was used for assemblies, performances and functions. This hall was built in the 1960s and suffered from a series of failings which impacted its flexibility and usefulness.The proposal for the Warwick Hall was an opportunity to build a physical embodiment of Warwick School’s  academic excellence, prosperity and ambition, which saw the existing school hall stripped back to its structural frame and heavily modified to provide a state-of-the-art, revitalised and flexible school hall with  a large double height entrance foyer, two performance  studios and other ancillary spaces. The brief was given to the team at Associated Architects and they quickly relied on the quality of materials and service provided by Knauf.
Sponsored
Waterside Park

Waterside Park

The Safety Letterbox Company

THE PROJECTThe Waterside Park project features multiple banks of a fire rated mailboxes that comply with the BS 476 Part 22 offering a one hour integrity rating that will ‘contain and form a break to a fire’.The bank of mailboxes are recessed into a wall and integrated with a finishing surround frame providing a high quality edging to the products, hiding any gaps between brick and mailbox and ensuring a high quality finish.The mailboxes feature an inward sprung flap, which is a standard feature across the fire rated mailbox range. An intumescent strip is placed on the internal side of the mail flap, which expands when the temperature increases and ensures that the flap is kept closed – stopping the oxygen flow into the mailbox and reducing the risk of fire spreading through the mailbox.Each mailbox used in this project has been fitted with a unique identification numbering vinyl with a black colouring to easily show the users (both residents and postal operatives) where each mailbox is situated.
Sponsored
158 bespoke Classic Pocket Door Systems supplied to 1 Crown Place, London

158 bespoke Classic Pocket Door Systems supplied to 1 Crown Place, London

Eclisse UK

One Crown Place is a development that sets a new standard of architecture with two prismatic towers hosting 246 private apartments, rising 28 and 33 storeys into the sky. At lower levels, it is home to 109,675sq ft of high-quality office space and a variety of retail units.A Georgian terrace, a retained warehouse facade on Earl Street and 54 Wilson Street, and a 1970s block make up the remaining parts of this 24/7 destination delivering a boutique hotel, restaurant, collection of club lounges, bars, and affordable office space.ECLISSE UK Ltd supplied 158 bespoke Classic Pocket Door Systems for the project in various sizes, plus accessories. The pocket doors were used to provide convenient access to the ensuite bathrooms.Start on site: April 2018Completion date: May 2021Address: One Crown Place, 54 Wilson Street London EC2A 2ERGross internal floor area: 49,500m2 (new build)Construction cost: £518 millionArchitect: Kohn Pedersen Fox AssociatesClient: MTD GroupDevelopment manager: CBREProject manager: CBRE
Sponsored
199 Westminster Bridge Road, London

199 Westminster Bridge Road, London

Akzo Nobel Powder Coatings Ltd

A unique replacement of a 1960's office block residing next to Waterloo Station which now incorporates student accommodation.The curved and solid panelwork utilised a bespoke fine textured powder coating to match a specific RAL Design shade.Finish: Interpon D2525 YA300E
Sponsored
The Innovation Factory, Belfast

The Innovation Factory, Belfast

Tobermore

When Belfast based architecture firm, McAdam Design, was sourcing external building and landscaping products for exciting new business hub, The Innovation Factory in Belfast, Tobermore exceeded expectations with the provision of Kingston facing brick for the building works and a variety of block paving products for the grounds.
Sponsored
Coloured asphalt for large holiday park

Coloured asphalt for large holiday park

Tarmac

This new adventure village at a large Haven holiday park in Gwynedd, Wales required a safe decorative surface for visitors. The light buff coloured asphalt complemented both the design of the adventure village and the coastal setting far more than conventional black asphalts or block pavers.
Sponsored
Aluminium Stair Nosings for Ceramic Tiled Stairs

Aluminium Stair Nosings for Ceramic Tiled Stairs

Gooding Aluminium Ltd

Our black anodised Premium CMS stair nosings can be found in the entrance lobby at Queen Street Place, London EC4. Installed by Harper and Edwards, these elegant black anodised stair edgings create an excellent surface contrast to the grey porcelain tiles and natural wood features.
Sponsored
Biophilic Office Design using Formica® Collection and FENIX®

Biophilic Office Design using Formica® Collection and FENIX®

Formica Group

Decors from the Formica® Laminate Colors, Woods and Patterns Collection have been specified for a hospitality and boardroom suite for StudioCanal at their offices in Pancras Square, London. McFarlane Latter Architects were looking for a contemporary interior design scheme filled with biophilic colours and natural woodgrains. 
Sponsored
Sweden’s Safe Sanctuary: ‘House of Heroes’ children’s recovery centre is built with MEDITE® TRICOYA® EXTREME

Sweden’s Safe Sanctuary: ‘House of Heroes’ children’s recovery centre is built with MEDITE® TRICOYA® EXTREME

MEDITE SMARTPLY

A hospital facility in Norrland, Sweden has been renovated extensively with wood-based products, owing to the universal belief that natural materials help people heal better. This serene and homely sanctuary functions as a temporary home for families with young children suffering from long-term illness.
Sponsored
Klasse G-board | Castle Exchange, Nottingham

Klasse G-board | Castle Exchange, Nottingham

Klasse Group Ltd

Cladding is being replaced on a flat block in Nottingham’s Hockley after it was found to contain similar insulation material as Grenfell Tower. Klasse G-board has been chosen as part of the re-clad project, especially for its A1 fire-rated, fully non-combustible properties.
Sponsored
Macclesfield FC - New F. Ball adhesive nets a quick result for Macclesfield FC

Macclesfield FC - New F. Ball adhesive nets a quick result for Macclesfield FC

Ball, F and Co Ltd

Players at Macclesfield FC enjoyed a speedy win thanks to the help of Styccobond F58 PLUS. The ‘no time to wait’ adhesive made quick work of the installation of LVTs and rubber floorcoverings as part of the creation of a new state-of-the-art gym at the Leasing.com stadium.  Flooring contractors began the project with a subfloor moisture test, which indicated high Relative Humidity (RH) levels in the subfloor, necessitating a moisture management solution to prevent excess subfloor moisture attacking floorcoverings and adhesives, potentially causing floor failure. Having removed surface laitance and old paint from the concrete subfloor on the lower floor, the contractors carried out surface repairs using Stopgap 460 Exterior Repair fast-setting rapid repair mortar. A single coat of Stopgap F77 waterproof surface membrane created a barrier against the excess subfloor moisture. Once the waterproof surface membrane had cured, the surface was primed using Stopgap P141 primer for non-absorbent surfaces before the company’s Red Bag self-levelling compound was applied at a thickness of 3mm to provide a perfectly smooth base for floorcoverings.   Styccobond F58 PLUS was used to affix charcoal-grey, wood-effect Kährs Calder Herringbone LVTs to create a bold statement in the main weights, cardio and boxing rooms, and changing areas.  Throughout the gym, rubber floorcoverings were also installed at fitness stations, using the adhesive in its wet state, to provide a soft cushion underfoot for customers using the equipment.  Upstairs, contractors made necessary repairs, including filling day joints, before priming the subfloor, this time opting for Stopgap P131 general purpose primer. Due to high RH readings contractors applied Stopgap F78 waterproof surface membrane. Once cured, Stopgap Red Bag self-levelling compound was again used to create a base for subsequently installed LVTs, completing a premier workout area for strength and resistance and cardio machines.
Sponsored
Resilient 250 Installation below Carpet and Vinyl - Multiple Apartments in Watford, UK

Resilient 250 Installation below Carpet and Vinyl - Multiple Apartments in Watford, UK

Interfloor Ltd

Resilient 250 was installed as a Soft Floor Covering and bonded to the top of the concrete base. The acoustic underlay achieves the Approved Document E UK Building Regulations (The Resistance to the Passage of Sound) performance standards for Floor Type 1.Resilient 250 was bonded to the concrete base with the Sonixx SX900 adhesive in the living areas of 255 apartments. An 8mm PU foam underlay (Super 8) was loose laid over Resilient 250 and a Cavalier carpet stretch fitted on top.In the bathroom areas the Forbo Surestep Laguna vinyl was installed directly onto the Resilient 250 using F46 (Pressure Sensitive Acrylic Adhesive) from F. Ball and Co Ltd.Resilient 250 is a 2.5mm thick, high performing acoustic underlay manufactured using sponge rubber. It achieves an acoustic performance of 19 dB (ΔLw), significantly reducing the transmission of impact sound. It is a versatile underlay and can be used below various floor coverings including carpet, wood, laminate, luxury vinyl tiles, vinyl and ceramic / porcelain / natural stone tiles.The installers had nothing but positive feedback, on how quick and easy the underlay was to work with. At only 24 kg (43 lb) per roll, it is easy to distribute around site. The underlay therefore facilitated a simple, quick, clean and cost-effective installation.Features of Resilient 250:Extremely installer friendly; quick and simple to work with and easy to distribute around site.Ideal for use in Private Homes, Hospitality, Retail, Healthcare, Multi-Family Housing, Apartments and Hotels, Commercial developments, Care Homes, Schools and Education Projects.With a Thermal Resistance of 0.23 Togs, RS250 is excellent for use with underfloor heating systems.As it is manufactured from sponge rubber, it does not mark the walls unlike alternative rubber crumb underlays.Durable - provides long-lasting performance and will not deteriorate or collapse over time.Hygenic - naturally anti-microbial, anti-allergy and resistant to decay with low VOCs.
Sponsored
Snowhill Three

Snowhill Three

Excelsior Panelling Systems Ltd

The ProjectThree Snowhill is the final element of the Snowhill Plaza, forming part of Birmingham’s 20-year plan to redevelop Snowhill, known as ‘Vision 2030’, the largest ever speculative city centre office scheme built outside London. Featuring full height windows designed to take full advantage of the city views, and 32,000 square metres of space for office, retail, café and plant space, Three Snowhill stands as a landmark tower in this growing city The ChallengeWork alongside BAM design team to bring the clients vision to life. Bespoke Superloo facilities designed to include for boxed out mirror units with hidden services, solid surface vanity stations including soap, water and waste accessories. Coordinate delivery and installation in-line with the programme dates and in harmony with associated trades on site The SolutionExcelsior have proudly worked alongside BAM construction and Weedon Architects to bring this vision to life. Working to innovative specifications we have fitted out this office space with a combination of Flush 44 Natural Wood Veneer WC Cubicles and Superloo, all complete with stylish solid surface vanities, hidden waste disposal, and boxed out mirrored wall units housing paper towel dispensers. Building bespoke specifications, we ensure we are delivering exactly what both the customer and specific scheme requires. Here, our bespoke service has allowed for a beautiful high-end installation for optimal use in this landmark business location.Client:Snowhill Building ThreeContractor:BAM ConstructionArchitect:Weedon ArchitectsLocation:Birmingham SnowhillSpecificationProduct Range: Flush 44 Natural Wood Veneer CubiclesDoors: Natural Wood Veneer bonded onto 44mm MR Core, Excelsior ‘Toasted Oak’ VeneerPilaster: Natural Wood Veneer bonded onto 44mm MR Core, Excelsior ‘Toasted Oak’ VeneerPartition: HPL bonded onto 36mm MR Core, Excelsior White c/w Hardwood Oak Rebated JointIronmongery: SSS Stainless Steel
Sponsored
Saige Gripsure Gogmore Farmpark, Chertsey

Saige Gripsure Gogmore Farmpark, Chertsey

SAiGE Longlife Decking

Saige Gripsure boards in Grey have been used on a small footbridge at Gogmore Farm Park in Chertsey, Surrey. The client was looking for a non-slip option with minimal maintenance requirements on this high footfall area in the farm park. The wood grain effect of the board sits beautifully in the natural surroundings.
Sponsored
GlaxoSmithKline: Bespoke lifting from Penny’s for ground-breaking ‘Factory in a box’

GlaxoSmithKline: Bespoke lifting from Penny’s for ground-breaking ‘Factory in a box’

Penny Hydraulics Ltd

Penny Hydraulics has partnered with design and operations consultancy Bryden Wood on an ambitious and ground-breaking construction project for pharmaceutical giant GlaxoSmithKline which has resulted in estimated construction cost savings of 30% and a build time reduction of two months when compared to traditional building methods.
Sponsored
Mjøstårnet World Tallest Timber Building

Mjøstårnet World Tallest Timber Building

SIGA Cover AG

Local resources, local suppliers and sustainable wood-based materials were the requirements for this 18-storey building in Brumunddal. Located 140 km north of Oslo, Mjøstårnet is tallest cross laminated timber (CLT) building in the world and is celebrated by the international construction industry as a first-class engineering achievement.
Sponsored
Residential Building

Residential Building

Ash & Lacy

As a consequence of the Grenfell tragedy, an assessment of the building envelope was carried out on the 275nr residential apartment block in the centre of Leeds. It was found to be non-compliant with current regulations and in urgent need of replacement.The VariAL-SF system was selected as it complied with an A2 fire rating, with EN13501-1 classification by third parties, and satisfied the detailed planning constraints.The importance of the cladding refurbishment and replacement on this high-rise residential building cannot be understated. The building was identified by West Yorkshire Fire & Rescue Service late in 2019 as being high risk from the perspective of residents safety, due to the fact it was clad in flammable panels and onus was placed on the building owner to take swift action to make the building safe. As such, an ambitious 52 week programme for complete removal of the existing cladding and replacement was set out and achieved by the project team, despite significant limitations in terms of access and logistical challenges.To the passer-by, there is barely any discernible difference in the aesthetic of the building’s new facade, the colour-matching of the panels is incredibly accurate and allowed for a seamless transition to a much safer environment for the building’s residents.The apartment block was in the middle of a built up residential area. The contractor needed to obtain road closures from Leeds city council for two main roads which ran the full length and one side elevation.Furthermore the other main elevation was a pedestrian walkway with access to the apartment block , a hotel and several commercial buildings therefore safe access routes and segregation had to be installed and coordinated with the various parties involved.In addition, the building had to be reclad using 125ft cherry pickers working off the main road and pedestrian walkways therefore protective tracking systems had to be laid over the tarmac and paving to protect the existing materials.Throughout the building refurbishment, which took exactly 52 weeks, access to all the various buildings was maintained and contractor site personnel worked closely with adjacent building owners and especially the management team of the apartment block which accommodated 270 apartments to ensure minimal disruption.
Sponsored
Dobbies Garden Centre, Antrim

Dobbies Garden Centre, Antrim

Tobermore

The ProjectDobbies, the UK’s largest garden centre retailer, has officially opened its store at The Junction Retail and Leisure Park in Antrim.The 110,000ft flagship store is Dobbies’ second venture in Northern Ireland. This is the largest store in Dobbies’ UK portfolio with outdoor and indoor plant areas, pet, gift, and toy departments, as well as a cook shop and home décor area, a food hall, a children’s soft play area and new restaurant and coffee shop.Tobermore’s Sienna block paving in Silver was used in the flagship store to create a sleek, contemporary look. The striking aggregate finish to the paving perfectly compliments the modern exterior of the building. For the area around the new bowling green. Due to the level of expected footfall, it was important to consider hard-wearing but aesthetically pleasing paving options. The ChallengeModern paving was required for the retail development. Situated in The Junction Retail development in Antrim, and with a massive £10m invested, the 110,000ft2 store is the largest in Dobbies UK portfolio. To complement the modern aesthetics of the retail store, Dobbies sought hard landscaping to amplify the fresh contemporary feel. The store is expected to attract a footfall of around one million visitors per year. With that in mind, ensuring high quality, durable paving was used throughout the project was imperative. In addition to aesthetic and performance desires for the project and with sustainability in mind, Dobbies decided they wanted to source products locally to reduce their carbon footprint.The SolutionTobermore’s Sienna block paving in silver created a sleek, contemporary look. With a wide array of products all locally sourced, Tobermore was the chosen manufacturer to supply Dobbies with a hard landscaping solution which surpassed both aesthetic and performance expectations. Sienna block paving in Silver was used for the 3960m2 area in the retail store. Both areas, interior and exterior were paved with the striking aggregate finished product. Gerard Boyle, Senior Architect at Gray Design said “We chose Tobermore Sienna block paving due to it being produced locally, thus reducing its carbon footprint. We also wanted to support the local economy and Tobermore had a great selection of colours and products to choose from.”
Sponsored
Qatar Airways, Conduit St

Qatar Airways, Conduit St

Albion Stone plc

The new building reflects the ideology of Qatar Airways and provides a contemporary office and new retail showroom.The new project replaces two late 1940s/early 1950s buildings.Albion Stone supplied Portland Grove Whitbed in block form which was produced into cladding and installed in a ‘wing’ pat.
Sponsored
St. Mary's Church Selby - N. Yorkshire

St. Mary's Church Selby - N. Yorkshire

Hafele UK Ltd

Specification / scenario -Traditional Church building requiring discrete but effective access control and partition without spoiling the ambiance of the Church interior. A glass partition was needed to limit access at certain times of the day whilst not blocking out light. Maintaining the light intensity was a key factor in design brief.
Sponsored
Rosther Hill Developments, Beswick Green

Rosther Hill Developments, Beswick Green

Tobermore

Developed by Rosther Hill Developments, Beswick Green is a period-themed development in Staffordshire. Lord and Lady Stafford of Swynnerton selected Tobermore’s Tegula Trio block paving and Kerbstone kerbing for the hard landscaping element of the site due to the products aged, antique aesthetics that complemented the traditional surroundings beautifully.
Sponsored
Architectural freedom of design

Architectural freedom of design

RENOLIT Cramlington Ltd

Lightweight but very strong mounting profileCHALLENGEStraight lines, maximum light and a unique, remarkable design. This is how independent architect Lieze Vandael saw her own home. Due to the numerous voids and imposing windows up to 9 meters high, a traditional construction method was certainly not an option. A suitable alternative had to be found. Moreover, Lieze Vandael wanted to see the elegant, minimalist architectural style with straight lines envelop the building: a roof and façade finish in the same material - preferably timber - and moreover, seamlessly blending into each other. To have the building completely wrapped in wood. Definitely a real challenge! A neat and watertight connection between roof and façade is not an easy job at all. Besides, timber is never completely waterproof. So, the challenge for Lieze Vandael was to combine the roof and the façade into one uniform surface, ensuring a perfectly watertight roof.SOLUTIONArchitect Vandael wanted to step away from the traditional lightframe wood structure, and opted for an alternative mass timber construction: a load-bearing construction formed from tongue and groove stacked solid wood beams. After all, this type of construction creates a lot of possibilities and is, besides, a more durable and ecological solution. For the exterior finish of the building the architect chose thermowood Ayous, a knot-free, clear-grade exotic hardwood providing excellent durability. The façade was finished with thermowood in a traditional way. Finishing the roof, however, was a more complex task. Cladding a roof with timber, particularly a highly sloped roof poses a substantial risk. How to achieve a watertight roof?

Showing 1189-1224 of 1520

Feedback