NBS Source
I'm a manufacturer

"platform lifts"

394 results found

Sort by:

Showing 73-102 of 102

Sponsored
Space-saving Passenger Lift Ups Access in New School Extension

Space-saving Passenger Lift Ups Access in New School Extension

Stannah Lifts

To supply and install a space-saving passenger lift in a new extension to St John The Baptist Primary School in Penistone, a market town and civil parish in South Yorkshire. Completed in 2019, the new building houses supplementary classroom facilities vital for this thriving, voluntary aided C of E school with 548 pupils in the 3-11 age bracket.
Sponsored
Delivering accessibility to the New Carlsberg Foundation

Delivering accessibility to the New Carlsberg Foundation

Guldmann Limited

The New Carlsberg Foundation is housed in the old brewery yard on Brolæggerstræde, where both J. C. Jacobsen and his son Carl were born, and which was home to the original Carlsberg brewery.In autumn 2016, Stepless was approached by ELGAARD Architecture, which had been contracted to renovate and modernise the New Carlsberg Foundation’s headquarters, located on Brolæggerstræde in Copenhagen.The architecture firm asked Stepless to design an elegant and discreet solution consisting of a lifting platform that would fit with the historic building and the surrounding courtyard. In addition to providing accessibility for visitors with reduced mobility, the purpose of the solution was primarily to facilitate the process of moving sculptures from street level and into the building.
Sponsored
50-60 Station Road  Cambridge

50-60 Station Road Cambridge

Ibstock Telling

Working in collaboration with façade specialist Dane Architectural enabled the design to be developed towards a light weight facade solution that combines GRC fin shaped columns and feature beams fixed directly over areas of the curtain wall grid system at locations where insulated panels were present.This strategy had several advantages, in the first instance a weather tight structure was provided early on in the programme, whilst the GRC facade option provided a much lighter solution that provided significant savings in both cost and time. The access strategy, based on mast climber platforms adapted to include lifting beams, enabled glazing and GRC panels to be hoisted swiftly into position.
Sponsored
Weigh Cabin Platform & Steps, Birmingham

Weigh Cabin Platform & Steps, Birmingham

Rapid Ramp Limited

PROJECT BACKGROUND: The construction of weighbridges and a weigh cabin.The cabin will be elevated 1.5m above ground level on support columns.Lorries will drive up to the cabin for initial checks before the weighbridges are used to calculate the load by weighing the lorry when empty and when loaded.REQUIREMENT:A walkway around the cabin in a L shape with steps to allow the site operatives access. ADDITIONAL INFORMATION:2D and 3D CAD drawings were created by our designer in-house. These were given to the client with their quotation.END RESULT: A Rapid Ramp platform was raised around 1.5 metres high and included steps. The appropriate height was reached with adjustable telescopic legs. Plus, cross bracing was achieved using longer length tubes to ensure rigidity under all platform legs.The system was completed within a quick three-day turnaround time.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of a step or level change.Trombone Ends - these are added to the ends of a step unit to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour: Black - Black is the standard handrail colour. Handrails are powder-coated to create a durable finish that is tougher than conventional paint.
Sponsored
Loading bay lift

Loading bay lift

TRANSLYFT UK LIMITED

Loading bay lift for distribution centre
Sponsored
Hornsey Town Hall Redevelopment

Hornsey Town Hall Redevelopment

Sheridan Lifts

9 New Lifts on a Multi-Purpose Conversion Site
Sponsored
Tesco Express Store - Shaw, (near Rochdale).

Tesco Express Store - Shaw, (near Rochdale).

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Access – Bespoke access platforms. Services: Existing condensers. Roof build-up: Existing warm roof design (bituminous felt) – Overlaid with a liquid applied plastic waterproofing layer. An operational Tesco Express store, in the heart of the Shaw community, that had existing high level rooftop condensers requiring annual maintenance. Pump House supplied a safe access solution around two existing high level condensers. Pump House carried out a site survey and provided full working AutoCAD drawings for approval. The access solution was manufactured in smaller modules which facilitated easier lifting and fitting. Pump House attended site on the day of installation.
Sponsored
Stannah passenger/goods lifts remaster access and goods movement in massive regeneration of EMI’s The Old Vinyl Factory

Stannah passenger/goods lifts remaster access and goods movement in massive regeneration of EMI’s The Old Vinyl Factory

Stannah Lifts

A triplex of customised Stannah lifts are delivering vital office access and goods movement in the Record Store, an Art Deco, former record-pressing factory and part of the £250m regeneration of The Old Vinyl Factory, erstwhile home of record label EMI, in West London. The triplex operates in wall-mounted shafts in the spacious lift lobby, an integral part of the compact, central core. Their design supports an efficient blueprint, also minimising the structural impact on the building. This core also doubles as a fire-fighting shaft, comprising a firefighting stair, mechanically ventilated firefighting lobby and a firefighting lift.
Sponsored
Stannah at Leeds Station Southern Entrance

Stannah at Leeds Station Southern Entrance

Stannah Lifts

The southern entrance to Leeds Station features four Stannah escalators and two passenger lifts. The four escalators provide continuous vertical transportation for ambulant people. Those travellers with heavy luggage, child buggies or wheelchair-users are well provided for with two bespoke 13-person traction passenger lifts located just inside the entrance.
Sponsored
Playing pack horse in top toy store

Playing pack horse in top toy store

Stannah Lifts

It seems that The Entertainer – the biggest independent toy retailer in the UK – cannot get enough of Stannah’s Goodsmaster range of goods lifts. Muscling up all over the UK, Goodsmaster goods lifts have gone into multiple branches of The Entertainer, from Didcot, Lancaster and Newport (Isle of Wight) to Rugby, Cardiff, Chester, Sunderland and Bexleyheath – with another to come in 2013 in Witney, Oxfordshire. The bespoke, hydraulic-drive Goodsmaster 500kg goods lift recently installed in the Bexleyheath outlet demonstrates Stannah’s design flexibility.
Sponsored
Gatwick Station Platforms 5-7 Upgrades

Gatwick Station Platforms 5-7 Upgrades

Sika Limited

The UK’s second busiest airport, Gatwick Airport, is also home to a rail station which handles in excess of 20 million passengers annually – making it one of the 10 busiest stations in the UK outside of London.Network Rail are currently managing a redevelopment project at Gatwick station, which is being delivered by Costain. Part of this project is a new concourse for the station.The redevelopment of the station includes improvement works to create a larger, more accessible interchange between the station and airport. As part of the upgrades to platforms 5-7, Costain worked with Sika waterproofing products and Hanson for the concrete mix to ensure the rebuild was robust and would offer significant longevity.
Sponsored
Stannah Passenger Lifts Up Access in Multi Award-winning Listed Conversion

Stannah Passenger Lifts Up Access in Multi Award-winning Listed Conversion

Stannah Lifts

A trio of Stannah Maxilift motor room-less passenger lifts has delivered residential access for all at King Edward VII Estate, West Sussex. Completed in 1906, this Grade II* listed former sanatorium has been renovated and converted into 162 sumptuous apartments, duplexes and communal facilities set within eight acres of Registered Gardens in the South Downs National Park, with full resident access to the 165-acre estate. Original features have been restored, conserved and further enhanced with über-modern updates to include the three Stannah 8-person, motor room-less (MRLi) Maxilifts supplementing stair access over three and five floors.
Sponsored
Triton watertight concrete waterproofs lift shafts

Triton watertight concrete waterproofs lift shafts

Triton Systems

Triton Systems approved contractor, British Damp Proofing, installed products supplied by Triton Systems to waterproof two lift shafts in a development of 25 dwellings. Triton Bentonite Membrane was used to waterproof the lift slab base and kicker, which were poured using concrete made waterproof with Triton TT Admix. Triton's Adcor waterbar was then installed on to the kicker.
Sponsored
Waverley House, Soho

Waverley House, Soho

Rapid Ramp Limited

REQUIREMENT: A modular step unit and upper landing to the basement goods lift.The new system would replace the narrow concrete steps, which were concluded to be unsafe and didn’t have handrails to prevent falls.ADDITIONAL INFORMATION:A site survey was carried out, and an in-house 3D ramp design was drawn to suit the space.The drawing shows that the air conditioning unit above the step unit would need to be moved 200mm away. END RESULT: We installed a yellow modular system straight over the existing steps within a few hours.This approach prevented the concrete steps from being removed and saved the client the extra time and money involved in hiring another trade to complete the enabling works. A bespoke platform joins the upper landing, and the feet were fixed into the concrete floor to keep the system securely in place.FEATURES INCLUDED:Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Standard Colour: Yellow – one of the easiest colours to see because of its ability to reflect light. The handrails are powder coated to create a durable finish that is tougher than conventional paint.Standard Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
JD Sports, Liverpool One

JD Sports, Liverpool One

Stannah Lifts

On the strength of the successful installation of a Stannah A2S down-escalator in the Slough branch of JD Sports, Stannah were once again approached to quote for their three-storey Liverpudlian store. As a result, two Stannah A2S escalators (one up, one down), an exclusive 8-person Maxilift MXL passenger lift and four 50kg Microlifts, for the transport of smaller merchandise between stock rooms and fitting floors, now provide all people- and goods-moving requirements within this thriving outlet.
Sponsored
Three reliable heavy goods lifts supporting an experienced transportation company

Three reliable heavy goods lifts supporting an experienced transportation company

Lödige Industries

Resilient, flexible and reliable lift solutions enable logistics services in ZurichIn 2018, Welti-Furrer approached Lödige Industries to install three OLYMPUS heavy goods lifts at their newly build logistics facility in Dielsdorf near Zurich. Logistics service providers and transportation companies are two important service providers across the globe. They ensure that all goods are always reliably and safely in the right place at the right time. Welti-Furrer has been on the road since 1838. As one of the oldest transport companies, Welti-Furrer relies on over 180 years of experience and is therefore very familiar with the central challenges and requirements of lift solutions.Long-term advantages with resilient lift solutionsForklift drivers in logistics centres work highly efficient and at a fast pace. Therefore, it is not possible to completely avoid damage to the facility equipment. However, a large part of the damage can be avoided through intelligent planning of the lift solution. One of the main reasons why Welti-Furrer decided for lift solutions from Lödige Industries is the generic strong resilience of the OLYMPUS heavy goods lift.In addition, other aspects of the lift design were optimised in order to further increase the robustness of the lifts. The wall soffits in the prefabricated concrete shafts were intentionally built smaller than the clear cabin width, thus protecting the whole cabin floor from damage. The outer trays are offset inwards so that they are protected from damage by forklift trucks or similar.Flexible use thanks to integrated card reading systemNext to the resilience of the installed heavy goods lifts, the local service team from Lödige Industries ensures high reliability at any time.Furthermore, in order to maintain the highest flexibility standards, the installed OLYMPUS heavy goods lifts were equipped with an internal card reading system. This functionality allows Welti-Furrer to define individual access rights for their employees.SolutionWelti-Furrer decided for lift solutions from Lödige Industries because of the generic strong resilience of the OLYMPUS heavy goods lift.Several aspects of the lift design, such as the wall soffits and outer trays were optimised in order to further increase the robustness of the lifts.The local service team from Lödige Industries ensures high reliability at any time.The integrated card reading system allows Welti Furrer to define flexibly use the goods lifts.
Sponsored
Stannah - supporting luxurious service in top London events venue

Stannah - supporting luxurious service in top London events venue

Stannah Lifts

A Stannah Maxilift MRLi motor room-less passenger lift and Goodsmaster CD chain drive goods lift are the moving solutions of choice for Meridian Grand, a luxury banqueting, conference and events venue in Edmonton, North London. Both Stannah lifts help Meridian Grand deliver a first class service, whether this is for small, intimate gatherings or large, corporate occasions – from weddings to big-number fund raisers – all in opulent surroundings that are the hallmark of this family run business.
Sponsored
Successful Installation of a Home Lift in a Private Home in Johannesburg

Successful Installation of a Home Lift in a Private Home in Johannesburg

Vimec SRL

Vimec, partnered with a trusted local home lift installation specialist to successfully install a home lift with 2 stops in a private home located in Johannesburg, South Africa. The project involved the integration of a white steel structure and a cabin with two glass walls, resulting in a seamless and elegant addition to the homeowner’s residence. This case study highlights how Vimec’s partner effectively addressed the client’s needs and exceeded expectations.
Sponsored
Gabion seat platforms for Begbroke Science Park, Oxford

Gabion seat platforms for Begbroke Science Park, Oxford

Furnitubes International Ltd

Begbroke Innovation Centre - the new multi-use building at Begbroke Science Park will help small and medium-sized science businesses take their projects to market, and provide facilities for researchers from the University. The open space outside the new building comprises of a number of straight and curved gabion walls, which on their own do not provide any suitable seating for users. Furnitubes supplied a number of Lapa gabion seat and bench platforms for the new building, which were installed on the gabion walls outside the facility offering new comfortable seating provision for everyone.
Sponsored
Lifting the lid on sensory design

Lifting the lid on sensory design

Geberit Sales Ltd

Awareness of mental and physical wellbeing has never been greater, yet many of us are spending more time than ever online – and it’s taking its toll. Here, Sophie Weston, channel marketing manager at Geberit, lifts the lid on the role that the bathroom has to play in helping us escape from our ‘always-on’ world and examines the importance of considering each of our senses in creating the perfect sanctuary.
Sponsored
Easy installation of goods lift making transport more comfortable for German Wholesaler

Easy installation of goods lift making transport more comfortable for German Wholesaler

Lödige Industries

Lödige installed ESCORTA goods lift in Bad Hersfeld, GermanyAt the end of 2015 a passenger and goods lift was installed for Libri. The customer needed a lift which would enable the transportation of goods and passengers up to 9.5 m with 4 stops. Furthermore, it was required to find a solution to easily install within an existing warehouse. ESCORTA from Lödige was the perfect answer for the customer’s needs and structural requirements. The lift is delivered as a free-standing structure and does not require any pit. Therefore the installation was quick and easy. Additionally thanks to its new certification (European Machinery Directive 2006/42/EG und DIN EN 81-41) multiple persons can now simply ride in the lift with their goods to the desired floor. This increases the level of comfort, making transporting goods between levels much easier and more pleasant.ChallengesA solution was searched to transport goods and passengers at once.A compact solution was needed which did not require a lot of space and could be easily integrated into the existing warehouse.The lift had to meet individual needs of customers referring to the structural conditions in the warehouse.Solution and benefitsESCORTA goods only lift from Lödige does not require any pit and is delivered as a free-standing lift structure, thus it was easily installed into the already existing warehouse.The lift was offered as a tailored made product – exactly meeting the requirements of the customer.In the ESCORTA goods lift multiple persons can ride with their goods to the desired floor level.
Sponsored
Aluminium work platforms for industrial tipper trailers

Aluminium work platforms for industrial tipper trailers

Elefant Gratings T/A PcP Gratings Ltd

The project was to provide an existing system with the new solution that offers high slip resistance according to evaluation group R13/V10* and to make it processable for a series production. For the new work platform on the trailers, a high-quality standard was to be achieved.The task included strict criteria for using recyclable metal with a minimum of waste without compromising with quality. Furthermore, the platform solution needed to achieve a very high standard in terms of quality with an outstanding finish and dimensional accuracy. outstanding surface finish and dimensional accuracy.The solutionAluminium floors for tipper work platforms “From coil to finished product”Optimal production technology in combination with high-performance materials enables production "from the coil to finished product" in terms of reproducible quality / extremely high dimensional accuracy / a perfect surface finish and economical production.In cooperation with our customer and our suppliers in the field of material and surface protection, we have developed a solution that allows us to develop an aluminium floor for the working platform on our customer's tipper trailer, true to our motto of manufacturing "from the coil to finished product".Due to our production technology of a sequence of several processing steps on a production line, we were able to develop a new floor for the working platform on our customer's tipper trailer using surface profiling (PcP Safety Grating Type US), we were able to achieve the slip-resistance classification required by the customer and certification by the Institute for Occupational Safety and Health (IFA in Sankt Augustin) - according to evaluation group R13/V10. Furthermore, the tools and materials used have enabled the process accuracy and the processing speed to be optimized and improved to a large extent. In particular, the excellent cooperation with our material suppliers (special foils in order not to contaminate the tools with foil residues) enabled us to achieve a perfect surface finish as required by the customer. Further processing is therefore not necessary and minimizes operational ways and resources.Quality assurance of products and series productionDue to the process-guided production, only the slightest deviations from the specified dimensional and quality requirements are possible. These are monitored and documented by instructed personnel and employees trained in the area of quality at specified inspection intervals. In particular, the product test bench set up for this purpose enables our employees to carry out a comprehensive test on the component and immediately correct deviations in series production.The resultCustom made flooring meets the strictest safety criteria for tipper trailersDue to the partly optimized tool technologies and adapted or partly new procedures and processes, the requirements of our customer's specifications could be fulfilled to 100%. The requirements of the employers' liability insurance association and occupational health and safety could be achieved with a certification (IFA) according to slip resistance class R13/V10. This decisive requirement was accompanied by the demands for process-optimized series production while meeting the requirements for dimensional accuracy and perfect surface finish.As a result, we are confident that we can supply our customers with a product that lives up to their name and market position.
Sponsored
Revving up accessibility in York

Revving up accessibility in York

CIBES Lift UK

Disabled access was the driving force behind a leading motorcycle company’s decision to ramp up facilities at its new showroom. It’s been a year of success for Barrie Robson Motorcycles, a well-known prestige motorcycle dealer and BMW franchise in York. But with a newly-built premises the company needed to ensure that it gave disabled customers and staff top quality access by installing a Cibes UK lift. Kevin Fairburn is manager and joint owner at the dealership that opened its new headquarters a year ago after 30 years in business.
Sponsored
Customised goods lift matching corporate colour of Pink Hippo Self-Storage

Customised goods lift matching corporate colour of Pink Hippo Self-Storage

Lödige Industries

Customised goods lift matching corporate colour of Pink Hippo Self-StoragePink goods lift with attendant for Self-Storage Centre in ReadingIn 2018, Lödige Industries has supplied a customised goods lift in bright pink for the new Pink Hippo self-storage building in Reading. The ESCORTA goods lift with attendant adds the wow factor in colour and comfort to the Pink Hippo self-storage facility in Reading, London.About the project and buildingThe self-storage industry continues to grow in the UK. Following the success of their self-storage facility in Leatherhead, Pink Hippo has decided to open a new facility in Reading. To enable maximum storage opportunities, the new building offers spaces on two levels.Pink Hippo realizing goods transport and matching corporate colourThe Pink Hippo storage facility provides self-storage spaces on two levels for several items that need to be stored temporary. Whether the scooter is to be stored over the winter, a longer stay abroad is planned or winter clothes need a place to “over-summer” – the self-storage market is evolving in the UK. To ensure that even bulky goods find a safe and reliable way into their storage boxes, a goods lift needed to be integrated. Most importantly, the customer Pink Hippo wanted the goods lift to match the bright pink colour theme of the self-storage facility.Lödige Industries installed an ESCORTA goods lift with attendant. The lift is designed to carry up to 1,500 kg in storage items between two storage levels. The large capacity and brightly lit cabin of the lift removes the need for centre users to carry their goods through staircases. Traveling with the goods in the lift storing becomes much easier. Relying on an in-house paint shop, Lödige was able to perfectly match the corporate pink colouring and delivered its first goods lift pretty in pink. About the customerLeander Ltd T/A Pink Hippo self-storage is a British self-storage provider in south-west London. The company provides three self-storage facilities in Leatherhead, Reading and Central Dorking. They offer confidential, secure and cost-effective commercial storage, storage units for students and for personal use as well.Challenges for Pink Hippo Self-StorageTo ensure that even bulky goods find a safe and reliable way into their storage boxes, a goods lift needed to be integrated.The customer Pink Hippo wanted the goods lift to perfectly matches the bright pink colour theme of the self-storage facility.Providing goods transport pretty in pinkLödige Industries installed an ESCORTA goods lift with attendant, designed to carry up to 1,500 kg in storage items between two storage levels.Relying on an in-house paint shop, Lödige was able to perfectly match the corporate pink colouring and delivered its first goods lift pretty in pink.“The Lödige ESCORTA goods lift has added the wow factor to our Reading unit. Customers love the colour and how easy it is to use. The sales and installation process was smooth running with no issues. It only took 10 days for installation, I am really happy with the finished product.”- Eddie Shepherd, of the Leander Group T/A Pink Hippo
Sponsored
LiteFlo® Lightweight Flowing Screed | Harold Wood Station | Capel CS Ltd

LiteFlo® Lightweight Flowing Screed | Harold Wood Station | Capel CS Ltd

SMET Building Products Ltd

Smet Supported Partners, Capel (CS) Ltd, completed the floor screed application of SMET LiteFlo® Lightweight Flowing Screed within the improvement works at Harold Wood Station.  A number of improvements were delivered at Harold Wood station in preparation for the new Elizabeth line service, including:A new footbridge over the tracks with new staircasesThree new lifts to provide step-free access to every platformPlatform extensions to accommodate the new, 200m long Elizabeth line trainsNew platform lightingNew station signage, help points, customer information screens, and CCTV.SMET LiteFlo® Lightweight Flowing Screed is a high-quality pumpable, factory-produced, CE marked, self-levelling screed based on calcium sulphate.German-made SMET LiteFlo® is unique because it’s the first pumpable lightweight flowing screed available. Made from specially selected aggregates - means it’s 30% lighter than conventional flowing screeds and can be laid in reduced thicknesses. The screed offers a high yield, 43kg per m2 @ 40mm.German-made LiteFlo® is unique, in that it’s the first pumpable lightweight flowing screed. Made from specially selected aggregates, makes it 30% lighter than conventional flowing screeds and therefore 70% lighter than traditional sand & cement – ultimately this means less is required per m2. Another plus is that that screed made from Calcium Sulphate has naturally substantially lower embodied carbon emissions than a sand and cement screed. LiteFlo® complies with EN 13813: 2002, is CE-marked, and is available in 27Kg bags or bulk silos.Have a look at the Northern Builder MagazineTop 5 Liquid Screeds Article.  Read about SMET LiteFlo® in the Irish Construction News.Whether your job is – self-build, retro-fit, floor renovation or repair, design floor, commercial or shop, sustainable build, historical renovation, ECO build, Lightweight, or an industrial flooring venture – SMET has a flooring compound or ready to use product suitable for your application.www.smetbuildingproducts.com or www.smet.ie
Sponsored
“Oyez! Stannah brings modern access to historic town hall!”

“Oyez! Stannah brings modern access to historic town hall!”

Stannah Lifts

Once again, Stannah has plenty to shout about when it comes to updating access in heritage buildings – with the installation of a Maxilift 2.0 MRL (motor room-less) passenger lift in the historic town hall in King’s Lynn, Norfolk. By bringing access for people of all mobilities to facilities ranged over two floors, this hydraulic, 8-person lift helps the town hall maintain its 800-year history at the heart of civic life.
Sponsored
Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouse

Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouse

Lödige Industries

Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouseThe top online fashion retailer improves its productivity, efficiency and safety to meeting higher market demandsOnline orders for the fashion industry have significantly peaked over the last few years, making fashion retailers recognise the need to expand their warehouses. The international and rapidly growing fashion brand has opened a new warehouse in Litchfield to supply their multinational customers efficiently and on time. In 2021, Lödige Industries was contracted to design, manufacture, deliver and install one SHERPA and one ESCORTA goods lift for the new facility. Installation work of the goods lifts was accomplished in November 2021, while the rack system will be finished afterwards.Optimizing space and serving each mezzanine floor efficientlyDue to the increasing number of online orders, the international fashion retailer needed an efficient and space-saving lift solution. The client envisioned a multi-level storage solution, to fully utilise the available warehousing space.Lödige Industries in the UK decided to implement large goods lifts as a solution to access each floor. The free-standing SHERPA and ESCORTA goods lifts fully automate the transfer of goods across five and six floors and were easily integrated into the rack system. The two lifts have been configured specially to help the flow of goods in the building. They have been fitted to align with their vast increase in orders, facilitating their constant success globally. Overall, the cabin sizes of the goods lifts allow the customer to fit all their equipment in the shaft without any disturbances between different stops.Safety and security are key priorities for the customerSafety for employees in installation and operation of goods lifts is one of the key priorities for the fashion brand. Therefore, engineers from Lödige Industries installed the goods lifts in line with Machinery Directive 2006/42/EC. It contains guidelines to minimise any injury to the user or people close to the machine. It specifies the maximum gap in a guard and directives regarding the lift such as lift speeds for different applications, alongside many other guidelines.For the ESCORTA, Lödige Industries fitted a bumper rail to protect the emergency stop button from being damaged. Additionally, rumble strips were installed to prevent the trolley from moving and maintaining the smooth running of the lift. As a result, this reduces downtime of the goods lifts, the amount of call outs and allows them to be more cost efficient.Consistent site coordination to apply the best lift solution for the customerThe biggest challenge for the customer was the limited space available for the goods lifts. Consequently, the customer required a lift solution to fit between the steel building columns and respecting all other work and storage areas. This made the sizing of the lifts become complex.In close collaboration with the customer, the efficiency of the building was maximised by optimising both, general goods flow and use of space within the goods lifts areas. The constant coordination and communication between the customer and Lödige Industries allowed a precise location for the lifts within the space available.SolutionIn order to save space and meeting the available space restrictions, free standing goods lifts were attached to the rack system.The applied safety measurements reduce downtimes of the goods lifts, the amount of call outs and allows the customer to operate more cost efficient.Close collaboration between the go-to fashion brand and Lödige Industries enabled the customer to optimise goods flow while respecting all site specifications.
Sponsored
Forbury Place, Reading. Fire Curtains over Lift Doors

Forbury Place, Reading. Fire Curtains over Lift Doors

Coopers Fire Ltd

Coopers installed FireMaster fire curtains with smoke control over the lift door openings on each of the ground and upper seven floors and two on the basement so a total of forty eight curtains. An important part of the design of the building on the ground and first floor was to subtly integrate the fire curtain headbox and side guides into the lift opening.
Sponsored
A £multi-million revamp at Birmingham New Street

A £multi-million revamp at Birmingham New Street

Stannah Lifts

To help meet the people and goods movement needs throughout the station and the integral Grand Central Birmingham Shopping Centre (formerly the Pallasades), Stannah Escalators & Moving Walkways joined forces with Stannah Major Projects to supply, install and commission 41 lift and escalator products, including bespoke models, to ensure step-free Access for All (AfA) throughout – whilst keeping the station fully operational.
Sponsored
Clapham Junction Station

Clapham Junction Station

dormakaba UK & Ireland Ltd

dormakaba helps provide ‘Access for All’ at £14.5M Clapham Junction Station refurbAs Europe’s busiest railway station with 41 million trains passing through each year, Clapham Junction welcomes hundreds of thousands of passengers onto its platforms every day. Delivered by Network Rail with main contractor Osborne, the improvement package makes the station fully accessible for all passengers, including those with reduced mobility, heavy luggage or children.dormakaba's contribution to the projectDelivering smooth operation and closing reliability in all weathers and seasons, dormakaba’s ED 100 swing door operators proved perfect for the entrance‘s new automatic doors.During in-house testing at temperatures of -15°C, the ED 100 was proven to provide full performance, and reliable closing. Also equipped with dormakaba Wind-Load Control, the ED 100 swing door automatic operator can recognise and compensate for wind loads with a force of up to 150 N (maximum admissible force) making it the perfect solution for doors subjected to high winds and extreme temperature.As part of the major improvement works, dormakaba FFT folding space saving doors completed the construction of the brand new ticketing facilities, travel information screens and toilets in a fully-refurbished ticket hall.For the entrance to the new lift lobby at Platform 17, dormakaba supplied the ES 200 sliding door operator. Easy to install and set-up, it features a powerful motor and a dynamic acceleration/deceleration control capability to ensure reliable operation. The operating performance of the ES 200 is matched by its clean design that complements any building.

Showing 73-102 of 102

Feedback