NBS Source
I'm a manufacturer

"leadwork contractors"

1,775 results found

Sort by:

Showing 793-828 of 1096

Sponsored
Saxton Lane

Saxton Lane

Cemfloor Liquid Screeds

Project Name:Saxton LaneProject Location:LeedsMain Contractor:Torsion ConstructionCemfloor Installed By:B & K SystemsProduct Used:Cemfloor C25Saxton Lane is made up of two residential tower blocks in the heart of Leeds.The 18 and 22 storey tower blocks contain over 300 apartments on the former Alton Cars Showroom site, in an area that is currently enjoying substantial investment and economic growth.Cemfloor C25 was chosen for this project thanks to its many benefits including;Reduced drying time compared to other screedsCement based screed that is compatible with all cement based adhesives; including fast track systemsEasy Installation which reduced time and costsFoot traffic allowed after 24/48 hours which meant other aspects of the project could continue
Sponsored
M4 Junction 3-12 Motorway Upgrade

M4 Junction 3-12 Motorway Upgrade

Cordek Ltd

The M4 Junction 3-12 motorway upgrade project, which started construction in July 2018, is designed to increase capacity, and reduce congestion between Junction 3 (Hayes) and Junction 12 (Theale). In the sections where there is no pre-existing hard shoulder for conversion into an additional running lane, a total of 11 overbridges needed to be demolished and replaced with longer decks to enable continuity of the widened carriageway. The £848m project is due for completion in Spring 2022, by which time it is expected that approximately 680,000t of material will have been excavated, 1.8M.m² of new surface laid, 130km of cabling installed and 63km of concrete barrier positioned. Cordek were approached by the Principal Contractor Balfour Beatty VINCI joint venture to provide a lightweight structural fill solution to be used for the embankment construction adjoining the Datchet Road Overbridge, between Junction 5 and Junction 6.
Sponsored
Heythrop Park

Heythrop Park

CAT (Carpet Accessory Trims) Limited

Project: Heythrop Park, Warner Leisure​Location: The Cotswolds​Design Team: Design LSM​Flooring Contractor: Carters Flooring, Derby The stunning Heythrop Park is an 18th century country house, which has recently undergone a £40 million refurbishment. It was designed by Architect Thomas Archer at the request of the 1st Duke of Shrewsbury, Charles Talbot in 1704, and was inspired by the Italian Baroque style, which the Duke had picked up on his travels to Rome. ​Throughout the years it has been passed through families and has also been used as a College and Training Centre, and then onto a Golf & Country club around 1999.​Bourne Leisure purchased Heythrop Park in 2018, and then reopened in 2022 after the spectacular transformation.  Throughout the Hotel you will find our Brass Flooring Profiles and Stair Nosings, all in a satin brass finish, giving that luxurious but subtle gold detailing.
Sponsored
Riser Doors and Access Controlled Doors for Multi-level Data Centre

Riser Doors and Access Controlled Doors for Multi-level Data Centre

EBD Steel Doors (formerly Eurobond Doors)

We were approached to design & manufacture a range of steel fire-resistant riser doors and personnel doors for Europe's most advanced data centre, located in Canary Wharf, London.This 8-storey building offers 73,400 sqm of space - they needed simple yet secure riser doors to provide fire protection to the internal ducts, containing all the cabling and plumbing required in a sleek, discreet solution that provided maximum access, performance and safety.Alongside the riser doors, Eurobond designed & manufactured personnel doors that could be electronically controlled to control the access and provide an audit trail of personnel movement.The 2 key elements of this project were the riser doors - and the sheer volume required to cover the 8 levels and the access control requirements that had to be well planned and coordinated by Eurobond, the security contractor, end-user and architect.
Sponsored
Warden Hill Farm

Warden Hill Farm

Eternit

Arable farmer Ivan Banister talked to various agricultural building companies for advice before using local contractors to construct both parts of the new grain store. The first part of the new building was constructed with the secondary expansion undertaken and completed in time for the harvest. Eternit Profile 6 roofing sheets were selected for the project and installed by MJ Barrett.The roof was the most important consideration for Ivan and it was vital that the roofing material used on the store would resist the pressure from temperature and weather without cracking. Any problems in the roof and subsequent leakage would cause serious damage to harvested crops.Condensation had also proved a problem in older, steel roofed storage facilities at Warden Farms and the vapour permeable nature of Eternit fibre cement roofing sheets helps to minimise moisture levels within the new storage building.
Sponsored
Cockett PRU School

Cockett PRU School

Gerflor Flooring UK Limited

Swansea Council has transformed the support it delivers to pupils either outside or at risk of leaving mainstream education by building a brand new £9.64M school. When ‘scoping-out’ the project Swansea Council in conjunction with the contractor, would specify over 2000m2 of Gradus carpet tiles for the flooring element of the project. They would ultimately opt for the ‘Streetwise Design and Stratus designs for the school’s classrooms, corridors and communal areas.Cockett (Pupil Referral Unit) PRU school now provides staff and pupils with attractive and functional facilities all on one site.Gradus Carpets is a brand of the Gerflor Group, manufacturing premium quality carpet tiles and planks, broadloom, and impervious backed carpets. Utilising a range of high-performance yarns, Gradus’ extensive range of carpets are suitable for a wide variety of contract applications including commercial office, healthcare, and education environments.
Sponsored
The Sainsbury Centre for Visual Arts

The Sainsbury Centre for Visual Arts

Norwood Group Limited

PROJECT OVERVIEWThe Sainsbury Centre for Visual Arts was designed by Foster & Partners and commissioned by main contractor Kier Eastern. The brief was to replace 30-year-old partitioning with a system capable of fitting in with a visually aesthetic solution which was in-keeping with the existing architectural style.OUR SCOPE OF WORKThe demands of supplying architectural partitioning solutions within a visual arts centre environment meant that only the highest standards of design and functionality would be acceptable. From the start of the design phase, we worked in partnership with Norman Foster and Kier to create unique modular steel and glass partitions throughout the building. Bespoke doors provided the ultimate finish. Our approach was to ensure that functionality and aesthetics worked together to deliver consistency and innovation throughout the building. Attention to detail was paramount to the success of installing bespoke partitions within the creative surroundings of the Centre. 
Sponsored
Buckland Hospital

Buckland Hospital

Fixfast Ltd

The Buckland Hospital, Dover is a community hospital that provides a range of local services. Main contractor Interserve PLC enlisted Industrial Construction (Sussex) Ltd to install the roofing and cladding package. Fixfast products were the first choice for ICS and the Facade Support range was an obvious need for this type of contract; coupled with the DrillFast® Stainless and Lacquered products, the external roofing and cladding was installed in the finest possible manner.The external walls use a range of materials - black brick and through-coloured render serve as a background for two types of cladding panels: white fibre cement panels and timber laminated panels manufactured from kraft paper and finished with natural timber veneers. The dark colour of the brick is used as a medium to enhance the crisp lines of the bright cladding as well as the shape and colours of the wooded bank at the rear of the building.
Sponsored
Ackerley Modern Farmhouse

Ackerley Modern Farmhouse

Lindab Ltd

Forward thinking rural livingSimon and Fran Ackerley set out to design a traditional farmhouse with a modern twist for themselves and their 3 sons on their 200 acre farm in the stunning rural location at Kilnwick Percy, near Pocklington in Yorkshire. The main designer and contractor was Anderson York Ltd., this relationship proved to be a great team in making some exciting material choices. Including premium blue Welsh natural roofing slates and a contemporary galvanised steel gutter system which were provided by Burton Roofing Merchants. The merchants remarked that the Lindab rainwater system, "makes a striking statement but ultimately benefits very low maintenance".Owner, Simon commented that the long term view has ruled in most instances as they didn’t want any regrets. The finished project is a real pleasure to see and has had a lot of press coverage.
Sponsored
America's Test Cup Building

America's Test Cup Building

Fixfast Ltd

Portsmouth is home to the Land Rover Ben Ainslie Racing America’s Cup sailing team. TAC Projects were employed by the main contractor - Allied Developments - to provide the roofing and cladding works. TAC Projects have a long-standing trading relationship with Fixfast, and looked to them to provide fastening systems which would satisfy all the needs and requirements for such a project. Fixfast provided all the fasteners needed for securing the external building envelope on this iconic and prestigious project - including Fixfast's DrillFast A4 stainless steel fastener range was the solution to fixing in a challenging environment - securing the external building envelope on this iconic and prestigious project."TAC required a reliable supplier of high-quality stainless steel fasteners for this fast track project and chose Fixfast for their comprehensive range, good quality and technical backup"Tom Colbourne - Managing Director at T A Colbourne Projects Ltd
Sponsored
Live Active Leisure, Perth

Live Active Leisure, Perth

Sika Limited

Celebrating its 50th anniversary in 2019, the iconic Bell’s Sports Centre in Perth, one of Scotland’s largest sports facilities, needed a new roof to protect the important building. With the previous roof membrane nearing 30 years old and in a state of disrepair due to the challenging Scottish weather, the centre needed a long-term and robust roofing solution.Planned by Perth and Kinross Council’s arms-length body Live Active Leisure, the £700,000 project also aimed to improve insulation and ventilation in order to enhance the venue’s environmental performance and efficiency. With the building needing to stay fully operational during the works and the added difficulties presented by weather and the domed shape of the roof, the project provided a real challenge for the contractors.Roofing:Mechanically fixed Sika Sarnafil S327-15 EL light grey over Sika Sarnatherm insulation S327-15 EL.
Sponsored
Poplar Riverside, London

Poplar Riverside, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley GroupLocated on the banks of the River Lea, Poplar Riverside by Berkeley Group is set to become one of East London’s most vibrant neighbourhoods.It will feature over 2,800 new homes, a new 2.5 acre park and world-class resident facilities, including a commercial gym, a relaxing spa, and a public piazza for community events.As part of the façade package, OCL Façades installed the OBEX Class B Interface Sealing Membrane system, as specified for this project.Landmark Brickwork Ltd also installed the same system, namely 0500FR Class B Interface Sealing Membrane, complete with 0771FR Class B Paste Adhesive, ensuring that this development has the ultimate fully compliant, fully tested, façade interface sealing system.New Apartments: 2700Riverside Park: 2.5 AcresResidents Facilities: 16,000 Square Feet
Sponsored
West End Gate, London

West End Gate, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley Homes LtdWest End Gate is a mixed-use development by Berkeley Homes Ltd on Edgware Road in London W2, near the prestigious neighbourhoods of Marylebone and Little Venice.The development comprises 844 apartments (including 175 affordable), 8 shops and a restaurant, along with a new public plaza and improvements to Edgeware Road Junction.The full OBEX CORTEX Class A Through-Wall System has been specified on this project, including fire-classified Breather Membrane, Vapour Control Layer, Interface Sealing Membrane system, and the Score'N'Snap Cement Board system.With each OBEX product carrying a Class A fire-classification, it puts this façade installation by OCL Facades Ltd at the pinnacle of full compliance and highest performance.Residential Apartments: 844Buildings: 8Storeys: 29
Sponsored
Virgin Atlantic hangar uses Resutile ST flooring

Virgin Atlantic hangar uses Resutile ST flooring

Sherwin-Williams

This Virgin Airlines hangar at Heathrow Airport needed a flooring finish to resist wear and chemical spills, as well as deliver aesthetic appeal – with a light coloured shiny finish that would reflect light and capture the eye to brighten the 4000 square metre area.ExecutionTo ensure the highest quality finish for the hangar the proven standard Resutile ST floor coating system was organised. Specialist resin flooring contractor Datum Flooring first shot-blasted the concrete substrate under vacuum to achieve a Concrete Surface Profile (CSP) 3 to ensure an excellent mechanical key and long term solution with the coating system. Then a primer coat of Resuflor WB was applied which penetrates the concrete and provides a sound surface seal so that an even finish is achieved with the top coats. This was followed by two roller coats of Resutile ST Colour in Light Grey.
Sponsored
Office complex in the heart of Windsor

Office complex in the heart of Windsor

Schueco UK Ltd

The extension and refurbishment of these offices needed high-quality systems befitting their prestigious location adjacent to Windsor Castle and the listed Eton Central Station.The Windsor Dials complex comprises two buildings, Windsor One and Two. Building one had a double-height entrance installed and a two-storey glazed extension added to the roof. A double-height entrance was also created in building two with a single-storey extension to the roof. The glazed extensions provide the offices with views of Windsor Castle and the surrounding area.Hale Architects designed the project with Corley Woolley as the main contractor. Anglian Architectural fabricated and installed the building envelope. It features Schüco FSW 60 and FWS 50 S curtain walling, providing the contemporary aesthetic the client requested. The project also used Schüco door systems, including the ADS 65 HD and ASE 60 lift-and-slide doors.
Sponsored
Acoustic Flooring Requirement at Henley College, Oxfordshire

Acoustic Flooring Requirement at Henley College, Oxfordshire

Soundis

Acoustic Flooring and Tight DeadlinesNot only was footfall noise to be reduced, but airborne noise needed to be tackled as well. The design had to be as discreet as possible, retaining the original character of the building, and allowing for future amendments to the building. Finally, all of this work had to be completed to the unyielding deadlines of term times.Working closely with Main Contractor, Bowmer & Kirkland, Soundis and our installation partner UK Acoustic Systems recommended the Soundis ChipPanel 28 system as the ideal solution for the 1,575m2 area. Contracted by our client, we supplied and installed this ChipPanel 28 system due to its high impact and airborne noise reduction, conforming to Robust Detail standards FFT5.Furthermore, at only 28mm thick, this shallow floating floor also minimises construction height allowing that extra space for any additional features the college may wish to add in the near future.
Sponsored
Soundis Acoustic Matting / Underlay at Apartments, Cowley Road, Brixton, London

Soundis Acoustic Matting / Underlay at Apartments, Cowley Road, Brixton, London

Soundis

Cowley Road in Brixton is situated in a vibrant area of London where main contractors, Pinnacle Building Solutions were faced with the task of refurbishing an existing apartment block to a standard that reflected the higher standards of living now demanded in the area.Pinnacle Building Solutions were tasked with reducing not just airborne noise, but impact noise too. This is a classic problem in buildings constructed when building regulations were considerably more lax than today. This problem is compounded by modern tastes having moved away from carpets throughout the living space. Finally, the tight urban site demanded that all trades work together to an equally tight schedule of works.Soundis supplied over 2,850m2 of Acoustic Matting and Underlays. The end result being an installation that surpassed the building regulations Part E for both airborne and impact noise with ease.
Sponsored
Cotton Tails - Domiz Standard

Cotton Tails - Domiz Standard

Spanish Slate Quarries UK Ltd

Built in the market town of Sandy, Bedfordshire, Cotton Tails is a prestigious £2.5 million private residential property, the finalist for the RCI Pitched Roofing Awards. The property extends for around 4.8 acres and it includes formal gardens, fenced paddocks, stables, and outbuildings. The incredibly modern five-bedroom mansion offers 6000sq ft of living space characterized by a wealth of attractive features, including an impressive full height reception hall with a floating staircase and enviable underground wine cellar.The Cotton Trails project was managed by Mark Lenn, the landowner, and built by Bartram Timber Frame Buildings Ltd. For the installation of the roof, the landowner selected D Stockwell Roofing Contractor, based upon recommendations, experience, and quality of workmanship. Roofers were instructed to only use high-quality materials to complement the luxurious mansion and interiors of the prestigious property.
Sponsored
Reliable Washroom Solutions for Jigsaw Care Home

Reliable Washroom Solutions for Jigsaw Care Home

Thomas Dudley

Jigsaw Care Home required a reputable supplier to provide quality washroom facilities suitable for their residents.Our specifications team worked in collaboration with the main contractor to understand fully how best to meet the customer's needs. They required products that were gloss white and looked like porcelain to give sanitaryware a less institutionalised feel. Anti-ligature was a must so our Resan range ticked all the right boxes.All options were discussed before deciding on the Resan pan with blue rim, the phantom Pushflo with anti-ligature button and anti-ligature basin with pneumatic controls, large mirror and shelf. Our infra-red touch-free sensors can be used in through-wall applications and with no electrical power required minimising installation costs and ongoing maintenance.Testimonial“The quality of the products is excellent and the installation was hassle-free”
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Residential Building

Residential Building

Ash & Lacy

As a consequence of the Grenfell tragedy, an assessment of the building envelope was carried out on the 275nr residential apartment block in the centre of Leeds. It was found to be non-compliant with current regulations and in urgent need of replacement.The VariAL-SF system was selected as it complied with an A2 fire rating, with EN13501-1 classification by third parties, and satisfied the detailed planning constraints.The importance of the cladding refurbishment and replacement on this high-rise residential building cannot be understated. The building was identified by West Yorkshire Fire & Rescue Service late in 2019 as being high risk from the perspective of residents safety, due to the fact it was clad in flammable panels and onus was placed on the building owner to take swift action to make the building safe. As such, an ambitious 52 week programme for complete removal of the existing cladding and replacement was set out and achieved by the project team, despite significant limitations in terms of access and logistical challenges.To the passer-by, there is barely any discernible difference in the aesthetic of the building’s new facade, the colour-matching of the panels is incredibly accurate and allowed for a seamless transition to a much safer environment for the building’s residents.The apartment block was in the middle of a built up residential area. The contractor needed to obtain road closures from Leeds city council for two main roads which ran the full length and one side elevation.Furthermore the other main elevation was a pedestrian walkway with access to the apartment block , a hotel and several commercial buildings therefore safe access routes and segregation had to be installed and coordinated with the various parties involved.In addition, the building had to be reclad using 125ft cherry pickers working off the main road and pedestrian walkways therefore protective tracking systems had to be laid over the tarmac and paving to protect the existing materials.Throughout the building refurbishment, which took exactly 52 weeks, access to all the various buildings was maintained and contractor site personnel worked closely with adjacent building owners and especially the management team of the apartment block which accommodated 270 apartments to ensure minimal disruption.
Sponsored
Waterproofing an Exclusive Residents’ Club, London

Waterproofing an Exclusive Residents’ Club, London

Newton Waterproofing Systems

Located in Earls Court, London, the Lillie Square development will eventually stretch from Chelsea football ground to Kensington Olympia, and comprises of over 800 multi-million pound luxury dwellings. The development will also contain London’s largest private residents’ club, which boasts a lounge, library, private dining room, cinema, gym, spa facilities and 20 metre swimming pool with jacuzzi.Lillie Square Phase 1 required the formation of a watertight basement to house the luxury private residents club serving the entire property development. A large portion of this luxury clubhouse, including a swimming pool, spa, sauna, steam room, gym and function room, is below ground. The project therefore required robust waterproofing to protect the internal environment.Newton Specialist Contractor Stonehosue were consulted at an early stage to be part of the design team and provide a guaranteed waterproofing solution that would comply with the requirements of both BS 8102:2009 and any third-party warranty providers.The long-term partnership between Newton Waterproofing Systems and experienced Specialist Contractor Stonehouse has seen both companies partner on a vast portfolio of properties across the UK, and Stonehouse brought this experience to the table at Lillie Square.In order to provide the maximum level of protection, Stonehouse combined two Types of waterproofing in order to achieve a completely dry ‘Grade 3’ internal environment as per the recommendations of BS 8102:2009.The first of these products was the Type A, cementitious, liquid-applied waterproofing membrane Newton 107F, which was particularly suitable to this large-scale project due to the fact that it could be quickly spray-applied over large areas.The 107F was supported by the Type C Newton CDM System cavity drain waterproofing, installed throughout the basement area of the clubhouse, with four Titan-Pro sump chambers containing dual NP400 pumps, as well as Newton High Water Alarms, Inverters and Battery Back-Up protection creating a truly failsafe system.By working with Sir Robert McAlpine at the design stage it was possible to consider the lifetime performance of the structure as well as the cost in order to design and install thorough waterproofing protection.
Sponsored
The Exchange Student Accommodation, Hotham Street, Liverpool

The Exchange Student Accommodation, Hotham Street, Liverpool

URSA UK LTD

An 11-storey student accommodation facility on Liverpool’s Hotham Street marks the second phase of an exciting redevelopment project for the city. Cladding contractor, BAK UK, has specified URSA’s Façade N35 slab across the vast new build structure.URSA has supplied over 1000m2 of URSA Façade N35 slab to cladding contractor as part of a £35m student accommodation project in Liverpool.Under the scheme, 500 student homes are to be created in a multi-storey environment on the site of the former Odeon cinema on London Road/Hotham Street. A swimming pool, gym and two landscaped gardens also form part of the ambitious city centre development set for occupation later this year.As appropriate for a prestige, high-rise residential and multi-occupancy building, superior materials have been specified throughout including URSA Façade N35 slab.The scheme has been halted for several years due to issues surrounding development funding. Now under new ownership, the design and construction have been scrutinised and it appears that a combustible insulation may have been used in the original cladding system. This has since been replaced and new work completed using URSA’s specialist product.  Ian Claydon, Technical Manager at URSA commented: “As with many high rise buildings developed only a handful of years ago, unsuitable products have been installed that don’t offer the necessary levels of protection to ensure the safety of occupants.”Rainscreen cladding is a lightweight, non-load bearing system attached to the outside of a building using a bracket and rail system. The cladding system provides protection from wind and rain, improves the thermal performance and limits solar gains.  Ian added “URSA Façade N35 is totally non-combustible, Euroclass A1, so doesn’t add any fire load to the building or prejudice the overall fire performance of the wall. The presence of the ventilated cavity behind the cladding system means that cavity barriers are required to prevent the spread of fire and/or smoke. This is a unique and highly effective product that we are seeing specified increasingly across UK and European sites.”    
Sponsored
Canaccord Genuity

Canaccord Genuity

3v Architectural Hardware Ltd

Architect/Designer: Chu AssociatesLocation: LondonProject Overview: Complete refurbishment of existing high-end client meeting suite, scope included a complete ironmongery package for all new full height timber & double glazed doors.ServiceFull hardware scheduling & bespoke design service.Project Details3v worked closely with Chu Associates on this project to provide discreet stainless steal ironmongery that enhanced the beautiful full height walnut doors and thin profiles double glazed doors.As well as providing complete hardware scheduling for the whole project we also worked with the team to customise both the size and finish of one of our existing pull handles. These custom made 1800mm straight pull handles with Firenze black leather grip were coordinated well in advance with both the joinery and glazing contractors to add the perfect finish touch to this high-end design scheme.
Sponsored
Machrihanish Golf Clubhouse - Alumasc Rainwater Aqualine & Flushjoint

Machrihanish Golf Clubhouse - Alumasc Rainwater Aqualine & Flushjoint

Alumasc Water Management Solutions

The new clubhouse of the Machrihanish Golf Course has had its water management upgraded thanks to the installation of two Alumasc Rainwater products: Aqualine Box Extruded Aluminium Gutter and Flushjoint Aluminium downpipesThe golf course, founded in 1876, recently had its clubhouse rebuilt after a fire in December 2018 destroyed the original building. Local contractor McKinven and Colville Ltd carried out the work on the new clubhouse which was designed by G1 Architects. The building offers unparalleled panoramic views across the Championship and Pans courses.“For this project, two Rainwater products, Aqualine Box and Flushjoint were specified and installed for the new clubhouse on the golf course,” said Nicola McGowan, Area Sales Manager, Scotland. “It’s an elegant, modern building with stunning views over the Atlantic.“The Aqualine Box Extruded Aluminium Gutter and Flushjoint downpipes were chosen for their sleek, modern design, and durable, non-corrodible features.”
Sponsored
ADDASET RESIN BOUND PAVING FOR BULL YARD COVENTRY REDEVELOPMENT SCHEME

ADDASET RESIN BOUND PAVING FOR BULL YARD COVENTRY REDEVELOPMENT SCHEME

Addagrip Terraco Ltd

Addagrip Addaset BBA resin bound surfacing has recently been installed in this street scheme as part of the redevelopment of the Bull Yard area in Coventry City Centre.The £2million redevelopment of the site, close to the Wave, included the requirement for a seamless paving solution that would be hard wearing and offer a safe, slip resistant, low maintenance porous surface for this busy retail area.The existing surfacing consisted of old asphalt and paved areas. Addagrip Terraco approved contractor Total Protection transformed the area with 1,770m2 of BBA approved Addaset resin bound porous surfacing in a Hazelnut blend to create seamless pedestrian areas alongside the water feature and children’s play area.The finished project enhances what is seen as a key arrival point into the city from Coventry railway station.Work commenced early 2020 but the planned April finish date was set back due to Covid-19 and was eventually completed in August 2020.
Sponsored
Churchill Square | Changing Places Toilet

Churchill Square | Changing Places Toilet

CareSpaces by Wealden Rehab

Churchill Square, a bustling shopping hub in Brighton, underwent a significant transformation in 2022, closing its main customer toilet area for a multi-million pound renovation. The refurbishment included not only updating the main toilet facilities but also adding accessible WCs, mother & baby areas, a prayer room, and a Changing Places toilet. Graham Construction, the main contractor, enlisted our assistance for the Changing Places toilet installation. Addressing layout challenges during the initial site visit, we collaborated with the Graham design team to ensure compliance. Our detailed drawings and management through the Trimble Construction One™ portal streamlined the construction process. The installation featured a GoLift ceiling hoist, a thermostatic shower, a Premium 200 shower bench, a height-adjustable basin, and a wall-mounted privacy screen. We provided training for key staff, facilitated the Changing Places registration, and achieved a fantastic finish on this noteworthy project.
Sponsored
Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Vista V510S, Mono M311 and Orbis OS211 for Alder Hey Children's Hospital

Delta Balustrades Ltd

Products:Stairs: OS211 Orbis Glass Infill Top FixCourtyard Podium: M311 Mono Glass Infill Top FixCone Glazing: V510S Glass Infill Fascia Mount Side FixContractor: Galliford TryArchitect: 10architectDelta were proud to work alongside Galliford Try and 10architect to supply balustrades and handrails to the new community cluster on behalf of Alder Hey Children’s NHS Foundation Trust.The £15m development included the construction of a new build facility that provides space for mental health and neurodevelopmental outpatient facilities and a 12-bed specialist inpatient mental health unit.Community Cluster forms a key element of the growing Alder Hey campus, the facility brings a centre of excellence for Children’s health closer to nature within a newly created landscape.Delta’s structural glass range, Vista, helped to materialise the architects vision for the unique cone glazing design.
Sponsored
Lucy Cavendish College, Cambridge

Lucy Cavendish College, Cambridge

Cellecta Ltd

Lucy Cavendish is the fastest growing and most diverse college in Cambridge. The development consists of a refurbishment of most of the college’s buildings into 72 eco-friendly ensuite bedrooms as well as co-accessible and fully accessible rooms for wheelchair users. The student accommodation block is a part three-storey, part four-storey structure arranged in two connecting wings, a café and bar area and informal learning and collaboration spaces have also been provided. The college achieved The David Mackay Award for Engineering and Sustainability, Best New Building over £2m, and The Contractor Award.Cellecta’s ScreedBoard 20 was specified by R H Partnership Architects as it is the ideal overlay floorboard for acoustic application incorporating underfloor heating applications due to its high thermal conductivity. This enables the system to run more efficiently, saving on running costs and improving reaction times.SDC was awarded this 305m² contract to construct this refurbishment in Cambridge.
Sponsored
Southampton General Hospital, New Oncology Ward

Southampton General Hospital, New Oncology Ward

Garland UK

A brand new, state of the art Oncology Unit had been proposed for Southampton General Hospital, to become a flagship facility for the area. Designed to house 27 dedicated beds, cutting edge treatment rooms and medical equipment, the new Oncology Unit would provide life-saving treatment for cancer patients and essential support services to the locality.With works originally scheduled to commence during the COVID-19 pandemic, the NHS Trust Estates Team worked closely with Garland UK and all contractors to speed up the construction as safely as possible, to ensure the vital facilities were available at the earliest convenience.From the outset, Southampton General clearly outlined their future intentions to increase the capacity of the Oncology Unit, and fully utilise the inverted roof design by adding extra stories of ward space.As an essential part of Garland’s brief, the unique design intentions for the building had to be factored in and the rooftop waterproofing system required careful planning.
Sponsored
IMPRESSIVE WINDOWS RELY ON HODGSON SEALANTS

IMPRESSIVE WINDOWS RELY ON HODGSON SEALANTS

Hodgson Sealants

78 St James Street, a very special office refurbishment in the heart of London’s Mayfair, has involved a slew of skilled and experienced contractors to make the Grade II* Victorian building a commercial space fit for 21st century working while retaining the building’s magnificent fabric. Halifax Glass has used Hodgson Sealants’ U9 silicone for sealing the building’s impressive timber window units.  The windows, which are the full height of the storeys on the front façade, required a specialist glazing company to meet the demands of the project. Halifax Glass has many years’ experience in creating architectural glazing solutions and was called in to produce and install the windows at St James Street using Hodgson Silfix U9 Silicone Sealant for the job.  Halifax Glass also used quantities of Hodgson’s Flexistrip, the market-leading load-bearing security glazing strip for installing double glazed units, laminated glass and single glass into windows and doors.
Sponsored
Striking circular floor for landmark pleasure dome

Striking circular floor for landmark pleasure dome

Junckers Ltd

Junckers solid wood flooring has been installed at Spanish City in Whitley Bay as part of major refurbishment works. Architects ADP brought the seaside pleasure building back to its former glory by carefully restoring original decorative features in the Grade II listed building. The works included revealing the magnificent dome in the rotunda by removing a mezzanine floor, restoring the triple height ceiling to create a large, circular space. The grand room required a complimentary floor and the choice fell on Junckers’ Black Oak, which has been fitted in a striking concentric dodecagon pattern. Installed by Junckers’ Approved Contractor Stenhouse Flooring, the project features mitred joints which require a high level of skill and experience. Junckers’ solid wood flooring was also installed in several other areas in the building, which now includes bars, shops, restaurants and a suite of rooms for events, conferences and weddings. 
Sponsored
The Pears Building

The Pears Building

Halspan Ltd

Ahmarra Door Solutions manufactured over 200 fire doors for the Pears Building, which is situated next to the Royal Free Hospital in London.The FD30 and FD60 doorsets incorporated Halspan Optima door blanks.The Pears Building will accommodate the UCL Institute of Immunity and Transplantation. This is a state-of-the-art medical research centre which will advance the understanding of diseases such as cancer, diabetes, HIV, and tuberculosis, and for traditional and tissue-developed transplants.Designed by Hopkins Architects and constructed under main contractor, Willmott Dixon, the building’s seven-storey structure includes laboratory space, research facilities, offices and two levels of patient accommodation, which will enable people undergoing clinical trials to rest and recover there.Designed to achieve BREEAM Excellent, sustainability was at the heart of the building’s creation. As such, Ahmarra Door Solutions used Halspan as all Halspan fire door blanks are made from FSC® certified timber.Photography courtesy of Cannon Photos Ltd.
Sponsored
Incarnation Secondary Glazing - Wheeler Gate

Incarnation Secondary Glazing - Wheeler Gate

Roseview Windows

An urban luxury conversion in the heart of Nottingham City Centre. This project involved the contractor converting a commercial building within a conservation area into luxury apartments.There were various design issues that needed to be overcome, including curved on plan bays. The curved bays required a bay pole system to allow the installer to gain the necessary shape profile.An added challenge was window size. There were a number of large, multi-part windows in apartments accessed via tight staircases and small door openings. To overcome this we made some of the larger units in kit form and sent one of our experienced fabricators to site to assemble them in situ.A key requirement was noise abatement which was achieved with acoustic glazing and an optimal 100mm air gap, adding - on average - 35DB of noise reduction on top of that provided by the primary windows.The end result were minimal profiles matching original sightlines, coupled with significant thermal and acoustic performance improvements. 
Sponsored
Left Bank

Delivery of an iconic Left Bank development

Left Bank Delivery of an iconic Left Bank development

SFS Group Fastening Technology Ltd

SFS have partnered with a leading building envelope contractor,  on the construction of two iconic towers in the heart of Birmingham, one clad in brass, the other silver. The buildings will transform the city's skyline and deliver a mix of luxury apartments and retail space. The striking Left Bank development, in Birmingham's popular West End, will create the tallest exclusively residential building in Britain's second largest city.Alucoil larson® ACM FR - Brass Brushed panel, with a fire-rated mineral core, was chosen for the façade. This drained and back-ventilated rainscreen cladding system for Tower 1 is being fitted with an NVELOPE® bracket and rail system and powder-coated SLA3 frame fasteners, SLA5 fasteners, as well as SX3 and SX5 A4 (grade 316) stainless steel fasteners from SFS. The choice of surface finishes for the envelope demanded high quality fastening solutions that would stand the test of time, and perfectly complement the crucial aesthetic goals.
Sponsored
Durham University Gateway

Durham University Gateway

Polyroof Products Ltd

The Durham Gateway project is a major new development at the Durham University that houses a variety of departments. Although aesthetically stunning, the concept presented several challenging issues.The project was carried out to a BREEAM ‘Excellent’ Standard and as such only used components that had minimal environmental impact. Cold-applied liquid roofing membranes, such as those manufactured by Polyroof, have been recognised by BRE to help roofing elements achieve up to an A+ rating (depending on the roof construction).Part of the works involved the construction of three curved roof areas that required a high-performance and durable waterproofing system which was to be covered by a timber shingle system. The shingles were supported by over 1,170 steel stanchions – all of which were seamlessly waterproofed with the Protec System.The main contractors of the project, Laing O’Rourke, were able to achieve the visual impact they wanted with the peace of mind that the roof was protected by a totally seamless and highly durable waterproofing membrane.

Showing 793-828 of 1096

Feedback