NBS Source
I'm a manufacturer

"roof decking other materials"

8,031 results found

Sort by:

Showing 685-720 of 898

Sponsored
Zintek Mediterranean Blue Standing Seam – Property Development, Edinburgh

Zintek Mediterranean Blue Standing Seam – Property Development, Edinburgh

Metal Solutions Limited

Secreted within the grounds of a Victorian villa these 2 new Mews properties and 3 new Townhouses replaces demolished 1980’s office facilities. A strong masonry base envelopes a timber clearstory and gables, aluminium dormers and a Zintek Mediterranean Blue zinc roof, to give a truly contemporary interpretation of a traditional mews building. The Townhouses are formed with complex twisted geometries. As with the adjacent mews, materials were selected incorporating a solid masonry base, timber cladding to the projecting cantilevered boxes, aluminium glazing systems, white render and topped with blue zinc mono-pitched roofs.
Sponsored
Living Building Milan

Living Building Milan

Retanol

“Bosco Verticale” by Stefan Boeri.The vertical forest - that's what the 119 and 87 meter high apartment towers in Milan's new city are called and have been an example of ecological building since their completion. The reason: The two buildings are surrounded by overhanging balconies that provide a home for 730 trees and 20,000 other plants. A “stacked park landscape” above the roofs of the city, green and emitting CO2 . Built with RETANOL® screed.
Sponsored
Broadwalk House

Broadwalk House

In Opera (UK) Limited

The refurbishment was created with a light touch but transformed the main building entrance and reception, upper-floor common areas, WCs and half of the office floors. Work was undertaken whilst the other office floors remained in occupation.The reception refurbishment reused many of the existing high-quality materials, which complements terrazzo, but also helped to transform the space into a contemporary interior whilst retaining the grandeur and sense of arrival.Terrazzo is also in harmony with the edgier interventions such as the distressed metal ceiling raft and lighting which have contributed to the building appealing to the next generation of banking tenants with start-up bank Monzo taking the vast majority of vacant space in the building.The gentle approach to refurbishment and the reuse of materials as well as the use of terrazzo contributed to meeting British Land’s exacting sustainability targets.
Sponsored
Unison Clubhouse, Croyde

Unison Clubhouse, Croyde

Metrotile UK Ltd

The village comprises of holiday accommodation and facilities for sports and leisure, including a gym and restaurant. Many of these facilities are based inside the Unison Clubhouse, which was roofed in corrugated tin – an old material ill-suited to a focal building and in desperate need of a refresh.Metrotile Slate .900 was chosen as the replacement for its clean aesthetics and its high impact and weather resistance
Sponsored
Bitumen Case Study: Whitburn Partnership Centre

Bitumen Case Study: Whitburn Partnership Centre

Bauder Ltd

Whitburn Partnership Centre was designed by Project Architects, Matthew Fair, Neil Forrester and Jamie Bateman at Smith Scott Mullan Associates for West Lothian Council. The design of the contemporary £4M building restores the historic Whitburn Burgh Hall original façade as it is one of the towns most renowned buildings and incorporates a new-build two-storey extension.Located in the centre of Whitburn, this building is a community hub that embraces the West Lothian Council’s model of bringing together services that benefit local communities whilst delivering financial efficiencies through the decrease of council buildings. This building facilitates a library, community halls, museum and customer information service office, making it an important community resource. Project:Whitburn Partnership CentreProject type:New buildLocation:West Lothian, Scotland,Waterproofing:Bauder Total Roof System (BTRS)Roof size: 525m2Energy generated from PV array: 10.35kWp Specifier: Smith Scott Mullan AssociatesMain Contractor: Maxi ConstructionApproved contractor: ProCladd (Scotland) LimitedSolar PV installer: Intelligent Electrical SolutionsThe specificationTo support the West Lothian Council's sustainability objectives of achieving high energy efficiency, it was our responsibility to specify a waterproofing system and provide a solution for natural energy generation. The bituminous Bauder Total Roof System (BTRS) was chosen for this project as it features membranes that can withstand impact and tearing, as well as thermal insulation that met the required U-value of 0.15 W/m²K. This waterproofing system is verified by the BBA and offers a service life in excess of 35 years.The BauderSOLAR system was also specified, as it incorporates photovoltaic arrays for natural energy generation. The photovoltaic mounting system is attached to the roof without penetration of waterproofing or the deck, safeguarding the integrity of the waterproofing to fulfil its full-service life.Project challengesThe Architect’s design incorporated unusually high parapet upstands, which posed a challenge for installers. Area technical manager for Bauder, Christopher Langton, attended design meetings with the Architects and Main Contractor to discuss the best solution for installation. A mutual agreement was made for the underlayer to be mechanically fixed to prevent any slippage of the capping sheet membrane. Due to the height of the upstand, non-combustible insulation BauderROCK was incorporated into the design at these details.The installation of BauderSOLAR F uses prefabricated bituminous BauderK5K membrane sleeves to slip over the mounting plates and welded into position, anchoring the plates to the surface of the Bauder waterproofing system. Approved BauderSOLAR installers, Intelligent Electrical Solutions, installed the BauderSOLAR system, collaborating with ProCladd, approved contractor for the waterproofing installation, and other trades during the roof installation.There is a junction where the flat roof meets the original slate roof of the adjacent building, this detail fell under the torch free zone that hot air welding techniques are used to install the membranes within these areas.The resultInstallation of the Bauder waterproofing system may only be carried out by trained and certified operatives approved by Bauder. A project pre-start meeting was held by Bauder site technician, Duncan Hastings, and area technical manager, Christopher Langton inviting the Site Manager from Procladd and their Bauder badged operatives. During this meeting, they discussed the installation of the project, and identified the areas that required torch-free and torch-safe detailing. They also discussed how the project was going to be delivered in co-ordination with other trades working on the site at the same time, for example cladding and lead that was installed atop the waterproofing upstand details.Weekly site-inspections were carried out by Bauder site technician, Duncan Hastings during the project. Visiting the site frequently meant that Duncan could provide consistent support to the installers and answer any questions they may have had directly. It also meant that the quality of the roof installation was being monitored regularly to ensure it would be to a high standard, achieving the comprehensive guarantee.The approach taken to deliver this project on time and to budget was through meticulous planning and working to tight time frames. The organisation of the delivery of Bauder products to site had to be in line with the schedule to ensure that the site was ready to receive a delivery. With the project located in the busy centre of Whitburn next to a cross junction with traffic lights. This meant that timed delivery of products to site was required in addition to prebooked off-loading by pump truck and tail lift or by telehandler.Health, safety and environment was managed during the planning, design and installation of this project by advising that all installers follow the advice shown in the “Responsible Specification Checklist” produced by the National Federation of Roofing Contractors.In accordance with the Workplace (Health, Safety and Welfare) Regulations 1992, roof edge protection in the form of scaffolding was installed during installation. The project’s perimeters were surrounded by Heras fencing to isolate the construction site from the public. All scaffolds that were on the elevation next to the public had toe boarding and safety mesh where required.As standard, there was a one-hour Firewatch after the Bauder membranes have been installed using a gas torch. This was carried out by Procladd operatives each day when they were working on the project to ensure the welfare of the workforce, and the safety of other trades and that of the building. The 19kg gas cylinders were used on this project as they are easily transportable on the roof area. At the end of each working day, the cylinders were stored in a locked and designated gas storage unit on site.System installedBauder Total Roof System (BTRS)1 BauderK5KElastomeric bitumen torch-on capping sheet in charcoal grey. This product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUOA self-adhesive, elastomer bitumen underlayer. This product features distinctive technology for lap sealing.3 BauderPIR FA-TE flatboard insulationA rigid polyurethane foam board faced on both sides with aluminium foil.4 BauderTHERM DS 1 DUOA self-adhesive, elastomer bitumen air & vapour control layer.
Sponsored
M4 Junction 3-12 Motorway Upgrade

M4 Junction 3-12 Motorway Upgrade

Cordek Ltd

The M4 Junction 3-12 motorway upgrade project, which started construction in July 2018, is designed to increase capacity, and reduce congestion between Junction 3 (Hayes) and Junction 12 (Theale). In the sections where there is no pre-existing hard shoulder for conversion into an additional running lane, a total of 11 overbridges needed to be demolished and replaced with longer decks to enable continuity of the widened carriageway. The £848m project is due for completion in Spring 2022, by which time it is expected that approximately 680,000t of material will have been excavated, 1.8M.m² of new surface laid, 130km of cabling installed and 63km of concrete barrier positioned. Cordek were approached by the Principal Contractor Balfour Beatty VINCI joint venture to provide a lightweight structural fill solution to be used for the embankment construction adjoining the Datchet Road Overbridge, between Junction 5 and Junction 6.
Sponsored
Interior Architects Looking for Innovative Solutions for their Project

Interior Architects Looking for Innovative Solutions for their Project

Riga Wood

Latvijas Finieris is increasing its production volumes of lignin-based green glue Riga ECOlogical, and the new product is gaining popularity among architects and interior designers. The design bureau br.ook interior architecture, in one of their latest projects – library of Andrejs Upīts Secondary School Skrīveri, Latvia – chose to use Riga Ply and Riga ECOlogical for their interior solutions. Interior architect Baiba Rūķe, br.ook interior architecture, comments: “The initial idea was to create a multifunctional space, yet we wanted the environment to be clean and natural for creative activities. The birch plywood is good material due to its durability and vast application options. It is also our local product. As interior architects, we pay a great deal of attention to materials that we use in our projects and we look for solutions that focus on air quality. It was interesting to use this material, which is natural and has a focus on sustainability.”The library is special, not only because of the high-quality materials used in the renovation process, but also due to its functionality. The idea of the project was to transform the library into a meeting place where one can get familiar with the latest books, do homework in a pleasant and quiet environment, as well as organise other educational activities for children and the youth.
Sponsored
Crossrail Place

Crossrail Place

Radmat Building Products Ltd

Radmat Building Products has supplied the waterproofing roofing system for the Crossrail Place shopping development and roof garden in Canary Wharf. The system provides high performance waterproofing and thermal insulation – guaranteed for the lifetime of the structure – and has enabled the construction of an extensively planted living roof.• The 310m long roof arches 30m over the park and opens to allow natural irrigation• Highly insulating roofing materials help create a microclimate for the gardensRadmat Approved Contractor Prater delivered a 9,300m² roofing solution using PermaQuik PQ6100 Hot Melt Monolithic Waterproofing Membrane, EshaFlex 370 WS Root Barrier and ProTherm insulation.Construction access to the complex inverted timber roof was challenging, so Radmat’s products were chosen for their quick and flexible application and fast-sealing properties.PermaQuik is widely used beneath green roof installations where long-term weather tightness is a necessity, and it was chosen to support the extensive and densely planted gardens, which are the main feature of the Crossrail Place roof terrace.The PermaQuik membrane was followed by EshaFlex 370 WS Root Barrier, a reinforced bitumen membrane that is torch applied to the base sheet. It was selected because of its thermal efficiency and suitability for use with living roof systems. Partnered with ProTherm’s excellent insulation, the complex timber roof now boasts a waterproof system that is BBA Certified to last the lifetime of the building.The wooden structure evokes the ships that once sailed into West India Dock and provides a warm, natural counterpoint to the steel and glass towers of Canary Wharf.And with Radmat’s high performance products and lifetime guarantee, the green roof terrace at Crossrail Place will be a living oasis in the heart of London’s financial district for years to come.
Sponsored
George Eliot Hospital

George Eliot Hospital

Axter Ltd

The NHS Estates Team required a new office space and workshop area and proposed the refurbishment of an existing building.Systems in useHyranger®Starcoat® PMMAOverviewAxter Ltd were instructed by William Gough & Sons Ltd to produce a design for six roof areas, following a site survey report. The project included a mixture of new build and refurbishment areas, comprising of various systems and design requirements. This included a cut to falls insulation design to comply with Part H and BS 6229:2018. Roof A, the focus of this case study, had a series of convex or ‘barrel roofs’, requiring bespoke detailing and careful design to achieve robust detailing and the required U-value.The project value was circa £1 million. This included all building works and a strict budget for the roofing package, which was achieved. The programme for the works was 16 weeks and completed in Autumn of 2022, to the required deadline.The successful project was also nominated for a National Federation of Roofing Contractors (NFRC) award 2023.ChallengesAxter were appointed at RIBA Stage 2 to undertake site surveys and work alongside the Principal Designer as Designer under the Construction Design and Management Regulations 2015.The existing asphalt had shown signs of cracking and blistering, and the outlets were damaged from vegetation growth from a lack of maintenance. New outlets were installed with leaf guards, allowing free flowing water whilst preventing blockages.The proposed office section of the works required thermally upgrading to comply with Building Regulations: Part L. The U-Value requirement was 0.18W/m2K which could be achieved with a 120mm PIR flat board. Due to the curved profile of the roof, installing the insulation below deck level was considered. However, due to an inadequate ceiling height this was disregarded.Furthermore, this would have resulted in the development of interstitial condensation. Further design solutions had to be considered. To bend a 120mm board would have required multiple cuts to the insulation so the decision was made to split this into two thinner boards to achieve the radius more easily.When split into two layers the requirement changed to 2 x70mm boards (140mm total) as worked out using U-Value calculations by the in-house design team at Axter. A timber hard edge was introduced to abut the insulation at the building perimeter to separate the façade and the main field area.Systems and productsAxter’s Hyranger multi-layer RBM system was used across all six roof areas. The system is fully BBA and BRoofT4 compliant, and achieves a guarantee period of 20 years. For this project, Axter’s Goldshield Guarantee was chosen, which covers materials, workmanship and design liability. This was overseen on site by Axter’s Quality Assurance team, who audited the project inclusive of the installation, safety and general management of the roofing works.Axter Starcoat PMMA was used as a cost effective solution to coat the copper fascia and provide a fresh and seamless look to the exterior of the building.SolutionsThe Axter Hyranger multi-layer RBM system was installed using traditional gas driven torches to fully bond the (AVCL) Air and Vapour Control Layer and cap sheet layers. The underlayer was installed over a tissue faced PIR and therefore needed to be self-adhesive in order to reduce the risk of fire, complying with NFRC Safe2Torch guidelines. A cold applied Starcoat PMMA liquid was installed to the façade to achieve a seamless and cost-effective upgrade.The Axter Quality Assurance Team regularly attended site and were in constant communication with the appointed Axtershield Installer, Empire Roofing operatives, to ensure that the system was being installed correctly and to the expected standards in order to achieve the Goldshield guarantee required by the client. To achieve the guarantee level, all materials and workmanship had to be installed as per the Axter specification.The site agent from the main contractor was also regularly on site to oversee the project and ensure that deadlines and timescales were being achieved to keep the build on target for completion. The installation of the multiple roof areas was achieved to exceptional standards leaving the client very impressed with the workmanship.AcknowledgmentsWilliam Gough & Sons Ltd were very impressed with Axter Ltd on our first scheme with them at George Eliot Hospital in Nuneaton. The requirements of the scheme, which included a complex barrelled roof were investigated on site early in the design phase of the project and Axter’s recommendations were swiftly proposed and agreed with the client’s Architect. Once the design requirements had been established one of Axter’s approved installers were employed by us to very successfully deliver the scheme. The 20 year Goldshield guarantee provided for the Reinforced Bituminous Membrane system offered peace and mind to our client. Chris Hinton, Senior QS, William Gough & Sons
Sponsored
A true masterpiece of sustainability and design

A true masterpiece of sustainability and design

Lamilux Rooflights Ltd

The new £65 million, Science, Engineering and Environmental Building (SEE Building) at the University of Salford was designed under the concept of incorporating high sustainability credentials. This supports the university’s pledge in reducing the environmental impact, as part of the wider Salford Crescent and University District masterplan. The SEE building promotes innovation, environmental protection and excellent educational opportunities and offers students state-of-the-art facilities with the aid of the LAMILUX Glass Roof PR60. A stunning skylight measuring an incredible 44 metres long and 9 metres wide, as well as three other Glass Roofs PR60, were installed onto the roof of the four-storey building, illuminating the lecture halls and common areas. This results in enhancing the natural daylight, whilst also allowing for natural ventilation, creating an inspiring environment for learning and development. To avoid overheating and glare inside the building, special 60/30 high performing solar glazing was used. This innovative technology ensures a comfortable indoor climate whilst providing an optimal learning environment.LAMILUX worked with the architect from the early planning stage of the project to design, supply, and install the four rooflights. “Just-on-time” deliveries were planned to enable offloading of the materials, with a crane, from the vehicle to the roof, to minimise loading out as space on site was very limited. Integrated ventilation panels were installed within the three smaller PR60 Glass Rooflights to provide the ideal solution to provide natural ventilation into the building alongside natural daylight.The largest rooflight was glazed with an impressive total of 120 fixed glass panels to make up the impressive 44 metre length and complete the installation. The glass panels were specified with Class 1 Fragility, suitable for walking on for cleaning and maintenance loads, according to CWCT TN 66 /TN 67 & TN92. Before the final handover of the project, extensive water tightness testing was carried out. On site CWCT hose tests were passed successfully, as testament to the quality and durability of the installation led by the LAMILUX installation team. The University of Salford is passionate about sustainability. LAMILUX are proud to be involved with a building project that not only contributes to the progressiveness and commitment to sustainable architecture, but is also considered a BREEAM Excellent-rated facility.
Sponsored
Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement Windows Group

Twickenham Studios was established in 1913 and is one of the UK’s oldest and most celebrated film and TV studios. The Lounge is the Studio's new rooftop bar. This fabulous facility is accessed through brand new Clement steel screens. Made from strong EB24 steel sections, they are robust, but also incredibly slim and elegant. The bespoke doors have genuine T bars and a high glass specification, including Guardian Sun Guard offering solar protection and an argon gas filled cavity which improves thermal efficiency.
Sponsored
Soundproofing internal walls and floors in apartment conversion, Hertfordshire

Soundproofing internal walls and floors in apartment conversion, Hertfordshire

Hush Acoustics

Tudor House was opened as the offices for Hatfield Rural District Council by the Marquess of Salisbury in 1930. A grand old building, it was built in a Georgian style with a host of period features.When its purpose as a public administration building was over, a proposal for a conversion (material change of use) into apartments was put forward by Lioncrest. Whilst not a listed building, they proposed to retain all of the period features and, where time had taken its toll on the building fabric, restore and renovate the brickwork and stonework back to its former glory.Permission has been given to convert the offices into seven new luxury apartments comprising of four two bedroom apartments and three one bed apartments. The largest apartment was constructed in the roof space which entailed reconstructing the existing roof incorporating two large dormer windows and five roof lights. The building includes a large basement which was converted into stores for the occupants and for each of the apartments to have an allocated car parking space.Lioncrest consulted with Hush Acoustics at the design stage of this development for soundproofing advice and assistance with the design, specification and supply of the materials needed.There were a number of design issues to take into account due to the history of the building and the period features. Our soundproofing experts worked closely with Lioncrest to develop the most economical and convenient acoustic system to achieve the high results sought. The detailed and careful installation of the Hush materials allowed some fantastic sound reducing results giving the owners of the apartments a very good standard of living.A variety of products were combined to achieve the necessary sound reduction throughout the building’s separating floors, ceilings and walls. These included Hush Panel Cem 28, Hush Slab 100 Sound Absorber, Hush Seal 20 perimeter strip, Hush Bond Panel Adhesive, Hush MF Ceiling System and Hush Acoustic Hangers.Through detailed planning from Lioncrest with regard to the schedule, Hush Acoustics were able to deliver all acoustic materials to site ensuring that the deadline for completion was met. 
Sponsored
St James Road Apartments, Brentwood

St James Road Apartments, Brentwood

RYNO

Ryno Signature Decking in ‘Silver Birch’ takes pride of place in this new Brentwood development. The apartment block has a bold red brick exterior, with simple anthracite windows and detailing.The glass balustrades of the balconies allow the maximum level of light to enter the apartments, while making the paved courtyard feel even larger and more spacious.Products UsedTerraSmart® Composite in Silver Birch was used across the private balconies. Silver Birch, from the Signature Range of premium ‘capped’ decking, has an elegant textured wood-grain finish.The terrace spaces had additional height build-up requirements, so fixed-head adjustable pedestals were used to raise the decking to the door thresholds.
Sponsored
Museum of the Home, London. Koster TPO Single Ply Membrane.

Museum of the Home, London. Koster TPO Single Ply Membrane.

Koster Aquatecnic Ltd

A new extension and internal fit out was designed by Wright and Wright Architects of London. It gave a modern and fresh look to the original 18th century listed building. New Gallery space, a cafe, and leaning spaces have all been incorporated into the new building.Koster Aquatecnic Ltd were involved in this project at an early stage. We gave advice on the below ground areas as well as the waterproofing for the green roof.The Koster TPO Single Ply Membrane was selected as the material of choice to cover the flat roof section primarily due to its the environmental characteristics. The Koster TPO membrane is recyclable, contains no PVC, and is the most robust and longest lasting membrane on the market. The Slate Grey color (RAL 7015) was selected as it would blend in with the overall look the clients were trying to achieve. This project was fully Electronically tested prior to the green roof sedum blanket being installed. 
Sponsored
Cotton Tails - Domiz Standard

Cotton Tails - Domiz Standard

Spanish Slate Quarries UK Ltd

Built in the market town of Sandy, Bedfordshire, Cotton Tails is a prestigious £2.5 million private residential property, the finalist for the RCI Pitched Roofing Awards. The property extends for around 4.8 acres and it includes formal gardens, fenced paddocks, stables, and outbuildings. The incredibly modern five-bedroom mansion offers 6000sq ft of living space characterized by a wealth of attractive features, including an impressive full height reception hall with a floating staircase and enviable underground wine cellar.The Cotton Trails project was managed by Mark Lenn, the landowner, and built by Bartram Timber Frame Buildings Ltd. For the installation of the roof, the landowner selected D Stockwell Roofing Contractor, based upon recommendations, experience, and quality of workmanship. Roofers were instructed to only use high-quality materials to complement the luxurious mansion and interiors of the prestigious property.
Sponsored
Only genuine steel windows will do for such a magnificent property!

Only genuine steel windows will do for such a magnificent property!

Clement Windows Group

No other material could have produced such an exquisite end result as steel for this project in Surrey. Clement were contacted by the owners who wished to replace all of their original steel windows and doors. Following careful consideration of what was available Clement's EB24 suite of steel windows was chosen. The stunning double doors benefit from the use of surface mounted cremone bolts instead of a usual lever locking mechanism which means the centre bar of steel is slim and elegant just like those of the outer frames.
Sponsored
Siberian Larch Timber Cladding Case Study - NORclad - UWE Bower Ashton

Siberian Larch Timber Cladding Case Study - NORclad - UWE Bower Ashton

NORclad Limited

UWE Bower Ashton, Completed Summer 2017. Timber Cladding: Untreated Siberian Larch was supplied for this project, this will weather down to a silver grey to blend in to its surroundings, and contrast the other materials on the building. NORclad Grade B was supplied, offering a fair spread of knots, along with the distinctive grain of the species. Profiles: Horizontal cladding was a bespoke chamfered profile (Ex 25 x 100mm) Vertical timbers on the building are in a number of dimensions, Ex 25 x 100, Ex 50 x 50mm, and Ex 50 x 75mm.
Sponsored
Lower Drayton Farm - Staffordshire

Lower Drayton Farm - Staffordshire

DCM Surfaces

Lower Drayton Farm is a family fun farm, offering a variety of activities in the heart of the countryside.DCM installed Evo Pro Artificial Grass as part of the new indoor soft play area. Line markings were painted onto the sports grass to create a miniature sports pitch for children to play football and other ball games.The installation took place on an upper floor level, meaning the access for the project had to be taken into careful consideration when delivering materials and getting equipment to the area of works on site.
Sponsored
Cupaclad provides the natural solution for new coastal home

Cupaclad provides the natural solution for new coastal home

Cupa Pizarras

CUPACLAD 101 Logic was recently installed as part of a striking new-build project, located in Aberystwyth, Wales. The natural slate cladding was chosen because it could complement the coastal surroundings as well as provide outstanding resistance to the harsh weather conditions. The site was purchased by homeowners, David and Shirley Harries who looked to extend the pre-existing bungalow but after finding significant issues with its structure, opted instead to erect a new build on the same plot. “We really wanted a home that utilised a range of materials to create a modern look as opposed to building a glass palace that could look too ostentatious in the rugged seafront location,” said David. The couple approached Arwyn George from George + Tomos Architects who put together a design, which included CUPA PIZARRAS’ natural slate cladding system, CUPACLAD 101. “The CUPACLAD system allowed the new home to blend into the surrounding cliffs beautifully,” said Arwyn. “In addition, I had to consider the high winds that the project would be exposed to and select something that would have the appropriate durability.” High quality natural slate is a very resistant material – its deterioration is unnoticeable to the human eye, meaning its colour does not change across its 100 year lifespan, even in the coldest environments. Natural slate also has a permanent sheen, unlike other roofing materials which can decrease up to eight times superior.  “We really loved the proposal,” the couple commented. “The slate would blend seamlessly with the local landscape – both the cliffs behind the property as well as some of the other houses in the area, which also utilise natural slate. What’s more, the material is sympathetic to its environment.” CUPACLAD is constructed using specially selected slates, which are dark in colour, creating a bold and dramatic look, particularly when utilised alongside lighter materials such as glass, timber and render. CUPACLAD 101 Logic is made up of 40x20cm slates installed horizontally using fixing systems that are completely invisible once installed to avoid impacting the design. As with the rest of the CUPACLAD 101 series, it is BBA certified, verifying that it has an incredibly low level of water absorption, test results show a value between 0.16 and 0.17%. This ensures that the material is not susceptible to frosting or hypothermal ageing. Furthermore, the BBA certificate demonstrates the slate is very resistant to high winds, fire and impacts. Rhys Ben Wright from RBW Carpentry was then selected to install the slate system. A process made easier, thanks to the quality of the slate, with pre-drilled holes and self-drilling fixings. What’s more, natural slate has a number of environmental benefits. According to research carried out by the University of Glasgow, it produces a limited amount of atmospheric carbon (1KgCO2/metre2 over its lifetime) and has a low water and energy consumption rate. Furthermore, by sourcing natural slate from CUPA PIZARRAS, a carbon neutral company, David and Shirley’s cladding solution is verifiably sustainable. Once the project was completed, David and Shirley were over the moon with their new home: “The cladding fits the landscape seamlessly, which is due to the properties of the slate, as well as Arwyn’s design. He was able to shape the building in such a way that it really fits with the outlines of the hilly surroundings. “We were concerned that some of the slates would be lost in recent strong winds; however, the cladding remained completely intact. We would definitely recommend CUPACLAD.” CUPA PIZARRAS’ slate is exclusively distributed by Taylor Maxwell to the UK market. To find out more, about CUPACLAD, please visit: https://www.cupapizarras.com/uk/rainscreen-cladding/
Sponsored
Ingliston Equestrian Centre

Ingliston Equestrian Centre

Metrotile UK Ltd

When Ingliston Equestrian Centre, a stunning Show Jumping ground based near Glasgow entered into a multi-million pound refurbishment project, they specified Metrotile Lightweight Steel Roofing to help raise the centre to international standards.Metrotile supplied over three thousand square metres of roofing materials to two new stable blocks and numerous new Chalet buildings at the site. Metrotile Slate in Bronze was specified as it combines a stunning traditional look with a swift installation and a low weight that reduces stress upon the supporting timber frame structures of both the chalets and the stables. Stunning countryside surrounds Ingliston Equestrian Centre and the Metrotile Slate compliments the local area gracefully
Sponsored
SSQ’s phenomenal phyllite completes £10m Limehouse development

SSQ’s phenomenal phyllite completes £10m Limehouse development

Spanish Slate Quarries UK Ltd

SSQ’s world-class Riverstone phyllite has been used to outstanding effect on a multimillion-pound residential development in Limehouse, East London. The Copenhagen Place project has seen a stretch of canal-side East London transformed into a luxurious housing complex, consisting of 45 individual dwellings spread across a number of five storey apartment buildings – all of which were roofed with 60×30 Riverstone Ultra. A collaboration between architects Stockwool and Bellway Homes, the £10m development required a roofing material that didn’t just offer great aesthetics, but robust, long-lasting performance, too. Visit our website to read in full.
Sponsored
Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Falco UK Ltd

This is the new sleek and inconspicuous cycle hub recently designed, manufactured, supplied and installed by Falco at Hackney Central Overground Station.Greeting commuters to the west of the station, the 10m cycle hub has been fitted with a combination of both reinforced safety glass and sustainable hardwood cladding.A series of 48 spaces of the FalcoLevel-Premium+ two-tier cycle rack have been installed along with a FalcoFix 2.0 cycle repair station, LED lighting, CCTV security, branding graphics, a green sedum roof and secure mobile app access. Falco also installed five separate TfL London cycle stands located outside of the cycle hub.The green sedum roof, an increasingly popular feature for Falco shelters, supports the operators sustainable development plan by providing the many advantages associated with green roof systems as well as insulation for both heat and noise. A sedum roof both reduces water discharge as well as compensating for CO2 emissions.The FalcoSmart mobile app access system uses Bluetooth technology to provide Hackney commuters with secure access to the cycle hub using their own smartphone or tablet, removing the need for physical keys and fobs. Commuters are able to apply for access to the hub via Falco and having downloaded the ‘App’ are given access rights to the cycle hub for a period of time depending on their subscription.The images attached show the new cycle hub addition, installed to the west of the station, on Graham Road.Hackney Central is a railway station located on the North London Line within Greater London, serving 4.3m annual passengers.   Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities.For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on 01538 380080.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

George Abbott SchoolBauder Thermofol single ply waterproofing system with Bauder Euroglaze rooflightsSynopsisLocated in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed.Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.Bauder Building BoardProject: George Abbott SchoolLocation: Guildford, SurreyRoof Area: 228m²Specifier: Baily GarnerApproved Contractor: Inspire Contract ServicesThe specification Bauder submitted a proposal to refurbish all areas of the failing roof:The gutter area needing standing water to be removed for which Bauder tapered insulation was proposed to create effective drainage falls.The adjoining profiled sheet metal roof requiring a new waterproofing system. The Bauder Profiled Roof Overlay system was determined to be the best solution, using bespoke profiled insulation boards specifically designed to fit the shape of the roof. The Thermofol U15 Fleece Back membrane was then specified as the waterproofing layer providing a robust yet lightweight waterproofing system to the roof.The existing rooflight unit, being one of the problematic areas of the rooftop, was also replaced with Bauder Euroglaze rooflights. Products appliedInsulation infill systemIntended for refurbishing profiled sheet metal roofs or increasing the thermal performance of existing insulated cladding systems.Bauder Euroglaze rooflightsModular rooflight designed to provide high standards of illumination, insulation and ventilation to the interior of flat roofed buildings. These are made to order and the size can therefore be tailor made to fit any roof aperture. The resultBauder approved contractor, Inspire Contracts, installed the roof system and rooflights. Bauder’s expert site technicians carried out over 10 site visits during the 4 months of works on the site. Following a final site visit and a leak test Bauder was able to issue a 20 year product and workmanship guarantee to the client.The choice to use Bauder, a single source of manufacturing for the roof systems and the rooflight, proved beneficial as it enabled Bauder’s flat roof technician team to design out a number of the detailing issues responsible for the historic leak problems and it also eased the installation process for the client and the approved contractor, as Bauder provided its integral service from the roof survey to the final site visit and the issue of the guarantee.System installed Bauder Thermofol PVC single ply waterproofing system 1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 DeckProfiled sheet metal
Sponsored
Heron Tower, London

Heron Tower, London

Vebro Polymers

Client: Heron Tower, LondonLocation: Bishopgate, LondonSector: Mixed-Use FacilityYear: 2021Project Size: 500 m²System: vebrodeck IDHeron Tower, a mixed-use high-rise development in London, required a bright, welcoming and durable floor coating material for its bike and scooter storage area, an environment used by the residents and staff of businesses based in the building. Heron Tower, located at 110 Bishopgate in the heart of London, is a mixed-use facility providing over 440,000 sq ft of premium office and leisure space over 36 floors. Enhanced to achieve net zero carbon, the building features a façade of solar panels and has achieved a BREEAM rating of Excellent. The impressive contemporary landmark, situated just a short walk from Liverpool Street Station, was — at the time of its construction — the tallest high-rise in the capital, standing at 230m tall including its mast. Featuring a range of corporate office spaces, restaurants and leisure spaces, as well as Britain’s largest privately-owned aquarium in its impressive lobby, the development has been designed to impress, providing building users with a premium experience throughout. This has extended to its more functional areas, with the transformation of its bicycle storage area; a dedicated space where building users are able to securely store their pushbikes and scooters. Installed in a combination of RAL 5018 Turquoise Blue and RAL 7035 Light Grey, the installation of vebrodeck ID has created a welcoming space for the building's climate-conscious cyclists and scooters to safely store their vehicles. vebrodeck ID is a durable resin deck wearing system, designed for use on driveways and parking bays of internal or basement level decks of multi–storey parking structures. vebrodeck ID is a protective deck coating system offering excellent wear resistance. The system deadens noise from unpleasant tyre squeal, is available in a wide range of colours, protects against oils, fuels and de-icing salts and can be tailored to ensure an anti-slip finish. 
Sponsored
Ellon Lodge

Ellon Lodge

Catnic, a Tata Steel Enterprise

Catnic's® Urban roofing and cladding system has provided the ease of installation, aesthetics and lightweight performance needed for a holiday lodge in Ellon, Scotland. When owner Kevin Marr realised that the product provided a convenient zinc alternative – he went on to install the roof himself in just four weeks.The holiday lodge is situated opposite the River Ythan in Ythanbank, Glencroft. The lodge will be rented out to tourists as it offers an ideal location to explore the beautiful surrounding landscape of Scotland.Kevin Marr works as a local plumber in the Glencroft area and undertook his own extensive research on building materials for his holiday lodge. After understanding the performance benefits provided by the pre-coated metal standing seam Catnic® Urban system, Kevin realised it would be an ideal alternative to zinc. He then attended a training session through Burton Roofing Merchants to ensure he had proper guidance when it came to installation.“This is the first time I’ve ever worked with the Catnic® Urban system and it was outstanding – incredibly easy to use,” said building owner Kevin Marr. “I was working through the Christmas holidays to install the roof and therefore it was paramount that the system was lightweight and quick to install. In addition, I needed a robust and durable roof to withstand the, at times, brutal Scottish winds.”Manufactured from Tata Steel’s Colorcoat HPS200 Ultra® pre-finished steel, Catnic's® Urban roofing and cladding system is a cost effective alternative to traditional copper and zinc systems and is seven times lighter than traditional roof tiles. The system is manufactured to meet all relevant legislation, including load bearing for wind speed in accordance with EN 1991-4 and weather tightness in accordance with BS 5534 Parts 1 and 2.Kevin continued: “I am delighted with the way it’s turned out and appreciate the way the Anthracite Grey complements the surrounding environment but at the same time, provides the building with a contemporary aesthetic. I would happily use the system again if I build any further holiday lodges.”Furthermore, the Catnic® Urban panels are 100% recyclable, with a carbon footprint that is three times lower than some of the leading eco-designed urban roofing products. Recognised by independent BBA certificate that the material used to manufacture Catnic® Urban will have durability for a period in excess of 40 years in normal urban, suburban and rural environments.
Sponsored
The Terrace | Lee Valley

The Terrace | Lee Valley

RYNO

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!
Sponsored
Olympia London

Olympia London

CDM Stravitec

As part of cultural regeneration of the Olympia Exhibition Venue, Olympia Central Hall has been demolished and the iconic structures of Olympia National and Olympia Grand, both Grade II listed buildings, are being incorporated into the site’s overall redevelopment. The West Hall Exhibition Space is being structurally strengthened to allow for a two-story music venue to be constructed above the existing exhibition hall.It is necessary to isolate the Central building, originally known as Empire Hall, from the West Hall performance space to prevent music and entertainment noise disturbance.Three massive bearing assemblies comprising solid thick steel plates holding Stravibase VHS bearings, which were pre-compressed using our patented frozen bearing technology.A small mock-up (approx. 1/3 of the size) was also constructed, and fire tested at Liege University, comfortably achieving a two-hour fire rating.Music and entertainment noise breakout from this new venue causing disturbance to residents.A custom designed Stravifloor Deck solution with rubber bearings isolating the concrete roof flab from the structure below. This complex floating roof is laid to multiple falls by using supporting rails that are tapered to suit.
Sponsored
FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY™ TBA

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food WarehouseForming a fresh element to the UK’s critical food supply infrastructure, a new distribution warehouse in Wakefield, West Yorkshire, is near to completion with the specialist suspended ceiling installer making use of ZEUS Lite™ 90:30 from the range of TBA FIREFLY™, to create vertical fire barriers at intervals within the roof-space across the footprint of the building.The 15,300m2 facility at Headways in Stanley, on the outskirts of Wakefield, has been built by GF Tomlinson for the Kitwave Group, a national distribution business with a fleet of over 500 vehicles supplying hotels, restaurants and many other venues across the country. The installation of the ZEUS Lite™ was undertaken by Nottingham Suspended Ceilings, as the sub-contractor well experienced with the performance and user-friendly characteristics of the Firefly range.All the rolls of ZEUS Lite™ 90:30 material and the well proven FIREFLY™ fixings, including stainless steel staples and fire-resistant adhesive, were supplied to Nottingham Suspended Ceilings by the merchant, Minster On-line.The site agent for Nottingham Suspended Ceilings, Mark Prescott, commented: “Our company carries out commercial contracts right across the East Midlands and beyond, where we have made use of Firefly barriers on a large number of past projects. Although you have to be a competent contractor and follow the manufacturer’s guidance precisely, we find the ZEUS Lite™ and other products in the FIREFLY™ range straightforward to install. In the case of the warehouse here, we have now completed the installation of the fire barriers up to roof level in dozens of locations across the building; as well as installing all of the suspended ceilings throughout.”FIREFLY™ ZEUS Lite™ is ideally suited to this type of application, comprising a flexible woven fabric fire barrier that has been specifically developed for the vertical separation and compartmentation of extensive concealed spaces within buildings.By offering 90 minutes integrity and 30 minutes insulation, FIREFLY™ ZEUS Lite™ 90:30 exceeds the minimum requirements regarding fire barriers under the Building Regulations’ Approved Document B (Fire Safety). The specially treated glass fibre fabric is strong and resilient as well as flexible while, crucially, the system’s certification covers the inclusion of service penetrations; which many alternative products do not.
Sponsored
Eclectic, Bangor

Eclectic, Bangor

EGGER (UK) Ltd

Located in the small, but lively town of Bangor, Eclectic, a luxurious mind and body wellbeing retreat, has opened a three-story studio on the main street. The state of the art studio features wall and ceiling slats throughout the tranquil and elegant space in woodgrain decor H1146 ST10 Grey Bardolino Oak, which fits in perfectly with the contemporary interior. Its light colour tones and delicate texture complement the other materials used in the design, to create a warm and inviting space. As well as the slats, the decor was used to create wall units, door frontals and shelving.
Sponsored
Slatted wall and ceiling features in premium residential development - MicroSlat

Slatted wall and ceiling features in premium residential development - MicroSlat

Vtec Group

The MicroSlat System was specified in three areas of this premium development, each space requiring very unique shapes. Bespoke spacing was required in order to accommodate LED strips between the grooves. The client ordered MicroSlat 25-18 that was spray finished to a high quality sheen using a bespoke lacquer finish to match other materials at the site. Black slat core and black acoustic backing complete the look to help transform the interior. MicroSlat was specified as it's a lightweight, modular system that's easy to install, which provides excellent acoustic absorption for a space with such high ceilings.
Sponsored
Steigenberger Hotel & Spa design

Steigenberger Hotel & Spa design

Rock Unique

In the picturesque Wachau Valley, among numerous vintage taverns and art galleries, lies the city of Krems an der Donau, an ancient town on the Danube that enjoys an exclusive natural landscape surrounded by greenery.A short walk from the city centre, nestled among the surrounding vineyards, the Steigenberger Hotel and Spa offers guests a warm welcome with a modern style where they can breathe in a calm ambiance with relaxing views of the old town of Krems or the Danube Valley. In this setting suspended somewhere between tradition and the search for contemporary style, the elegance and practicality of Atlas Concorde products stand out in some indoor areas of the building. Realism, simplicity, and technical performance: the strength of a natural material inspired by stone covers the walls of the rooms in a warm shade, creating a strong yet natural and welcoming atmosphere. Veins, shading, and inclusions of materials offer a contemporary design, creating a synergy between reliability and beauty. On the other hand, the interpretation of the concrete effect in a ceramic material creates the perfect background to experience moments of relaxation in the suites and the spa. Original decorations and elegant porcelain surfaces embellish these spaces, the floors and tiles interacting in perfect chromatic harmony.
Sponsored
Case Study - Proteus Pro-System® - Emma House

Case Study - Proteus Pro-System® - Emma House

Proteus Waterproofing

Emma House, Romford, a residential apartment block built in 2007, needed a new waterproof membrane for the entire roof area after the single ply membrane, installed just 10 years earlier, had failed. The specification by our clients asked for a cold applied system to be used during the refurbishment to minimise disruption to residents, while providing a permanent waterproofing solution.The ChallengeCore samples taken of the roof build-up showed there had been extensive water penetration which required urgent remedial action. Impossible to repair, the complete roof system had to be stripped back to the roof deck by Proteus Waterproofing’s approved contractor. The approved contractor installed a new Proteus Pro-System® BUR (built up roof system) incorporating Proteus Pro-Therm insulation, to provide a new seamless roof – an area of some 150 square metres – offering a 20 year guarantee.Why Proteus Pro-System® was specifiedProteus Pro-System® was installed using no heat, providing a seamless waterproofing membrane on completion. Proteus Pro-System® is a high performance, seamless and cold-applied waterproofing membrane for flat and pitched roofs. It cures to provide completely seamless waterproof protection and has excellent thermal and UV stability, making it suitable for use in all climates.Proteus Pro-System® does not brittle, deteriorate or discolour with age. It uses atmospheric moisture to trigger its cure process and unlike conventional polyurethane systems can cure under water, without gassing or foaming. It also becomes resistant to rain damage and may therefore be applied in relatively poor weather, without any subsequent loss of performance or durability – making it ideal for Emma House.About Emma HouseEmma House consists of 14 one-bedroom and 19 two-bedroom apartments just minutes away from the centre of the market town of Romford, which offers shops, services and a wealth of bars and restaurants. When first built in 2010, Emma House offered young professionals an opportunity for affordable housing close to London and has remained at the forefront of the property market in Romford ever since.
Sponsored
Broughton & Yeomans Apartment Block

Broughton & Yeomans Apartment Block

Polyroof Products Ltd

Broughton & Yeamans House are high rise apartment blocks in Bristol, Avon, under the management of Bristol City Council. The roof areas, totalling over 3,500m2, had originally been waterproofed with asphalt and then later treated with a coating repair.Unfortunately, water ingress continued to be a problem with leaking occurring at numerous locations. Not wanting to cause further disruption to the residents and to avoid costly damage to the interior of the buildings, the council contacted Polyroof and a survey of the roof was arranged.The survey by Polyroof’s Technical Services highlighted the extent of the issues within the roof, including identifying water ingress through the many vertical sections present on the roofs, including parapet walls and the lift house building. After performing core tests on the roof, it was shown that the existing roof build, which contained insulation as part of a warm roof design, was in a suitable condition to be retained and overlaid – avoiding costly disruption for the client and residents.A bespoke specification was drawn up by the Polyroof Technical Team that provided a comprehensive set of recommendations to ensure the apartment blocks were fully protected from the elements.To make sure the roof could be left in a totally weatherproof condition, it was necessary to treat not only the flat roof sections but the vertical areas too. The client was keen to improve the thermal performance of the buildings by adding additional insulation, but it was imperative that disruption was kept to a minimum – not only would stripping works impact on the buildings’ residents, but hauling waste materials from such a great height would be costly and logistically challenging.With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that the apartment block could not be better protected for decades to come.
Sponsored
Rhyl Railway Station Restoration

Rhyl Railway Station Restoration

Polyroof Products Ltd

Long standing and rich in history, Rhyl Railway station was opened on 1st May 1848 and was part of the Chester and Holyhead Railway Company’s line. The Station itself is located close to the centre of Rhyl, a lively seaside town on the North Wales coastline and a popular destination for many tourists across the country.As part of a Railway Upgrade Plan, Network Rail have invested £50 million into the restoration of stations across the North Wales Coast. Rhyl was one of the first stations to receive this upgrade and when it was shown that various roofs of the station were in need of restoration.The ChallengeRhyl was one of the first stations to receive this upgrade, and when it was shown that various roofs of the station were in need of restoration, Polyroof was chosen to help restore them to their former glory, and a survey was organised.The specified areas that were in need of refurbishment included the roof over Platform 2 and the bridge walkway roof which connected the two platforms. The existing waterproofing on these areas consisted of built-up felt with a mineral cap sheet, which was in an aged condition and beginning to show signs of failure such as splits and blisters. Leaks were now beginning to occur which were in danger of affecting the condition of the roof structure itself.The SolutionBased on the findings of the survey conducted by Polyroof Technical Services, a bespoke specification was designed that would eliminate the current issues through the installation of the BBA-approved Protec system. Due to the roof being situated above unheated areas, there was no requirement for new insulation within the build up. Firstly the existing built-up felt was stripped and removed from site to expose the original close-boarded timber which was inspected for defects, made good where required and retained where possible. Defective areas where replaced with new timberwork as required. In order to provide a sound, solid substrate a new OSB3 TG4 deck was mechanically fixed across the whole area within a phased approach, ensuring the roof was kept watertight as works progressed.The Protec system was then applied directly to the timber; with its RapidcureTM technology large areas where able to be made fully waterproof within short periods of time. Polyroof Technical Services visited site regularly to ensure works were being completed to the high standards required and regular reports were fed back to the client. Upon completion a final inspection by Polyroof led to the roof being signed off and guaranteed, giving the client complete peace of mind that their roof will be fully watertight for at least the 20 years. Polyroof were proud to be part of this project to restore Rhyl and its Railway station to its former glory.
Sponsored
Glazing Vision Box Rooflights Feature In Stunning Homes In California

Glazing Vision Box Rooflights Feature In Stunning Homes In California

Glazing Vision Ltd

Four Glazing Vision Three Wall Box Rooflights were specified on four modern new build homes in the heart of Los Angeles which have provided the clients with access to the terrace which would have otherwise not been possible. The Three Wall Box Rooflights fit perfectly with the modern aesthetic and were chosen to not only give access to the roof deck, but to also increase the amount of natural daylight entering each home.“We think the finished rooflights look great as crowns to each of our buildings. They will be a nice addition to these homes and hopefully inspire developers and homeowners to spread the word throughout Southern California regarding the benefits of the rooflights too!” – Michael Wilson-Katsibas, Partner, KAP Studios.Following the demolition of the existing 1200 sq. ft bungalow, the remaining site was still relatively cramped considering the bungalow was being replaced by four new dwellings. In order to provide enough living space and retain the beautiful views of the Los Angeles skyline, KAP Studios had to come up with a creative solution to achieve their brief.To make the most of the small, 8,400 sq. ft plot, KAP Studios incorporated a basement and terrace area into each home which transformed the buildings from two-stories to four-stories, which helped unlock the full potential of these beautiful homes in Culver City.Starting from the ground up, the basement is partially sunk beneath the pavement and accommodates two parking spaces, meaning more space has been granted to the garden area at ground level. This gives each home its own private back garden, as opposed to a less visually impressive driveway. It also includes a pantry and wine store to round off the basement area. The second floors are occupied by an en-suite bedroom which includes a balcony area overlooking a collection of beautiful LA properties.The east side of the bedroom houses an equally impressive bathroom, making it the second Master Bedroom in the homes. The terraces of each building are by far the most unique feature of the homes. With over 20 years of experience in roof access rooflights, Glazing Vision were engaged to help with this important part of the project. Operated by the touch of a button, our Three Wall Box Rooflights were fixed to the existing building structures at the back and either end. The rooflights take up only 170 square feet on top of the roof, leaving the client with a vast amount of additional living space which can be utilised all year round. Our rooflights are installed by our very own expert installation team.“We wanted to both feature the stairs as light shafts to illuminate the interior spaces throughout the day with the California sunlight as well as allow for seamless roof deck access for the future residents.” – Michael Wilson-Katsibas, Director, KAP Studios.Our Three Wall Box Rooflights are a perfect example of how Glazing Vision can help you utilise your roof space whilst providing your home with added natural daylight.
Sponsored
Urban HQ

Urban HQ

Tobermore

Challenge Modern paving flags required for city centre roof terrace at flexible workspace Urban HQ situated in Eagle Star House offers state-of-the-art facilities including meeting rooms, event space, a member’s lounge and bar.  One of its most notable spaces is the rooftop terrace. The roof garden provides co-workers with a valuable communal area to foster company culture or escape from their desk. The terrace offers a flexible space to relax, socialise or entertain while taking in the views of Belfast city and beyond. The central design aspiration was to bring a New York or London feel to Belfast city. It was essential that the roof terrace hard landscaping aligned with the design ethos. SolutionContemporary Mayfair Flags installed on pedestals were the perfect choice  Tobermore’s Mayfair Flags with their granite aggregate contemporary finish were the perfect choice for Eagle Star House. A contrasting finish was created on the terrace in the colours Silver and Graphite. A simple yet effective stacked laying pattern was deployed which adds to the clean look of the contemporary roof terrace. The commercial space has more of a boutique hotel feel than a city centre office. The Mayfair paving flags were installed onto adjustable pedestals, creating a level surface throughout the terrace. The use of this installation system enables the laying of paving flags without the need for grout, sand or adhesive. It also creates a void beneath the paved surface allowing an easy and convenient route for exterior cables or other services. View our Roof Terrace Support for installation on pedestals for roof terraces, balconies and roof gardens.

Showing 685-720 of 898

Feedback