NBS Source
I'm a manufacturer

"electrical mains and standby supply"

4,188 results found

Sort by:

Showing 505-540 of 648

Sponsored
Farringdon Station Escalator Shaft 2

Farringdon Station Escalator Shaft 2

Cordek Ltd

Cordek were tasked with providing a formwork solution to enable the main contractor to cast the ‘knuckle’ intersections between the escalator shaft and the levels above and below.
Sponsored
Hornsby house school washroom refurbishment, London

Hornsby house school washroom refurbishment, London

KWC DVS Limited

Hornsby House School have recently refurbished their washrooms and chose Franke Water Systems to provide over 60 products for their pupil and staff toilets.Franke Water Systems provided a total of 67 washrooms products for the revamp, including a range of Dart Valley branded taps, WCs, flush valves, and a range of Miranit composite washtroughs for the nursery, boys, girls and staff washrooms. The full range of products provided were:17 x AT03-011 Aquarius DM A45 tap 2 x AT00-002 single station mains kit standard pressure 4 x AT00-003 two station mains kit standard pressure 6 x AT00-004 three station mains kit standard pressure2 x SOLX1800T 3 person Miranit washtrough with three tap holes2 x SOLX2400T 4 person Miranit washtrough with four tap holes16 x WC02-011 concealed plastic cistern kit16 x WC03-002 WC Flushvalve
Sponsored
The Rounhouse for Derby College

The Rounhouse for Derby College

Norwood Group Limited

PROJECT OVERVIEWHaving a strong reputation for developing innovative design-led partitioning solutions, Norwood was given the challenge of creating an acoustically sealed teaching pod areas within the iconic Round House grade II listed building at Derby College. The project was commissioned in consultation with Bowmer & Kirkland and Maber Architects.OUR SCOPE OF WORKWe demonstrated our ability to introduce fully demountable and relocatable teaching pods into a grade II listed building, with the benefits of their obvious stunning visual and acoustic appeal. Whilst the solution emphasises the importance of using a design-led partition solution partner, our on-site manufacturing facilitates allowed delivery of finished materials direct to site, thereby minimising on-site disruption. Furthermore, the incorporation of electrical and mechanical equipment within the partition design was a significant to the overall project finish. We provided our Mediline solid and glazed partitions, PodSolve, doors and walk on ceilings.
Sponsored
NEW LITTLE MILL, Manchester

NEW LITTLE MILL, Manchester

Genius Facades Limited

System - Genius Prime & DiscreteMain Contractor - ERIC WRIGHT GROUPInstaller - Axis Envelope SolutionsArchitect - PRP LLP & Scott Hughes Design
Sponsored
Aggreko, Dumbarton

Aggreko, Dumbarton

Berry Systems

Berry Systems supplied and installed Internal and external vehicle safety barriers at new Aggreko, Dumbarton plant to protect; doorways, walkways, columns, site and equipment.Aggreko PLC, the world leader in the field of power and temperature control rental, has become the first company in the UK to have Berry Systems’ new Stopbollards installed at its new 170,000 sq ft Dumbarton facility.The many, internal and external vehicle doorways at the brand new Dumbarton site were identified very quickly as needing special protection. Glasgow architects Bradford Robertson considered a number of options before concluding with main contractors, Morgan Sindall, that our SlowStop bollards would prove a cost effective solution. During a collision, the kinetic energy of the impact is progressively absorbed as the post tilts, compressing an elastomeric sleeve within the base. The post is able to tilt from its vertical position to an angle of 20 before it locks within the base. After the impact the post will return back to its vertical position, ready to perform once again. A total of 104 SlowStop bollards were installed at Dumbarton, along with a variety of other products from our range.https://berrysystems.co.uk/wp-content/uploads/2024/03/Berry-Case-Study-Aggreko-Dumbarton.pdf
Sponsored
Bay Street Urban Regeneration

Bay Street Urban Regeneration

Forterra Building Products

The ChallengeThe former Gourock Ropeworks building on the banks of the River Clyde had been refurbished back in 2006. As part of a multi-million-pound regeneration from the Scottish government, Forterra supplied 170,000 bricks to the site adjacent to the Ropeworks for 41 new social homes.The design of the four-storey blocks of residential apartments was to tie in with the original design of the former Gourock Ropeworks.The SolutionForterra’s Farmstead Antique brick type was put forward for the build owing to its highly textured face and warm appearance, which sat well with the tone and texture of brickwork in the surrounding properties.The BenefitsSteve Nicolson, Area Sales Manager for Forterra, said, “The Farmstead Antique was a good match to the local vernacular, and is also pretty hard-wearing, which made it very suitable for this location on the banks of one of the longest rivers in Scotland, as it will need to withstand the elements.”Adelle Jess, Project Architect for JM Architecture, said, “Due to the site being located within the historic curtilage of a listed building, the development needed to provide a strong frontage to Bay Street with fenestration, proportion and material finishes relative to the context in which it sits.”“Forterra Farmstead Antique was selected as the main finish to the buildings so as to tie in with the existing surroundings and contribute to the overall design concept of a modern interpretation of the site’s industrial past.”
Sponsored
Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at
Staines in Middlesex

Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at Staines in Middlesex

NCC – Emseal Movement Joints

Owner: Aberdeen Asset Management Principal Contractor: Cemplas Waterproofing & Concrete Repairs Ltd Main Products Used: EMSEAL SJS systemCemplas has recently completed repair works at the Elmsleigh Shopping Centre in Staines, which included the replacement of deteriorated and failing mechanical movement joints in the service decks. The Centre’s retail units are supplied via ramps to these service decks, which carry the delivery traffic above the stores, plus the decks are also used for car parking, meaning that in addition to being fully exposed to weathering, they are subject to almost continuous dynamic loading from traffic up to and including heavy articulated HGV’s. Unfortunately, despite past attempts at repair and resealing, there had continued to be water ingress through these joints, both into the structure and into the retail units that are directly below, resulting in disruption, damage and cost for everyone involved. The innovative Emseal SJS system that includes integral cover plates, but with no mechanical fixings required, was selected by the Project Engineers as being ideal to accommodate the necessary movement, seal the joints and withstand the traffic loadings. Additionally, as access was only required from the top deck to install the Emseal SJS System, Cemplas was able to carry out the works quickly and keep disruption to an absolute minimum.
Sponsored
Fulwith Mill

Fulwith Mill

Fosroc International Limited

THE PROJECTFulwith Mill in Harrogate is located in an exclusive upmarket area – so much in fact, in 2019 Fulwith Mill Lane was named by Zoopla as the most expensive road in Yorkshire. For this new build project, Fosroc were asked to specify suitable products for the waterproofing aspect of the basement construction. The main challenges included a high water table, high clay concentration in surrounding area leading to a perched water table, and potential for hydrostatic pressure against the basement construction. Howard Civil Engineering was the main contractor for the project, with Fosroc being selected as materials supplier due to a long standing relationship between the companies, and a number of previous deployments.THE SOLUTIONFully bonded Proofex Engage membrane was used on the basement slab, combined with Supercast Watertight Concrete Powder (WCP) to provide a high level of resilience to both water ingress and potential defects. Supercast WCP is a concrete admixture that reduces porosity and permeability, increasing water and corrosion resistance. The vertical elements were cast in Supercast WCP with Proofex 3000, to provide a greater degree of flexibility to enable the contractor to install effectively in the tight spaces around the site, and around the complex shape of the structure. Proofex 3000 is a cold applied, highly flexible waterproof membrane – ideal for application of membrane around intricate building features.THE BENEFITSThe products specified for this project provided multi-layered and seamless protection to the underground element of this exclusive residence to meet stringent BS8102 Type A waterproofing standards. Proofex Engage provides water, water-vapour and gas protection to water excluding structures such as basements, and protects concrete from aggressive ground salts, chemicals and hydrocarbons. It is supplied with a self-adhesive strip on one side of the roll to provide sealed laps and comes with a range of auxillary products (for this project, Supercast SW20 Hydrophillic Waterstop) to form a complete waterproofing solution and simplify application for the contractor. Its unique mesh system bonds permanently to concrete, remaining in pace even if settlement takes place – the exceptionally high bond strength of Proofex Engage - 2.96kN, sets it apart from the competition, at 70% stronger than the leading chemically bonded membrane.
Sponsored
Barrington Road in Brixton

Barrington Road in Brixton

FastClad

This development of 104 apartments was built on behalf of the Metropolitan Housing Trust by Guildmore on an infill site at Barrington Road, Brixton, which forms part of the Loughborough Estate.The project was designed to meet Level 4 of the Code for Sustainable Homes and has been tested to meet BS8414 part 2 Fire Performance of External Cladding Systems.FastClad Brick Slip Rainscreen Cladding System was used on the tower elements at the end of the main block, the balconies, as well as the third and fourth floors of the main building.FastClad was chosen for it’s weight, ease of installation, fire properties, as well being indistinguishable from the areas of traditionally laid masonry
Sponsored
Social Housing – Dundee

Social Housing – Dundee

Russell Roof Tiles

Mill ‘O’ Mains is a major social housing development of 300 new homes and is part of Dundee City Council’s ongoing regeneration plans to replace outdated properties.
Sponsored
Vita Coventry student accommodation

Vita Coventry student accommodation

Drywall Pro-cut Ltd

Project: Vita CoventryLocation:CoventryMain contractor: Bowmer & KirklandProduct specification: British GypsumContract value: 3 millionProgramme duration: 59 weeks
Sponsored
The Gate - Sheffield

The Gate - Sheffield

Duco Ventilation & Sun Control NV

In the heart of the vibrant student city of Sheffield lies The Gate, a modern student accommodation scheme that houses 455 students. The imposing building is situated along the busy main road bordering Sheffield Hallam University and is equipped with numerous facilities including a gym, rooftop terrace, and a cinema… The complex is truly a diamond among student residences. The installed DucoMax sound attenuating window ventilator makes a major contribution to the healthy indoor climate of the building.About The GateIn the heart of the bustling student city of Sheffield, surrounded by a number of busy roads and right next to Sheffield Hallam University, is the brand-new student accommodation - The Gate.   Numerous facilities contribute to a pleasant living environment for the 455 students who live there, including a gym, a spacious rooftop terrace with breathtaking views, a cinema room, communal kitchens and study areas.A Healthy Indoor ClimateAt The Gate, attention is not only paid to different accommodation levels for the students, but also their long term wellbeing and as part of this a healthy indoor climate is also highly valued. On average we spend 90% of our time indoors. Good ventilation ensures a healthy home and prevents health problems such as dry eyes and throat, headaches while studying, loss of concentration and stress among the students. In addition, good ventilation has been shown to improve learning performance by up to 23%. The Gate opts for a natural ventilation system in which fresh air is supplied through the facade. The DucoMax acoustic window vent not only ensures a plentiful supply of fresh outside air, but also reduces any outside noise from the city below to a maximum (up to 53 dB).Reducing noise nuisanceThe ventilation system supplies fresh air via the DucoMax acoustic window vent in the living and sleeping areas, while in humid rooms polluted air is removed. The central location of The Gate provides easy access to the vibrant city of Sheffield, but unfortunately this can cause a lot of noise nuisance too due to the busy traffic. The DucoMax was developed specifically for buildings with high levels of noise disturbance, to keep the noise out. The integral self-regulating valve also keeps the air flow constant during differing wind pressures. As a result, students are hindered as little as possible by these external factors. The combination of the various facilities with a healthy indoor climate contributes to an optimal learning and living environment for the students.
Sponsored
Easy Evacuation!

Easy Evacuation!

C-TEC (Computionics Limited)

C-TEC’s revolutionary new evacuation alert system, EVAC-ALERT, has been specified for a new purpose-built residential building in London.Located in the Elephant and Castle area of the London Borough of Southwark, Joyce Newman House is an 8-storey block of 40 spacious living spaces commissioned by Leathermarket JMB, Southwark’s largest resident-managed housing organisation. The affordable-housing development also features landscaped gardens, an interactive playground and a communal kitchen garden for residents to grow their own vegetables.Specified and supplied by Churches Fire & Security working alongside Blu Electrical Installations Ltd, C-TEC’s EVAC-ALERT has been designed to comply with the new BS 8629, which recommends evacuation alert systems be installed in all new blocks of flats over 18 metres to assist the Fire and Rescue Service (FRS) in evacuating part or all of a building in an emergency.The system consists of a 2-loop control panel connected to a host of single and multi-way interface units, self-testing sounders and visual indicators. Simple and intuitive with manual controls to allow firefighters to easily operate the evacuation alert devices located inside flats on a zone by zone or floor by floor basis, the panel is stored in a secure vandal resistant cabinet which can only be accessed by the FRS using a special copy-protected key.David Collins, Project Manager at Churches Fire & Security, said: “Evacuation alert systems ensure firefighters can alert occupants in a building of the need to evacuate if a fire gets out of control. The EVAC-ALERT system we’ve specified provides peace of mind for residents and, crucially, also demonstrates that building management have taken every precaution possible to protect the people residing in the property. Our client is delighted with the system.”Certified to all relevant EN54 product standards, EVAC-ALERT is powered by C-TEC’s CAST protocol and fully compatible with ENVISION, its powerful new cloud-based remote access data management software which can be used to provide duty holders with a verifiable audit trail of system activity and device testing.
Sponsored
The Paddocks

The Paddocks

Lignacite Ltd

Nestled in a secluded location, the village of Lavenham has been a picturesque place to live since its mediaeval origins. But with housing supply limited within the bounds of the existing village, in 2016 residents voted for a new development to go ahead – providing it was in-keeping with their historic homes.The designs of The Paddocks’ 25 new properties therefore draw on influences from the Tudor and Regency homes and cottages already lining the streets of the village, reflecting their style and materials. Ranging from two to four-bedrooms, each home has been gifted its own individuality, with traditional finishes, such as rendering and weatherboarding linking them back to the original properties. Attention to the quality and scale of landscaping around the site has also been factored in to mirror the countryside that embraces the site.However, while the new homes certainly have similar characteristics to the houses already in the village, they do not share their energy inefficiency. Beneath the traditional finishes are contemporary homes with ambitions to keep carbon emissions to a minimum. To do this, Hartog Hutton decided to take a two-pronged approach to reducing CO2 emissions: by installing solar panels and electric car charging points, and by using thermally insulative fabrics, including blockwork.For the structural foundations, the housebuilder therefore turned to Lignacite’s 100mm and 140mm Lignacrete blocks, which are designed for high-strength uses. With an A1 fire rating, Hartog Hutton could also ensure that future residents would have an additional layer of fire protection.Lignacite Ash GP blocks then form the bulk of the buildings. With strong and durable characteristics, these blocks are ideal for all kinds of applications. More importantly, they also have great thermal insulation of 0.298 m2K/W (for 1400mm blocks at 3% moisture), which satisfies all the latest requirements of the Building Regulations Approved Document L.The remainder of each structure uses Lignacite’s Fibo 850/950, which forms the substrate for the weatherboarding and rendering. They provide an excellent surface for these finishes while also adding to the overall thermal insulation of the property. A final advantage is that these blocks are extremely lightweight and can be put into place one-handed.
Sponsored
Clinique des Grangettes, Geneva (Switzerland)

Clinique des Grangettes, Geneva (Switzerland)

Record U.K. Limited

Located near the centre of Geneva, the Clinique des Grangettes enjoys a privileged, quiet location. Its main specialties are maternity, special surgery, cardiology, oncology, paediatrics and radiology.
Sponsored
Orbis OS211 Glass Balustrades at Imperial College, London

Orbis OS211 Glass Balustrades at Imperial College, London

Delta Balustrades Ltd

Orbis OS200 Vertical Bar Infill Side FixOrbis OS211 Glass Infill Top FixProviding more than 120,000 sq ft, of innovation space for high growth enterprises, this project is situated within Imperial College London’s White City campus. Built by a market leader with specialist expertise in modular buildings, this project demanded a high level of innovation, and a balustrade supplier that delivered on cost, quality, and timescales. The main reception area is dominated by a large feature stair providing access to all floors, and the Orbis balustrades with glass infill achieve a stunning first impression and allow maximum light through the space from the vast glazed roof lights above. Throughout the three core stairs, which are used for general circulation and escape routes, the vertical bar infill panels within the Orbis balustrade was used. This robust modular panel solution is pre-manufactured to speed up installation on site, which was extremely important to the main contractor. Individual stair cores were not closed for extended periods of time, which means greater productivity, less management time, and reduced risk for the main contractor.
Sponsored
Queens House - Profipress and Viega Smartpress

Queens House - Profipress and Viega Smartpress

VIEGA LTD

Viega has supplied its cold applied Profipress and Sanpress Inox press connection systems to the latest refurbishment of the 17th century Queen’s House in Greenwich.Queen’s House, a Grade I listed building and scheduled ancient monument, was originally built between 1616 and 1635 and is the last surviving section of the palace of Greenwich. Queen’s House is now part of the Royal Museums Greenwich and is home to a large collection of important paintings, drawings and sculptures. Over the last few years the 400-year-old building has undergone a program of vital maintenance.The scheduled ancient monument protection is granted to sites of national architectural importance and makes it a criminal offence to damage the monument in question. The importance of the building meant that during the maintenance work the materials and methods used had to be carefully considered. For example, no hot works of any kind were permitted on-site so traditional soldering or brazing of pipework was not an option.Mechanical and electrical maintenance specialist Red100 was selected to carry out the work as the latest in a number of contracts to work on the building. The renewal of the pipework systems included the heating and chilled water systems, for both of which the supply comes off a header pipe from a plant room located in another building. The contract also included work on the greywater system.As a result of the restrictions on hot works, press connection technology was the chosen methodology for the pipe installation. Viega’s Profipress system was selected for use on the copper heating and water pipework while the stainless steel greywater pipe was connected with Sanpress Inox fittings.Stephen Phillips, Director at Red100 said: “We were familiar with press connection technology, having employed it on a number of similar projects. We had been recommended the Viega systems and were impressed by what we saw when we visited Viega’s production facilities in Germany.”Paul Burkett, Technical Sales Manager at Viega commented: “After discussing the requirements with Stephen at Red100 we were confident that the Viega products fitted their needs exactly. Also the range of different press connection options offered by Viega meant that there were suitable products available as the scope of the work expanded.”Due to the historical significance and protected status of the building as well as the priceless nature of the artwork housed within the Queen’s House, the security of the connections was paramount. Any water leaking from incomplete or inadvertently unpressed joints had to be avoided due to damage it would cause. The SC-Contur feature designed into products from across the Viega range, including Profipress and Sanpress Inox, ensure that any missed connections are reliably identified during testing. This avoids expensive and potentially damaging failures once the project is complete.Stephen Phillips concluded: “We were delighted with the performance of the products. The installation on Queen’s House went very smoothly and as a result we have subsequently used the Viega systems on other projects."
Sponsored
Skyfold fully automatic vertical rising acoustic moveable wall - Strathclyde University

Skyfold fully automatic vertical rising acoustic moveable wall - Strathclyde University

Style - Moveable Partition Specialists

Working with architects, BDP Glasgow Studio and main contractor, Balfour Beatty, Style was specified to create flexible space in both the auditorium and one of the main classrooms in Strathclyde University’s £60 million new Learning & Teaching Building. In the tiered auditorium, a Skyfold Zenith stepped moveable wall was the ideal solution. Offering an outstanding 59dB acoustic rating and descending from the ceiling at the push of a button, the vertically rising moveable wall offers a unique ‘thin path of travel’ which means it can descend into tight spaces, in this case the narrow gap between the seating. In the main classroom, a Dorma Hüppe Variflex moveable wall offers a 56dB acoustic rating and its semi-automatic operation means the acoustic seals are applied to the correct pressure to maximise the effectiveness of this operable wall. “We were delighted to have been specified to add adaptability to key areas of this iconic building,” said David Louden, Style’s director for Scotland, “particularly as we also previously installed a Skyfold at the University of Glasgow as well, which means we have been the chosen provider for both of the city’s universities. “It reinforces our position as the market-leading moveable partition and folding wall specialist in Scotland, and across the whole of the UK. “The Skyfold looks fabulous in situ, with clean, white panels and is a real showcase for the University, and the classic laminate white finish on the Variflex complements the styling of the main classroom perfectly."Built with a sharp focus on sustainability, the Learning & Teaching Building was created through the refurbishment and integration of two existing buildings – the Colville Building and the Category B-listed Architecture Building. It is a collective space for all students and staff, comprising a variety of first-class learning and teaching facilities. 
Sponsored
New Reception Desk For Mission Communications

New Reception Desk For Mission Communications

Anderson, GEC Ltd

Web developers, Mission Communications, were looking to make a positive impact on visitors to their West End offices. Stainless steel specialists, GEC Anderson ,were asked to provide the stainless steel elements, comprising surface, side-panels and shelf components that formed part of the main reception counter. With some imaginative use of lighting as well as glass panes, the result was very creative but also highly professional looking. Behind the main counter were some other stainless steel worktops as well as sinks that formed part of the office tea point and catering facilities.GEC Anderson’s usual EN 1.4301 grade brushed satin stainless steel was used throughout.
Sponsored
Bowdon Church School, Altrincham

Bowdon Church School, Altrincham

Twinfix Limited

Charles Shorland of architects Bowker Sadler of Stockport incorporated two Twinfix canopies into the design and Twinfix worked closely in collaboration with main contractor Willmott Dixon to fulfill their part of the project.
Sponsored
GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

Anderson, GEC Ltd

GEC ANDERSON OFFERS PRISTINE PERFORMANCE FOR UCS SPORTS PAVILIONThe fit out of a major new academic sports facility in North London has included the selection of custom built sinks, work-surfaces, shelving and other stainless steel units, manufactured and installed by sector specialist, GEC Anderson.The University College School Sports Pavilion in Hampstead has been designed by Marcus Beale Architects (MBA) with LIFE Build Solutions of High Wycombe filling the role of main contractor. The area was farmland until the 20th century. The use as playing fields dates from the 1920s.The 18th month project encompassed upgrades to the schools playing fields themselves and the erection of a two-storey structure with extensive changing room facilities, showers and toilets on the first floor. The comprehensive catering facilities include kitchens large enough to serve a dining area which can seat 200. Amongst the stainless steel fabrications designed and fashioned by GEC Andersons highly experienced workforce are a number of base units which combine with single section work-surfaces, sinks and splashbacks to create an easily cleaned, hygienic and ergonomic working environment.As well as the actual kitchen, GEC Anderson also supplied adjustable wall shelving and an L-shaped, three level base unit for a food storage and preparation area. In several places GEC Andersons site survey and subsequent liaison with the project team, which also included The Litmus Partnership Ltd. Catering Consultants, led to units being tailored to fit around structural columns and to accommodate different sized pieces of catering equipment.The stainless steel back bar, with associated fabrications and appliances were also supplied and installed by GEC Anderson.A spokesperson for MBA commented: In 2015 MBA won an invited competition to design a new sports pavilion on the site. Thorough analysis of the topography and the wider views led to a radical design for a pavilion in two parts, linked by a bridge angled westwards to align precisely with the Wembley Arch.
Sponsored
Student accomodation Fallowfield - Manchester

Student accomodation Fallowfield - Manchester

Duco Ventilation & Sun Control NV

DUCO contributes with sun protection to the £78m project for The University of Manchester. The architectural sun control DucoSun Ellips 200 mm, supplied by Contrasol, was chosen for the Fallowfield campus. The solar shading is so much more than decoration.About the Fallowfield CampusThe Fallowfield is a student accommodation with 8 multi-storey blocks including a Warden’s flat and Energy Centre, amenity hub, landscaping and external works. Each residence will have 10 bedrooms per floor with ensuite bathroom pods and a shared kitchen. 1,122 student rooms are spread over the blocks with a combined floor area of 32,020m2. The Fallowfield Campus is the main residential campus of the University of Manchester. It’s a vibrant place where thousands of students live alongside residents – creating e a real sense of community. The mix of shops, cafes, bars and a frequent bus service to and from the city centre makes it an ideal location to live.Construction detailsThe blocks are constructed using pre-fabricated lightweight steel framing system panels which provide structure to the building when used along with composite concrete floors. External materials are predominantly buff brickwork with feature elevations picked out in charcoal fibre cement slate roofing and cladding. Study bedrooms incorporate built-in storage and furnishings and a high specification pre-fabricated GRP en-suite shower pod.  Solar shading is much more than decorationThe vertical solar shading system DucoSun Ellips was chosen for this project and supplied by Contrasol. This solar shading system, in which a blade with of 200 mm was chosen, guarantees not only maximum daylight, thanks to the optimal inclination angle and number of louvre blades. At the same time, DucoSun Ellips 200 ensures that the sun’s rays do not get a chance to heat up the Fallowfield interior spaces directly. The vertically installed solar shading system offers maximum privacy while maintaining the view outside.
Sponsored
Dubai Airport

Dubai Airport

FSi Limited

Installation - Upgrade of perimeter walls Main Contractor - BKS, Specialist Installer - Steel tech, Client - Government of Dubai Date - 2004—2008 the extensive use of Stopseal Batt and Pyrocoustic Sealant
Sponsored
Saltburn on Sea Attenuation

Saltburn on Sea Attenuation

Marshalls Civils & Drainage

Castlehouse Construction has the £7m main contract to build three industrial units totalling 29,950 sq ft for Carnworth Estates adjacent to the Pheasant Fields Lane retail park in Skelton.
Sponsored
Olympic Way, Wembley Stadium

Olympic Way, Wembley Stadium

Tobermore

Tobermore provide HTA with a striking hard landscaping solution for the redevelopment of Olympic Way, the main pedestrian route connecting Wembley Station and Stadium. This successful scheme was shortlisted at the New London Awards 2014.
Sponsored
Designing a Dream Kitchen on Television with DCM

Designing a Dream Kitchen on Television with DCM

Warmup plc

The Allsop family started planning their kitchen renovation project in September 2021 and wanted to create an inviting room featuring special touches such as glass work surfaces alongside the latest in energy-saving technology. As they had already installed underfloor heating in their home before, they knew that an electric floor heater would be the ideal heating solution due to its ease of use, sustainable technology, and low running costs. The DCM-PRO was chosen as the most efficient solution, offering rapid installation times and increased and huge savings on energy bills due to its efficiency, further enhanced after being paired with our 6iE Thermostat. This system was perfect for use with the Allsop’s new Karndean vinyl floors and is also ideal for kitchens with stone or ceramic floor tiles as its decoupling technology helps protect tiled floors from damage. The low-profile design of the DCM-PRO is also perfect for all types of refurbishment projects in rooms with fixed ceiling heights as it will have a negligible impact on floor levels.
Sponsored
Zinc clad windows in contemporary community church

Zinc clad windows in contemporary community church

Fakro GB Ltd

Westhill Community Church was a new, green field project in Aberdeenshire. Its highly contemporary style was designed for maximum functionality and to encourage use by the wider community. Natural light and climate controllability were the central considerations for the clients of McLean Architects during initial discussions - a common request for high ceiling, large space developments.The architect, McLean Architects (based in Glasgow), had used FAKRO roof windows on a number of other projects and specified FAKRO products because of the excellent technical support and the option to specify matching zinc flashings.33 FAKRO roof windows were discreetly positioned to flood the stage with natural light as well as illuminate a cluster of buildings that formed the sanctuary, low-rise foyer, and adjoining offices.Products included electrically operated FTP-V U3 windows with a rain sensor, specially constructed EFW Kerb Upstands were made to enhance the internal light with combination flashings, Smoke Vent windows, wall switches, and remote controls.
Sponsored
Smart fire prevention system installed in prestige student accommodation in  Cardiff University

Smart fire prevention system installed in prestige student accommodation in Cardiff University

Firechief Global

The Fitzalan is a high-end student accommodation building located right in the heart of Cardiff city. As well as a variety of modern bedroom accommodation ranging from studios to two-bedroom apartments, the communal spaces include a cinema room, game rooms, luxury ‘snugs’ , an on-site gym, a common room and a communal kitchen.The present accommodation was created back in 2017 when a series of one- and two-storey vertical extensions were added to the existing buildings to increase the size of the accommodation to a total of 357 beds.The Fitzalan’s present owners McLaren Property, are in the process of selling the building. The new owner has requested a full upgrade of all electrical installations and fire safety measures prior to completion. As all accommodation has a fully kitted out kitchen with a combi microwave and hob, fire prevention in these areas was considered of particular importance. The buildings new owners specified that the Firechief Kitchen Stove Guard be fitted as standard in all 313 apartments and studios in addition to the existing fire suppression system.
Sponsored
IFA2 Converter Station - GRP Products

IFA2 Converter Station - GRP Products

Dura Composites Ltd

Non-Conductive Fencing, Trench Covers and Access Structures | Case StudyPower and Energy Infrastructure Contractor Morgan Sindall was appointed to design, build and commission the new converter station and chose to work with Dura Composites to provide safe, non- metallic Glass Reinforced Polymer (GRP) utility fencing for the AC/DC Halls, as well as a range of non-conductive access structures, utility trench covers & handrailing across the site.The IFA2 project aims to connect the electricity systems of Great Britain and France using high voltage subsea cables and will be capable of exporting or importing 1000MW of power between the UK and France, enough to power up to 1 million homes. In this project, the client specification mandated the use of non-conductive and non-metallic materials which could be used to construct removable fencing, permanent fencing and sliding gates to enable access to specific authorised personnel, whilst preventing others from accessing high-risk areas.
Sponsored
GEC Anderson Kitchens For Danish Church Of St Katherine

GEC Anderson Kitchens For Danish Church Of St Katherine

Anderson, GEC Ltd

The Danish Church in London has been in existence, since 1696. Since 1952, it has occupied St Katherine’s, a neo gothic Church sited in the calm and secluded setting of London’s Regent’s Park, forming part of the Crown Estate.A recent refurbishment of the Church has been undertaken, overseen by Architects CF Møller and carried out by, main contractor, Coniston. The work included three new kitchens, communal spaces, and vicarage. GEC Anderson were employed to supply and install the three kitchens occupying two levels of the historic building. Liaising closely with the Architect, GEC Anderson were able to produce and install the required kitchen surfaces and fabrications as well as the required package of commercial kitchen appliances. Managing director of GEC Anderson, Martin Tye, commented “Space was very much a limiting factor in all three of the areas that we were involved with and so, it was a real challenge to be able to accommodate and include all of the necessary elements. Following the careful guidance of the design team, we were able to translate the requirements set out on paper into a tangible result for the client. This also involved meeting with the end user team and understanding the order of priorities.” Certain areas included high ceilings and so some tailored storage options were provided to maximise the useable space. Shelving and cabinets were included to provide the appropriate storage.
Sponsored
EPIC UK

EPIC UK

Radii

The scope of work at 217 Bath Road combined a full-scale structural refurbishment and fit-out of the internal space along with extensive landscaping works around the building.Landlords EPIC UK sought to revitalise the site into four floors of highly desirable Grade A office space — all to be done with a strong emphasis on sustainability.With a view to make the most of the available floorspace, a partially-filled atrium design was submitted by architects Stiff + Trevellion.Radii AG’s experience in providing structural glazed atrium solutions saw them work closely with the architects and main contractors Overbury and contribute their considerable expertise to bring the design to life.The initial atrium design at Bath Road was to be comprised of system partitions that were installed ‘slab to slab’, with spandrel panels then covering the glazing.After careful consideration, Radii AG proposed an alternative solution that would see all glazed elements and spandrel panels installed in one continuous plane.This evolution of the design would ‘value engineer’ the build and improve overall aesthetics by ensuring clean lines throughout.Furthermore, Radii AG were able to work closely with our western contracting office, who were tasked with supplying the abutted glass partitioning systems.The installation of free issue spandrel panels ensured a seamless aesthetic transition to the adjoining glazed partitioning from the industrial-style partition system.
Sponsored
Liverpool’s Famous Tobacco Warehouse Transformed into Luxury Waterfront Apartments

Liverpool’s Famous Tobacco Warehouse Transformed into Luxury Waterfront Apartments

Thomas Dudley

Cuplas are Liverpool’s first choice for providing wholesale plumbing supplies to the trade and public. They contacted us to assist with a project they became involved with at the Tobacco Warehouse, Liverpool’s luxury waterfront apartments.The Grade II Tobacco Warehouse is the largest brick build building in the world. Formally the storage facility for all of the tobacco coming in to the UK from the new world. It has now been converted into a residential complex with ‘New York’ style apartments of varying sizes. To compliment the modern design, the apartments needed to be fitted out with quality bathroom products.Round table discussions took place with key experts within the business and directly with Cuplas to fully understand the challenge and help them achieve their goals. Following these discussions and numerous visits to site to visualise the setting, our design, specification and product teams worked together to present various solutions to satisfy their demands. After looking at all of the options available, the customer chose our premium WRAS approved concealed cistern range along with our Reef dual flush pneumatic push plate.Testimonial“The two main driving factors on deciding to use TYDE for this job was value for money and reputation. The apartments are top end properties, we wanted to use a manufacturer with a solid reputation for quality. The products were easy to install, they function well and have been faultless so far.”
Sponsored
Copr Bay - Swansea Arena

Copr Bay - Swansea Arena

Towelrads

In August 2020, we initiated a meeting with the designated mechanical sub-contractor for this prestigious project, the Copr Bay – Swansea Arena. Shortly thereafter, we were provided with the initial product schedule. The schedule outlined the specific requirements for MHS Monoplan Standard Type EK and Secureguard Style B LST radiators, enabling us to conduct a comprehensive quotation pricing exercise.We arranged a meeting and facilitated the presentation of Flat Fronted Panel and LST Ultra radiator samples. The objective was to determine the suitability of our products for the project.Following the submission of samples, we received confirmation that they were approved by both the client, City & County of Swansea Council, and the main contractor. In response to subsequent site alterations and resulting radiator sizing amendments we made the necessary accommodations to ensure accurate quotations and a seamless collaboration.In December 2020, after resolving the sizing amendments, we received a purchase order for the supply of radiators for the Copr Bay – Swansea Arena project.From May to November 2021, the installation of our Flat Fronted Panel and LST Ultra radiators at the Copr Bay – Swansea Arena was successfully completed. This period involved meticulous planning and execution to ensure a successful integration of our products. Throughout the project timeline, Towelrads and CMB Engineering Services (West) demonstrated effective collaboration and adaptability, resulting in the successful completion of the installation phase at the prestigious Copr Bay – Swansea Arena from May to November 2021.
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
Crittall spans the Globe

Crittall spans the Globe

Crittall Windows Ltd

A major live arts venue, that in its heyday hosted The Beatles, Buddy Holly, the Rolling Stones and Cilla Black, has been restored to its art deco glory with the help of Crittall windows.The Globe, Stockton, is the biggest live entertainment venue between Leeds and Newcastle and will re-open shortly with a capacity of 1,650 people seated or up to 3,000 standing.The re-birth is eagerly awaited as the theatre has been closed for the past 45 years. A major refurbishment and restoration programme has been led in recent times by Stockton-on-Tees Council, supported by grant aid from the National Lottery Heritage Fund.The Grade II listed building dates from 1935 and was designed by architect Percy L Browne. Crittall windows were installed originally and these have been replicated in the restoration by the use of bespoke Corporate W20 profiles finished in Turkish Blue. Crittall cold form doors were also supplied.Anthony Dillon, managing director of main contractor Willmott Dixon said: “It has been fantastic working on the restoration of the Globe Theatre, breathing new life into a really iconic building for the community. We look forward to seeing it become a cultural hub once again for future generations to enjoy.”The theatre will play a central role of the Tees Valley Combined Authority’s ambition for the sub-region to be named City of Culture 2025.
Sponsored
National Maritime Museum, London

National Maritime Museum, London

FOAMGLAS®

FOAMGLAS® T4+ (Slab)Design Architects: C.F. Moller & Purcell Miller TrittonMain Contractor: Bovis Lend LeaseApplication: Compact Roof - Gallery Roof & Restaurant Terrace FOAMGLAS® S3 (Slab )Finish: PaversFOAMGLAS® insulation was specified for the new gallery terrace and restaurant of the National Maritime Museum. With limited height available upon the roof there was no space for a concrete screed to falls. Therefore, architects Purcell Miller Tritton needed a factory machined tapered insulation with a slope to shed water. In addition, the limestone terrace paving must withstand the loads imposed by vehicles and so the insulation beneath had to withstand these dynamic loads without any compression.FOAMGLAS® T4+ slab insulation was specified for the project due to these conditions. FOAMGLAS® does not move or deflect under loads, and is available factory machined with a tapered slope. Its thermal performance is reliable and permanent and it is guaranteed for the lifetime of the building. The new roof of the gallery has paved areas, and green planting with hidden drain age and water supplies.The restaurant terrace gives wonderful view of the World Heritage Site, Greenwich Park and the Royal Observatory. The gallery has some fascinating objects; including jewels which belonged to Sir Francis Drake, journals written by Captain Cook’s during his long voyages, and personal items that survived the sinking of HMS Titanic.

Showing 505-540 of 648

Feedback