NBS Source
I'm a manufacturer
Compare variants

SPEEDLINE Shaft Encasement Systems Utilising British Gypsum Board

Verified by manufacturer 4 months ago

SE60-B-56

Metsec (voestalpine Metsec) Variant:
Third party certifications:
  • BSI Kitemark

    BSI Kitemark

    Certificate type

  • EPD

    EPD

    Certificate type

  • ISO 9001 Quality Management

    Certificate type

  • UK Conformity Assessed (UKCA)

    UK Conformity Assessed (UKCA)

    Certificate type

A high-performance fire protection system to enclose lift shafts and service rises.

Jump to:
+44 (0) 121 601 6000 Website

Application

Sectors:

  • High rise residential.
  • Education.
  • Healthcare.
  • Leisure.
  • Student accommodation.
  • Offices.

Description

A high-performance fire protection system to enclose lift shafts and service rises.

The Speedline Shaft Encasement System allows installation to take place from the landing side only.

This system is non-load-bearing and designed to fit between structural floors.


Features and benefits:

  • Fast and simple to erect.
  • Cost effective.
  • Good impact resistance and stiffness.
  • Lighter in weight than masonry.
  • High level of fire protection.
  • Allows any thickness of coreboard to be used.

Structural performance:

  • Strength grade to BS 5234-2:1992 Annexes A-F.

Fire performance:

  • Fire resistance to BS 476:1987:Part 22.

Acoustic performance:

  • Calculated weighted sound reduction index (Rw) to BS EN ISO 10140-2: 2010.

Installing framing for partitions:

  • Partition height (maximum) calculated based on a limiting deflection of L/240 at 200 Pascals.

General information

Length

Bespoke

Height

Bespoke

Uniclass

Ss_25_10_30_35 Gypsum board partition systemsPrimary

CAWS

K10/125 Metal stud partition system

K10/30 Metal stud

Product range

Drylining / Shaftwall

Specification data - Gypsum board partition systems

Framing

Speedline 'I' Stud, 60 mm.

Linings

-

Inner layers

British Gypsum Gyproc CoreBoard, 19 mm fixed with ASB62B brackets.

Guidance for specification option:

Secured in between Speedline 'I' stud with shaft encasement brackets (ASB62B).

Outer layers

British Gypsum Gyproc FireLine, 15 mm.

Fasteners

Speedline Drywall Screws.

Joint treatment

Speedline Drywall Fibreglass Tape.

Speedline Ready Mix Joint Compound.

Speedline Putty Pads.

Speedline Corner Bead Tape.

System accessories

Speedline Fire Rated Acoustic Sealant.

Speedline PB24 Partition Brace.

Speedline FS24 Flat Bracing Strip.

Speedline Service Support Plate.

Speedline Putty Pads.

Fire resistance

To BS 476-22:1987, 60/ 60 minutes from shaft side (Integrity/ Insulation).

Partition height

Guidance for specification option:

Insert requirement, maximum 3800 mm.

Maximum based on 600 mm centres and calculated based on a limiting deflection of L/240 at 200 Pascals.

Manufacturer guidance

Maximum.

Calculated weighted sound reduction index (Rw)

39 Rw dB.

Guidance for specification option:

Based on the optimum system thickness.

Centres

600 mm.

Guidance for specification option:

Standard.

Note that if non-standard centres are required, this may affect the sound reduction index (Rw) - consult manufacturer for details.

StrengthGrade

Heavy duty.

Head/ Floor channel

Speedline Standard Track.

Guidance for specification option:

Used for partition heights under 4 m.

Available in 50, 52, 62 or 72 mm wide.

25 mm flange.

Speedline 32 mm Leg Track.

Guidance for specification option:

Used for partition heights under 4 m.

Available in 52, 62, 72, 94 or 148 mm wide.

32 mm flange.

Speedline Deep Track.

Guidance for specification option:

Used for partition heights between 4m and 8m.

Can be used as a head track where a deflection head of up to 30 mm is needed.

Available in 52, 62, 72, 94 or 148 mm wide.

50 mm flange.

Speedline Extra Deep Track.

Guidance for specification option:

Used for partition heights between 8m and 10.2 m.

Can be used as a head track where a deflection head of up to 45mm is needed.

Available in 72, 94 or 148 mm wide.

70 mm flange.

Sustainability data

Third party certifications

Third party certifications

BSI Kitemark

BSI Kitemark

BIM Level 2 Kitemark - For Design and Construction Phase

BSI Kitemark

BSI Kitemark

BSI Kitemark™ for BIM Objects

EPD

EPD

Environmental Product Declaration EPD - Drylining

ISO 9001 Quality Management

ISO 9001 Quality Management

ISO 9001:2015 Quality Management System

UK Conformity Assessed (UKCA)

UK Conformity Assessed (UKCA)

UKCA Declarations of Performance - Drylining

Literature

Product Data Sheet - Drylining

Product Data Sheet - Drylining

SPEEDLINE Partitioning Systems

SPEEDLINE Partitioning Systems

SPEEDLINE Fixings and Finishing Solutions

SPEEDLINE Fixings and Finishing Solutions

Similar products from Metsec (voestalpine Metsec)

SPEEDLINE Shaft Encasement Systems Utilising Knauf Board

SPEEDLINE Shaft Encasement Systems Utilising Knauf Board

SPEEDLINE Shaft Encasement Systems Utilising Siniat Board

SPEEDLINE Shaft Encasement Systems Utilising Siniat Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising British Gypsum Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising British Gypsum Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising Knauf Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising Knauf Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising Siniat Board

SPEEDLINE Single Frame Acoustic Stud Partition Systems Utilising Siniat Board

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum Duraline

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum Duraline

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum FireLine

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum FireLine

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum SoundBloc

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum SoundBloc

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum WallBoard

SPEEDLINE Single Frame Partition Systems Utilising British Gypsum WallBoard

SPEEDLINE Single Frame Partition Systems Utilising Knauf Fire Panel

SPEEDLINE Single Frame Partition Systems Utilising Knauf Fire Panel