RiserSafe is a bespoke modular flooring system for riser shafts in multi-storey buildings, which is easily installed on site by the construction supply chain.

Jump to:
+44 (0)1707 324523 www.ambar-kelly.com

Application

RiserSafe® can be used for all different types of structure in-situ concrete, steel frame composite deck, precast, twinwall and lattice slab, post tensioned slab, post fit for refurbs.

Description

RiserSafe is a bespoke modular flooring system for riser shafts in multi-storey buildings, which is easily installed on site by the construction supply chain. Each unit is specifically manufactured to accommodate vertical routing of Mechanical, electrical, and plumbing (MEP) services that feed the building. These shafts start as a series of holes in each floor, sitting one above another on every storey. Once enclosed by walls, these holes are now connected to form a shaft. 


RiserSafe is a simple concept; a steel box with a floor plate atop, permanently forming and covering the hole, preventing fall from height and fire spread during construction and throughout the building’s life. RiserSafe acts as a casting or fixing point for passive fire protection like drylined or block work walls, which, together with fire protection compounds, provide horizontal fire compartmentation. MEP services require maintenance in any building, so technicians must be able to work safely within the riser shaft (zone). RiserSafe has a safe working load (SWL) of 2.5 kN/m2 (250 kg/m2); more than sufficient to keep any person safe when working in these vital arteries of a building.


The unit design is standard, the only detail that changes are the length, width and depth of the manufactured unit to meet the design intent of the service riser openings within the floor slab of each project.


The RiserSafe® unit is manufactured using Zintec coated steel frame, with 6–8 mm durbar floor plates shot blasted and red oxide primed (26–30 μm thick). The joist hangers are also made of Zintec coated steel. The back section of the joist hangers has teeth which locate into the inside wall 'C' section.


Corrosion protection:

The RiserSafe® has been designed for internal use but during its installation maybe exposed to weather. Therefore, the perimeter frame is manufactured from 3 mm steel with a Zintec coating which in brief, is an electro galvanized coating of pure zinc layer on both sides.


Features and benefits:


  • Permanent formwork for concrete.
  • Removes the need for hand rails.
  • Stops the spread of smoke and flame between floors.
  • Load bearing up to 2.5 kN/m² (SWL 250 kg/m²) as standard.
  • Storage area for construction materials.
  • Formwork for horizontal fire protection materials.
  • Fixing points for separating walls.
  • Fixing points for fire walls.
  • Part of the fixing points for heavy M&E services.
  • Casting and weathering properties for the top of service riser shafts.
  • Drives M&E design to early completion.

General information

Color

Red

Steel, shot blasted and primed with red oxide primer (26–30 μm thick).

Grey

Finish

Shot blasted

Primed

Electro-galvanized

Material

Steel

Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26–30 μm thick).

Shape

Rectangle

Triangle

Other

Size

As drawing

Insert reference, units over 1000 x 1000 mm are supplied with toothed removable joist hangers and supporting relocation beam/s.

Overall, 200 mm² minimum, 48 m² maximum.


WarrantyDescription

Guarantee for the design life of a building. Manufactured to provide a safe working load (SWL) of 2.5 kN/m² (250 kg/m²).

-

Uniclass 2015

Pr_25_71_29_52 Modular riser flooring unitsPrimary
Ss_25_60_05_35 Handrail systems
Pr_25_71_51_89 Steel profiled sheet

CAWS

E60/210 Floor

E20/225 Permanent formwork for suspended floors

E20/230 Modular riser flooring units

E20/145 Permanent formwork

E40/440 Load transfer systems

L37/150 Handrail systems

E20/70 Formwork

Specification data - Modular riser flooring units Enhanced data

Certification

CE welding certificates and FORS gold standard.

Plate

Steel plate shot-blasted, red oxide-coated.

6—8 mm thick durbar floor plates, shot blasted and red oxide primed (26—30 μm thick).

Frame

Concrete frame with blank or pre-cut durbar plates.

Size

As drawings.

Insert reference, units over 1000 x 1000 mm are supplied with toothed removable joist hangers and supporting relocation beam/s.

Additional supports

-

Size

60 x 100 x 5 mm.

Relocation beams.

Material and finish

Zintec coated steel and red oxide primer.

Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26—30 μm thick).

Fixings

Floor plates fixed down with 5/16 hex head 5.5 x 38 mm tek screws.

Prepared openings

As drawings.

Insert requirements.

Fire-stopping

Over two hours in combination with fire compound.

Fire resistance

To EN 13501-1, Class A1fl-s1-d0.

Up to 1000°C for 90 minutes.

Integral accessories

Not required.

Soaker plate.

Product Reference

RiserSafe® - CONCRETE FRAME WITH BLANK OR PRE-CUT DURBAR PLATES

Environmental information

Country of material origin

United Kingdom

Country of product manufacture

United Kingdom

Embodied carbon

Gradle-to-Grave assessed.

Carbon neutral

Recyclability

98%

Literature

AMBAR KELLY TECHNICAL DATA SHEET

AMBAR KELLY TECHNICAL DATA SHEET

RiserSafe Modular Riser Steel Flooring - Installation Guide - Concrete Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Concrete Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Post Fixed- Flat Packed

RiserSafe Modular Riser Steel Flooring - Installation Guide - Post Fixed- Flat Packed

RiserSafe® Modular Riser Steel Flooring - Installation Guide - Steel Frame

RiserSafe® Modular Riser Steel Flooring - Installation Guide - Steel Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Retro Fit Logisitics plan

RiserSafe Modular Riser Steel Flooring - Installation Guide - Retro Fit Logisitics plan

AMBAR KELLY MODULAR RISER FLOOR BROCHURE

AMBAR KELLY MODULAR RISER FLOOR BROCHURE

RiserSafe Modular Riser Steel Flooring - Installation Guide - Steel Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Steel Frame

SCCS CE Certificate of FPC 19.08.20 to 28.02.22

SCCS CE Certificate of FPC 19.08.20 to 28.02.22

SCCS CE Welding Certificate 19.08.20 to 28.08.22

SCCS CE Welding Certificate 19.08.20 to 28.08.22

Technical briefing note - Prefabricated riser modules

Technical briefing note - Prefabricated riser modules

Technical briefing note - Riser Statutory Regulations

Technical briefing note - Riser Statutory Regulations

Combined RiserSafe & Smoke shaft

Combined RiserSafe & Smoke shaft

British Gypsum fire wall detail

British Gypsum fire wall detail

Case studies

245 HAMMERSMITH ROAD

245 HAMMERSMITH ROAD

3 SNOWHILL QUEENSWAY, BIRMINGHAM

3 SNOWHILL QUEENSWAY, BIRMINGHAM

70 ST MARY AXE (Can of Ham)

70 ST MARY AXE (Can of Ham)

ABERDEEN EXHIBITION & CONFERENCE CENTRE

ABERDEEN EXHIBITION & CONFERENCE CENTRE

ONE TRITON SQUARE

ONE TRITON SQUARE

PRINCIPAL PLACE

PRINCIPAL PLACE

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

THE SCALPEL

THE SCALPEL

Third party certifications

QA Certificate

QA Certificate

QA Certificate

QA Certificate

Additional certifications:

  • Fleet Operator Recognition Scheme (FORS): Gold Standard - 005381