NBS Source
I'm a manufacturer

RiserSafe® - Building Riser - Concrete Frame

Verified by manufacturer 1 month ago

Ambar Kelly Ltd

RiserSafe is a bespoke modular flooring system for riser shafts in multi-storey buildings, which is easily installed on site by the construction supply chain.

Jump to:
BOS
+44 (0)1707 324523 Website

Application

RiserSafe® can be used for all different types of structure in-situ concrete, steel frame composite deck, precast, twinwall and lattice slab, post tensioned slab, post fit for refurbs.

Description

RiserSafe is a bespoke modular flooring system for riser shafts in multi-storey buildings, which is easily installed on site by the construction supply chain. Each unit is specifically manufactured to accommodate vertical routing of Mechanical, electrical, and plumbing (MEP) services that feed the building. These shafts start as a series of holes in each floor, sitting one above another on every storey. Once enclosed by walls, these holes are now connected to form a shaft. 


RiserSafe is a simple concept; a steel box with a floor plate atop, permanently forming and covering the hole, preventing fall from height and fire spread during construction and throughout the building’s life. RiserSafe acts as a casting or fixing point for passive fire protection like drylined or block work walls, which, together with fire protection compounds, provide horizontal fire compartmentation. MEP services require maintenance in any building, so technicians must be able to work safely within the riser shaft (zone). RiserSafe has a safe working load (SWL) of 2.5 kN/m2 (250 kg/m2); more than sufficient to keep any person safe when working in these vital arteries of a building.


The unit design is standard, the only detail that changes are the length, width and depth of the manufactured unit to meet the design intent of the service riser openings within the floor slab of each project.


The RiserSafe® unit is manufactured using Zintec coated steel frame, with 6–8 mm durbar floor plates shot blasted and red oxide primed (26–30 μm thick). The joist hangers are also made of Zintec coated steel. The back section of the joist hangers has teeth which locate into the inside wall 'C' section.


Corrosion protection:

The RiserSafe® has been designed for internal use but during its installation maybe exposed to weather. Therefore, the perimeter frame is manufactured from 3 mm steel with a Zintec coating which in brief, is an electro galvanized coating of pure zinc layer on both sides.


Features and benefits:

  • Permanent formwork for concrete.
  • Removes the need for hand rails.
  • Stops the spread of smoke and flame between floors.
  • Load bearing up to 2.5 kN/m² (SWL 250 kg/m²) as standard.
  • Storage area for construction materials.
  • Formwork for horizontal fire protection materials.
  • Fixing points for separating walls.
  • Fixing points for fire walls.
  • Part of the fixing points for heavy M&E services.
  • Casting and weathering properties for the top of service riser shafts.
  • Drives M&E design to early completion.

General information

Color

Red

Guidance for specification option:

Steel, shot blasted and primed with red oxide primer (26–30 μm thick).

Grey

Finish

Shot blasted

Primed

Galvanized

Guidance for specification option:

Electro-galvanized.

Material

Steel

Guidance for specification option:

Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26–30 μm thick).

Shape

Rectangle

Triangle

Other

Length

Bespoke

Width

Bespoke

Height

Bespoke

Warranty description

Lifetime

Manufacturer guidance

Guarantee for the design life of a building. Manufactured to provide a safe working load (SWL) of 2.5 kN/m² (250 kg/m²).

Uniclass

Pr_25_71_29_52 Modular riser flooring unitsPrimary
Ss_25_60_05_35 Handrail systems
Pr_25_71_51_89 Steel profiled sheet

CAWS

E60/210 Floor

E20/225 Permanent formwork for suspended floors

E20/230 Modular riser flooring units

E20/145 Permanent formwork

E40/440 Load transfer systems

L37/150 Handrail systems

E20/70 Formwork

Product range

RiserSafe family of products

Specification data - Modular riser flooring units

Certification

CE welding certificates and FORS gold standard.

Plate

Steel plate shot-blasted, red oxide-coated.

Guidance for specification option:

6—8 mm thick durbar floor plates, shot blasted and red oxide primed (26—30 μm thick).

Frame

Concrete frame with blank or pre-cut durbar plates.

Size

As drawings.

Guidance for specification option:

Insert reference, units over 1000 x 1000 mm are supplied with toothed removable joist hangers and supporting relocation beam/s.

Additional supports

-

Size

60 x 100 x 5 mm.

Guidance for specification option:

Relocation beams.

Material and finish

Zintec coated steel and red oxide primer.

Guidance for specification option:

Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26—30 μm thick).

Fixings

Floor plates fixed down with 5/16 hex head 5.5 x 38 mm tek screws.

Prepared openings

As drawings.

Guidance for specification option:

Insert requirements.

Fire-stopping

Over two hours in combination with fire compound.

Fire resistance

Non-combustible EN 13501-1 Class A1.

Guidance for specification option:

Up to 1000°C for 90 minutes.

Integral accessories

Not required.

Soaker plate.

Sustainability data

Contains Red List materials

-

Manufacturer guidance

Primary raw material is steel, at present the best option for stability, strength and non-combustibility required by regulation, guidelines, and codes of practice. However, we are a carbon neutral company through off setting and have an audit annually to confirm our credibility.

Country of material origin

United Kingdom

Country of product manufacture

United Kingdom

Material

Steel

Guidance for specification option:

Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26–30 μm thick).

Embodied carbon

A1-A3 (production stage) as defined in BS EN 15804

2.84 kg CO₂ eq/kg

Self declared

Manufacturer guidance

Gradle-to-Grave assessed.

Recyclability

98%

BIM objects

BOS

NBS BIM Object Standard

This BIM object has been authored to meet the requirements of the NBS BIM Object Standard.

Find out more about the NBS BIM Object Standard.

Platform Compatible Version
IFC
-

1

Revit
-

1

Literature

RiserSafe Modular Riser Steel Flooring - Installation Guide - Concrete Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Concrete Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Post Fixed- Flat Packed

RiserSafe Modular Riser Steel Flooring - Installation Guide - Post Fixed- Flat Packed

RiserSafe Modular Riser Steel Flooring - Installation Guide - Retro Fit Logisitics plan

RiserSafe Modular Riser Steel Flooring - Installation Guide - Retro Fit Logisitics plan

RiserSafe Modular Riser Steel Flooring - Installation Guide - Steel Frame

RiserSafe Modular Riser Steel Flooring - Installation Guide - Steel Frame

Technical briefing note - Prefabricated riser modules

Technical briefing note - Prefabricated riser modules

Technical briefing note - Riser Statutory Regulations

Technical briefing note - Riser Statutory Regulations

Combined RiserSafe & Smoke shaft

Combined RiserSafe & Smoke shaft

British Gypsum fire wall detail

British Gypsum fire wall detail

Case studies

245 HAMMERSMITH ROAD

245 HAMMERSMITH ROAD

3 SNOWHILL QUEENSWAY, BIRMINGHAM

3 SNOWHILL QUEENSWAY, BIRMINGHAM

70 ST MARY AXE (Can of Ham)

70 ST MARY AXE (Can of Ham)

ABERDEEN EXHIBITION & CONFERENCE CENTRE

ABERDEEN EXHIBITION & CONFERENCE CENTRE

ONE TRITON SQUARE

ONE TRITON SQUARE

PRINCIPAL PLACE

PRINCIPAL PLACE

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

SKYGARDENS, NINE ELMS

THE SCALPEL

THE SCALPEL

Similar products from Ambar Kelly Ltd

RiserSafe® - Building Riser - Post Tension Concrete Frame - Riser Flooring

RiserSafe® - Building Riser - Post Tension Concrete Frame - Riser Flooring

RiserSafe® - Building Riser - Pre-cast Concrete Planks

RiserSafe® - Building Riser - Pre-cast Concrete Planks

RiserSafe® - Building Riser - Retrofit Flat Pack

RiserSafe® - Building Riser - Retrofit Flat Pack

RiserSafe® - Building Riser - Steel Frame

RiserSafe® - Building Riser - Steel Frame

RiserSafe® Clamshell

RiserSafe® Clamshell

RiserSafe® Solo Plus - Modular Riser Flooring

RiserSafe® Solo Plus - Modular Riser Flooring