BBA Agrément Certificate
Certificate type
QA Certificate
Certificate type
A high performance polyurethane coating used as an embedment coat for the Decothane waterproofing systems.
Features:
Areas of use:
Features | Totally seamless, single pack liquid applied membrane Cold applied – eliminating the risk of fire during installation High solids, VOC compliant to 2004/42/CE BBA certified system Highest fire ratings once installed (BROOF(t4)) Fast curing, develops early rain resistance Excellent adhesion to most conventional substrates Easy and quick application – Deco Applicator available Minimal disruption and low maintenance Elastic properties – tolerant of thermal movement Vapour permeable Flexible, impact resistant membrane Can be applied all year round above 2°C Approved to ETAg 005 (Part 6) Single point guarantee available if installed by a Liquid Plastics Quality Assured Contractor |
Uniclass 2015 | |
CAWS | J31/120 Warm deck roof coating J31/30 Laying vapour control layer J31/5 Cold deck roof coating J31/110 Cold deck roof coating |
Product Reference | Decothane Base Coat |
Primer | Dependent on substrate requirements, contact manufacturer for further information. |
Coating application | - |
1st coat | Minimum 1 litre/m²Roller applied on flat surfaces – brush applied for detail work. |
2nd coat | 0.75 litre/ m² - roller applied on flat surfaces – brush applied for detail workFor Omega 15 system. 1 litre/ m² - roller applied on flat surfaces – brush applied for detail workFor Gamma 20 system. 0.75 litre/ m² - roller applied on flat surfaces – brush applied for detail workFor Omega 15 system. |
3rd coat | Not required1 litre/ m² - roller applied on flat surfaces – brush applied for detail workFor Delta 25 system only. |
Reinforcement | Reemat Premium GFM embedded in base coat |
Minimum dry film thickness – full system | 1500 micrometresFor Omega 15 system. 1700 micrometresFor Gamma 20 system. 2300 micrometresFor Delta 25 system. |
Standard product features | Drying time: 4–6 hours (20°C), 6–8 hours (10°C), 12–16 hours (2°C). Fire Resistance:
|
Product Options | Colour: Red. Primer: Consult Liquid Plastics for use of primer appropriate to substrate. |
© 2020 NBS Enterprises Ltd. All rights reserved.
1 / 1