NBS Source
I'm a manufacturer
RYNO

RYNO

FINISH STRONG | Complete, integrated systems enhancing life on the skyline.

+44 (0)203 967 3500 Website

Sort by:

Showing 73-74 of 74

Sponsored
Viridian Apartments

Viridian Apartments

RYNO

At Viridian Apartments, a residential development in South West London, RYNO was selected to supply our ADB-60 Aluminium Deck Board in RAL 7039 as part of a large-scale fire remediation project. Working in partnership with Urang Group, City Restoration Ltd, and the installer Decking UK, the project replaced non-compliant timber decking across several levels of balconies with RYNO’s fully non-combustible aluminium decking system - bringing the development up to current fire safety standards and restoring safe outdoor access for residents.The ChallengeOver time, the building’s original timber decking had deteriorated - exposed to the elements and weakened by years of insufficient maintenance. Many residents were unable to use their balconies safely, and with new fire regulations in place, full replacement was essential.The challenge lay in delivering a compliant, durable, and fast-turnaround solution across multiple balcony levels, each with varying heights and substrate levels, including tricky upstands. The project team also faced tight deadlines, requiring materials to be delivered and installed within a short timeframe to keep remediation works on schedule.The SolutionRYNO supplied the TerraSmart® Aluminium Decking system, utilising our popular ADB-60 board. Fire-rated, fully compliant, and engineered for fast installation in complex retrofit environments.Key features included:Euroclass A-rated non-combustible aluminium decking, ensuring complete compliance with current fire safety regulations.Flexible height adjustment, wide range of joist and support options allowed for quick installation across balconies with varying height build-ups required. Rapid turnaround, most materials available in 2 weeks or less, enabling the main contractor to meet strict project deadlines.Standard range of five board lengths, perfectly suited to the differing balcony dimensions across the development.RAL 7039 powder coated finish (Qualicoat Class 2), providing a clean, contemporary aesthetic that complements the building’s façade - whilst also not compromising on durability, scratch resistance and slip resistance.Installation began with the ground floor terraces—where timber deterioration was most severe and will continue to upper levels as part of the ongoing remediation programme.Collaboration with City Restoration, Urang Group & Decking UKRYNO worked closely with City Restoration Ltd (Main Contractor) and Urang Group (Property Management) to support fast delivery and ensure smooth installation and logistics.Arsen Berbati and his team at Decking UK carried out the installation, praising the ADB-60 system’s wide board profile, which allows for faster fitting and fewer fixings, as well as its ease of cutting on site. Feedback from residents has been overwhelmingly positive - many have begun enjoying their balconies again for the first time in years, confident in the safety and longevity of their new aluminium decking.The Finishing TouchAt RYNO, we like to build relationships as strong as our systems. During the site visit, Arsen from Decking UK mentioned how much he enjoyed the RYNO Hot Sauce he received - a small but fiery token of partnership that’s become a bit of a legend among our installers.From fire compliance to fast delivery (and a touch of heat), the Viridian Apartments project is a perfect example of how RYNO delivers more than just systems; we deliver confidence, collaboration, and results that last.
Sponsored
2 Aldermanbury Square

2 Aldermanbury Square

RYNO

OverviewAs part of the redevelopment at 2 Aldermanbury Square in the heart of the City of London, RYNO was selected to supply and support the installation of our TerraSmart® Rail System across the podium and terrace areas. Working alongside Maylim and main contractor Lendlease, the system provided a robust, fire-rated foundation for the project’s premium outdoor spaces.The ChallengeLocated in the Barbican district, the scheme required a paving support system that could deliver long-term durability, rapid water drainage, and complete compliance with fire safety standards. With terraces and podium areas designed for both aesthetic appeal and high foot traffic, the specification needed to combine structural integrity with design flexibility – capable of accommodating mixed paving layouts and maintenance access beneath the surface.The SolutionWorking closely with Maylim, RYNO supplied our TerraSmart® Rail System – a fully non-combustible, Euroclass A1-rated solution designed specifically for terraces, podiums, and balconies.The system was chosen for its ability to:Support a variety of paving formats, including random length, mixed width, stack bond, stretcher bond, and herringbone.Allow rapid water drainage through the paving surface, ideal for podium and terrace environments.Enable maintenance access to services or piping without compromising structural integrity.Offer optional hidden or visual wind uplift fixings, maintaining both function and finish. With a 30-year warranty and 60-year design life when installed as part of a complete RYNO IGNO system, the TerraSmart Rail solution ensured the project met both performance and compliance standards with minimal complexity on site.Collaboration with Maylim & LendleaseAlthough the technical requirements were relatively straightforward, RYNO worked closely with Maylim to ensure smooth specification and delivery. Our team provided product support and guidance to integrate the system seamlessly into the wider construction programme led by Lendlease.The collaboration reinforced RYNO’s reputation for reliability and partnership—helping deliver a clean, durable, and compliant finish for one of London’s prime commercial addresses.Key BenefitsFully Non-Combustible: Euroclass A1-rated system for maximum fire safety compliance.Versatile Design Options: Suitable for multiple paving layouts and configurations.Efficient Drainage: Allows rapid water runoff through the surface.Long-Term Assurance: Backed by a 30-year warranty and 60-year design life.Collaborative Delivery: Close coordination with Maylim ensured efficient installation and on-time delivery.SummaryAt 2 Aldermanbury Square, RYNO’s TerraSmart® Rail System delivered a reliable, non-combustible, and flexible foundation for the project’s podium and terrace spaces. Working in collaboration with Maylim and Lendlease, the installation exemplifies RYNO’s ability to provide high-performance outdoor systems that enhance both form and function in demanding urban environments.

Showing 73-74 of 74