Acoustic Varying Height Timber Fencing

Following fire damage to the existing timber fencing, Procter Contracts were tasked with replacing the damaged timber. Due to the timber fencing being 7.00m high, there was an issue with “working at height”, also working in a residential car park. Our trained operatives were working of a mobile platform to secure the boards as required. With due care to ensure no damage was caused to other vehicles in the car park.

Alpha Park

This project is a construction of a new £20m industrial and warehouse development in Hampshire. Alpha Park at Chandler's Ford is under construction by Readie Con construction. Project type - New Build Location - Hampshire Client - Bericote Main contractor - Readie Construction

B&Q Merthyr

Once again Procter Contracts partner Bam Construction to successfully complete a B&Q store.We took control of the design manufacture and full installation. This is one of a number of projects Procter have completed for the same Bam team, they trust us to deliver a high standard of work and complete on time. Within 6 weeks we installed high security 4.8 fencing, crash barrier with a handrail, steel guardrail, trolley bays and lamp post protectors.

BBC Studios

A straightforward project for us and a good example of how we’re able to manufacture bespoke fencing and matching gates along with more standard products. The main structures had to be exceptionally strong due to the location of Cardiff Bay and resulting high winds. The areas shown have since been used for the sets of Casualty and Holby City. We manufactured and installed 4m high feather-edge visual screening, 7m high acoustic screening, plus seven automated gates and pedestrian turnstiles. “Very pleased with the overall job and especially the acoustic screens.” Site Manager Vinci Construction

Bobby Moore Academy

Procter Contracts helped design and develop a secure solution for this application. Project type - New build Location - East London Client - Bobby Moore Academy Main contractor - Balfour Beatty Service provided - Design/manufacture & install Products used - Twin wire/sliding gate/perforated mesh & timber bin store

Camden Lock Village

Procter helped design and develop these gates with the architect to achieve the required look. To achieve the required look Procter needed to explore different materials to keep within budget and keep the design intent. Project type - New Build. Location - Camden Lock Village. Client - Mace. Services provided - Design, Supply, Install. Products used - Bespoke Gates. Sector - Retail.

Cardiff Data Centre

Following the install of generators and compressors at the Data Centre. There was a requirement for noise control when the generators and compressors were commissioned. The acoustic barrier consisted of universal beam posts at 3.00m centres, absorptive recycled plastic boards, with a fibre glass infill to reduce the noise of the plant contained behind the barrier. A mid rail galvanised box section has been position to provide additional strength to the acoustic panel. Access Gates were also provided as well as Armco barrier to prevent any future damaged to the acoustic panels.

Crystal Palace

Crystal Palace Chairman, Steve Parish had promised fans a raft of improvement’s at Selhurst Park to raise the profile of the club and keeping their status within the Premiership. The entrance gates are a key element of the clubs brand. The club approached Procter Contracts due to our many years’ experience and expertise in creating large ornate, custom designed gates.

Cubric

Procter Contracts were engaged in the manufacture and install of the purpose made balustrade rails to the entrance of the front new building.Install only galvanised screening to the boundary area. Also, to provide a timber refuse area, and ad hoc purpose made cycle store to provide a secure area for cycles.

Exol

Procter Contracts took full responsibility for the project, including design, manufacture, installation, commissioning and, most importantly, CE marking in line with the Machinery Directive to prove that the two powered gates are safe for Exol Lubricants’ head office and distribution centre in the West Midlands. As part of the same contract, matching laser-cut fence panels were also installed. “We engaged Procter on a complex new build factory project in Birmingham. Our clients Exol Lubricants had requested a pair of bespoke automated sliding gates and laser cut panelling package to compliment the new facade of the site.”

Four Ashes

This project is a new build production facility for Gestamp an international group that manufactures parts for Jaguar, Land Rover, Toyota, BMW, Honda and many others. Project type – New Build Production Facility Location – Gestamp, Wolverhampton Client – Bericote Main contractor – Readie Construction Value & Duration – £37m - 42 Weeks

Four Oaks School

For this primary school we designed, manufactured and installed one of our Pro-Glide cantilevered sliding gates, a rising-arm barrier, plus installed matching Pro-Mesh security fencing to the complete perimeter of the grounds. As with all our automatic gates, this Pro-Glide option was fully CE marked In-line with current European Directives, and thus demonstrating the highest standards of safety in operation. The school’s logo was straightforward for us to add to the gate, as was the colour matching of the school’s green for both the gate and fencing.

Haverfordwest - Welsh Medium School

“Procter Contracts were involved in the £28million scheme in West Wales. Their approach from day one was collaborative and helpful and from tender through to completion and snagging, they provided us with an attentive and professional service which sets them apart from their peers. Operatives on site were always willing to help and were self-regulating when it came to snagging works and rectifying any minor defects."

Highbury Grove School

For this new school build we manufactured and installed 3.5m high bespoke custom made railings and matching automatic swing gates, weldmesh fencing, plus high quality planed timber close board fencing which comes with a 25 year guarantee. The project very much demonstrates our ability to deliver any combination of fence and gate types to meet both operational and aesthetic requirements. Clients are very pleased with the overall job and impressed with the school emblem on the gates, together with gates' efficiency allowing for different modes of operation in and outside of school hours.

Highbury Square

This highly prestigious project saw us take control of the design of all the railings, gates and bespoke metalwork we then went on to manufacture and install. This was a very large contract that carried out for over an 18 month period. We were very proud to be involved in the redevelopment of the old Arsenal Stadium, which very much allowed us to demonstrate our design and manufacturing skills across a wide range of applications.

HMRC - New Bailey

Procter’s were specified to design, supply & install automated gates and ‘SBD’ fencing to the front of HMRC offices in the centre of Manchester. Bowmer & Kirkland were asked to create something out of the ordinary to the head offices of HMRC. We were asked to provide fencing & gates clad with Aluminium along side their landscaping architects so they could carry out planting in front of our fencing. Designing the bases so planting could take place whilst avoiding many services as well as underground parking were some of the obstacles faced along with city centre working.

Iron Mountain

We manufactured and installed a cantilevered sliding gate, matching pedestrian gate and palisade fencing, plus 358 security mesh to the remaining site perimeter for this leading data storage company. Very pleased with all aspects of the job and in particular the speed of installation. The sliding gate was automated via keypad, remote control and intercom with an override from the reception area, and was of course installed in strict accordance to current European Machine Directives and fully CE marked.

Kensington Palace

Architectural steelwork, forged to match existing 18th century gates. Detailing and design to be in sympathy with the original Crowther gates. Decorative components were to reflect the history and heritage of all parts of the UK, and utilised lions, unicorns, daffodils, thistles, roses as well as myriad of leaves and flowers. The result is a seamless transition between modern and ancient, with no way to identify what was produced by Procter’s and our partner Paul Dennis in the 20th century and what was produced by equally skilled craftsmen over 250 years earlier.

Lakefield School

Procter were employed by TRJ to supply and install various types of fencing and gates to Lakefield School site in Llanelli. The site required 2.4m high Secured By Design (SBD) fencing and 1.2m high above a new built brick wall on dog leg posts to the perimeter.

Leons Coaches

This project demonstrates our ability to deliver a complete projects which involves automatic gates and security fencing. We designed, manufactured and installed a double leaf cantilevered sliding gate of 12m wide x 2.4m high with laser-cut customer logo, plus matching perimeter fencing. They were thrilled with the laser-cut logo and that we managed to match the colour exactly to their brand. Also impressed with the level of security achieved.

Manor House Hospital

This project perfectly demonstrates our ability to deliver complete projects comprising fencing of any type, automatic gates, plus street furniture and bespoke metalwork. This was a very varied project in terms of what was required and saw us designing, manufacturing and installing cycle shelters, lighting bollards, an automatic telescopic gate, plus security fencing. “We were delighted with the efficiency and capability of all Procter staff throughout the project.”

Medway

This project involved construction of a new build warehouse unit totalling 266,000ft. Associated offices and external works also formed part of the contract. Project type – New Build Location – London Medway, Commercial Park Client – Goodman Logistics / Anglesea Capital Main contractor – Readie Construction Value & Duration - £10m - 35 weeks

Merthyr County Council

Merthyr County Borough Council appointed Procter Contracts because of our vast experience and knowledge of installing Gallagher Pulse Monitored Fencing. We installed over 800LM of Pulse Fencing across 3 household recycling sites, including vehicular and pedestrian gates. Making all alterations where necessary to the existing host fencing to allow for the Gallagher install, as well as all civils and ducting work.

Mill Hill School

Procter Contracts was commissioned to carry out this Building Schools for the Future (BSF) project for a brand new school. The project included perimeter fencing and the installation of site hoarding. The 10-month project was carried out on time, snag free and within budget. Procter initially secured the site by erecting hoarding for the contractor of the project Kier Construction. We then supplied and installed 1.8m pro-twin wire mesh to the site, which was certified by Secured by Design and installed 3.0m twin wire fence for the sports pitches, including a bespoke timber bin store.

MJ Pheonix & Sons - Gateshead

Procter used Jacksons Timber Jakustic & Tilon Absorptive on manufactured steel posts. This was specifically installed to reduce the noise coming from the hospital staff in the recycling area. The aim was to provide a better work relationship between the hospital staff and neighbours. We tackled this job by working from the drawing supplied and giving guidance where necessary. Project type – Upgrade Location – Queen Elizabeth Hospital Gateshead Client – MJ Pheonix sons Ltd Main contractor – NHS “...very happy with the completed works with no issues. Would certainly recommend Procter." - Stuart Johnson, Contracts Manager

Morrisons

Due to a very tight timescale we were manufacturing 24/7 to ensure we could deliver and install on time - which we did. For this new Morrison's Supermarket we manufactured 3m high security fencing with rota spikes, armco barriers, bollards (from recycled material), anti-ram bollards, column protectors, trolley bays and cycle shelters. "We were very impressed with the full package Procter offered, they were extremely efficient and worked hard to reach the tight deadline we provided in order to complete the project on time."

Penarth Open Area

We supplied and installed 900mm high Bow Top Railings to the playground area. We also supplied and installed a new multi-use games area for Football, Basket Ball & Net Ball. Project type – New Build Location – Penarth, Vale of Glamorgan Client – Vale of Glamorgan County Council Main contractor – Jones Brothers

Porth Middle School

We were able to supply and install brand new Access Gates & Fencing to the new primary site, within the secondary school boundary. This was a testing project due to the fact that the school was still live during term times. We worked along side Dawnus to ensure the safety of the works and pupils and all works were completed for the handover for the new school year.

Regent School

Procter Contracts has completed another successful project with BAM Construction, for which Procter had taken the job from design, through to manufacture & installation. This is another BSF (Building Schools for the Future) project Procter are proud to have completed. We used the Accoya timber shipped from Scandinavia to build the gate, 2.4m high powder coated blunt top steel tubes for the railings and a sheet metal sliding gate. With a year of hard work, we completed the job on time for the opening of the new school, where London Mayor Boris Johnson presented.

Severn Bridge

This project was to provide security measures to Severn Bridge for the NATO Summit. Small areas of the bridge needed securing in order to prevent dangerous, threatening packages being left. This was highly important. The clients were very pleased with the works carried out. And were impressed with what we supplied, such as the Palisade fencing and palisade single leaf gates along with Pro-sure 358 fencing and heavy duty single leaf farm swing gate.

Skinners' Academy

Procter Automatic Gates has designed, manufactured and installed two 8.0 m wide cantilevered sliding gates, automated swing gates, manual gates, railings and fencing at the Skinners' Academy, a secondary school in Hackney sponsored by the Skinners' Company and specialising in Business, Enterprise and ICT. The automated gates for the school entrances are both cantilevered sliding gates that control access through 8m-wide openings. These are Procter Pro-glide 20 gates that have been customised with laser-cut panels containing the academy's name in its own colours.

Slough Data Centre

The installed secure perimeter fencing around the data centre enabled the client to meet the highest security requirements required to operate its business. Specifically designed for high-security applications, Pro-Sure 358 high security fencing consists of 76.2mm x 12.7mm mesh. This meant that not only would it be impossible for would-be trespassers to get a foothold or wire cutters in the fence, the improved through visibility enabled the area on the other side of the fence to be monitored easily.

South Wales Manufacturing Site

Sandvik Osprey Ltd has become the major supplier of powders to the MIM industry and are based in South Wales. Their brief to Procter was to design, manufacture and install a Police Secured By Design security fencing system which is aesthetically pleasing as well as very secure to the perimeter of the site.

St Michael's Primary School

Quote from client: “We worked with Procter fencing on a £7.5m primary school in Larkhill, north of Salisbury. This project comprised of boundary fencing, sports pitch fencing, Armco barriers and timber cladding to the sprinkler tank and bin store along with the full range of street furniture. Procter were great to work with and along with the operatives, would do anything to help the team and work together effectively. I would definitely use Procter fencing again for a range of supply and installation purposes.” Connor Taylor BSc (Hons) Graduate Site Manager

Student Accommodation

The entrance to the goods area is ten metres wide and with a level surface, and this therefore made our choice of telescopic tracked sliding gate the ideal one. The timber slats demonstrate how simple features can make a functional gate aesthetically more pleasing. We designed, manufactured and installed a telescopic tracked sliding gate for this new development of independent student accommodation. "Very pleased with the design of the gates and all aspects of our service."

Student Accommodation Godiva Place

To design manufacture and install purpose made automated swing gate. Included, are purpose made railing panels and pedestrian swing gates. Gate opening size 3.00 x 7.00m wide. Project type – Refurbishment Location – Godiva Place, Coventry Main Contractor – Galiford Try Products Used - Bespoke Gates & Railing panels to the car park.