Kings Hill Primary School is an early 19th Century building. The old roof slates were flaking due to frost damage with many slipped / lost slates needing replacing.

Kings Hill Primary School is an early 19th Century building. The old roof slates were flaking due to frost damage with many slipped / lost slates needing replacing.

IKOslate was chosen by the client (Walsall MBC) as a low weight, cost effective alternative. The products CO2 credentials were also a key factor. During the installation IKO Rubershield Pro and IKO Armourvent were also installed to provide cross flow ventilation, and IKO’s lead substitute IKOflash was installed in the valleys and for flashing the chimneys. The steep pitch of the roof provided the contractor with a challenge particularly with the cold damp Autumn mornings.
Large Residential Estate Restoration for Energy Efficiency

Large Residential Estate Restoration for Energy Efficiency

Work began on the major upgrade to the 469 council homes in March 2012, which could lead to them becoming up to 47% more energy efficient (based on BRE study 2013). The scheme is mainly funded by Milton Keynes council with power giants npower providing grant funding that they earn based on the amount of carbon savings realised by installing the ‘eco-upgrades’.
Liquid and Bituminous Multi-System Project - Airbus, Stevenage

Liquid and Bituminous Multi-System Project - Airbus, Stevenage

22,000m2 Flame-Free System Used in Sensitive Industrial Refurbishment Improvement was necessary to improve roof and gutter surface water clearance. IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations. IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.
Liquid Waterproofing Solution Meets Refurbishment Needs of Coastal Residential Development

Liquid Waterproofing Solution Meets Refurbishment Needs of Coastal Residential Development

A robust, trafficable waterproof finish was required to fulfil the brief and this had to be installed with minimal disruption to residents, allowing them access at all times. The waterproofing system needed to offer some slip resistance and be aesthetically pleasing whilst still being functional and robust. Furthermore, the waterproofing works were due to be undertaken during the winter months and so cooler conditions were to be expected and needed to be allowed for.
Liquid Waterproofing to Save an Underground Car Park

Liquid Waterproofing to Save an Underground Car Park

6,000m2 Enhanced Pedestrian Spaces and Car Park Waterproofing Solution Broadway Plaza is a multi-use facility based in Birmingham City centre; in use 24 hours a day, it houses an array of eateries, leisure and accommodation venues. Water ingress had caused fire retardant paint to peel from the metal structure. IKO Permascreed was introduced to reduce the risk of gassing from the saturated screed. IKO Polimar Fillers and Levelling Mortar were installed to take deflections from the surface. IKO Polimar FCS Walkway System was then applied. Escalators were removed and staircases installed with an IKO Polimar FCS finish.
Local Church Benefit from Refurbished Roof

Local Church Benefit from Refurbished Roof

The hall’s roof had started leaking and was in a desperate need of repair. IKO’s technical engineer carried out a moisture probe analysis to establish the extent of the damaged membrane and deck beneath.
Long Term Solution for Troublesome A55 Manhole Covers

Long Term Solution for Troublesome A55 Manhole Covers

IKO approved contractor and highway repair specialist, RAB Associates (UK) Ltd, removed the cast iron cover and frames, and removed residual material such as loosened brickwork. The surrounding distressed road surfacing was also removed. Then, using IKO Permatrack Compounds, the re-bedding to match adjacent levels of the previous items was quickly completed. The repair was finished using IKO Permatrack and pre-coated high PSV chippings to fill the surrounding void to match the existing road levels.
Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

A failed manhole near a residential area in Market Harborough needed to be reinstated. Leicestershire County Council required a long-lasting road ironwork reinstatement solution that could be installed right first time.
Mastic Asphalt Roofing Solution for Flats

Mastic Asphalt Roofing Solution for Flats

Peabody Estate, owner of the Grosvenor Estate Flats (Chesham and Hanover), Mayfair, London prefer to replace new building materials that match the material that is being replaced, in-keeping with the authenticity that so many buildings have in this areas of London. In this case Mastic Asphalt. IKO successfully designed and installed the new roofing system - alongside contractor Sinclair Roofing, despite the difficulties with access (for plant and materials) and not being able to alter the perimeter railings.
New Rehabilitation Unit Receives 30 Year Guaranteed IKO UPXL Roofing System

New Rehabilitation Unit Receives 30 Year Guaranteed IKO UPXL Roofing System

Designed to offer the best waterproofing performance, IKO UPXL offers a superior roofing solution and comes with a 30 year full system guarantee. Clients specifying IKO UPXL systems also benefit from IKO’s technical knowledge amd service plus dedicated specification support. In addition, IKO UPXL is only ever installed by members of ACCESSIKO, our premier group of the most trusted and experienced Contractors. ACCESSIKO Contractors have been specially selected for their standards of workmanship and professional integrity, ensuring the highest quality installation on every project.
New Thermal Efficient Roof Replacement

New Thermal Efficient Roof Replacement

Ysgol Greenhill School wanted a solution that delivered a robust, long-lasting system that could be quickly and safely installed, from a manufacturer that could provide comprehensive technical support throughout the project.
New Urban Development Roof Benefits From 1 Hour Curing Screed

New Urban Development Roof Benefits From 1 Hour Curing Screed

Whilst considering various options, IKO provided Bellway Homes with information on their asphalt based IKO Permascreed system, which was compatible with the IKO Permatec solution to follow. The application of IKO Permascreed not only ensures fast track application, but also provides a temporary waterproofing layer prior to installation of the IKO Permatec top layer. Once cured the IKO Permascreed layer was robust enough to accept the type of traffic and concentrated loads associated with the installation of a flat roof waterproofing system.
New-Build Retirement Block Receives the Benefits of both a Hot Melt, Bituminous and Cold Applied Liquid Roofing Systems

New-Build Retirement Block Receives the Benefits of both a Hot Melt, Bituminous and Cold Applied Liquid Roofing Systems

IKO Permatec Hot Melt was used in the gutters and balconies where a bison slab was used for the deck. On the main roof area was a timber deck and the preferred system for this was a built-up bituminous membrane system. IKO Challenger 180 nailed layer, IKO Systems Torch-on Underlay and IKO Superflex Cap Sheet were installed. Difficult details were overcome by using IKO Polimar EC/UV cold liquid applied system, then a scattering of mineral was applied whilst still wet to provide a matching finish to the bituminous membrane.
Old Students’ Union Receives Fire Protected Roof

Old Students’ Union Receives Fire Protected Roof

IKO Ultra Prevent T-O Brown cap sheet was specified for the 300m2 flat roof areas, and Armourglass Dual Brown Roofing Shingles were specified for the 200m2 pitched roofs. The roofing shingles were chosen to maintain the original slate effect on the pitched roof areas. The work also involved re-lining of existing steel gutters and improving the thermal performance of the whole roof.
Plot 700, Winnersh Triangle (Carbon Neutral)

Plot 700, Winnersh Triangle (Carbon Neutral)

This project was a new build, the main contractor specified the need to house a roof/plant room area at the top of a new office block. Originally, it was thought that a Single-Ply, warm roof installation would be the best solution. However, when consulting with IKO about the main requirements for the roofing solution, both pre and during installation, IKO Permaphalt was the obvious choice due to the speed of installation and the robust nature of the materials that would be used and in an inverted roofing situation, potentially last the lifetime of the building.
Portslade Academy - IKO Ultra Prevent

Portslade Academy - IKO Ultra Prevent

Portslade Aldridge Community Academy is based in the heart of Portslade, Brighton. The secondary school and Sixth Form specialises in Sports, Science, Media and Entrepreneurship. There has been significant development of the site over recent years and includes a new community library and a Science Technology Engineering and Mathematics (STEM) Centre. Due to the nature of the site, a hybrid system was preferred by the client in order to reduce the use of hot works and for its excellent waterproofing performance. This is why the IKO Ultra prevent (Hybrid) system was chosen for the project.
Prestigious Residential Property Receives New and Improved Roof

Prestigious Residential Property Receives New and Improved Roof

IKO carried out a roof survey and core sample analysis which created a detailed condition report, then liaised with installing roofing contractors WAA Roofing Ltd to refine the specification to meet the client’s requirements. This was to include an overlay of the existing asphalt system.
Protecting Against Coastal Erosion with Mastic Asphalt

Protecting Against Coastal Erosion with Mastic Asphalt

One solution to the problem was to extend the existing revetment construction, but this would have required large volumes of excavation with increased times and cost. It was therefore decided to adopt a minimal excavation of the toe area only, infill with a rock layer and fully grout using IKO Bituminous grout. This resulted in a flexible bituminous bound slab, which would follow the future settlement and scour of the toe, thus preventing undermining of the sea wall revetment
Refurbishment of 1960's Flats Using Liquid Waterproofing

Refurbishment of 1960's Flats Using Liquid Waterproofing

The existing 1960’s housing blocks required a long lasting roofing system to replace the current ‘response to leaks’ patching and repair system currently in pace, including an upgrade in insulation to meet Part L Building Regulations. IKO Polimar EC/UV was chosen to match St Albans City & District Councils policy of primarily using cold applied liquid systems for roofing refurbishment work.
Replacing 100 Year Old Asphalt on St Paul’s Cathedral Stone Gallery

Replacing 100 Year Old Asphalt on St Paul’s Cathedral Stone Gallery

Successful project management and asphalt installation (in accordance with BS 8218:1998) were key to conserving one of the most important architectural structures in the U.K. Works were phased to enable continued public access to Stone Gallery sections. The height and highly sensitive fabric of the building meant that all materials were transported to the Gallery via three hoists, requiring careful operation and management.
Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.
Replacing Existing Asphaltic Plug Joints on the Busy M4 Chiswick Flyover

Replacing Existing Asphaltic Plug Joints on the Busy M4 Chiswick Flyover

Chiswick Flyover is situated at the end of the M4, joining the motorway to the A4, a main arterial route carrying thousands of vehicles into Central London each day. As part of a total refurbishment of the flyover IKO Permatrack Heavy Duty Expansion Joints were chosen by Consultants Mouchel Parkman to replace the existing Asphaltic Plug joints .The jointing system was installed by Laser Special Projects a subsidiary of the Volker group of Companies.
Replacing Road Joints With Minimum Disruption To All Road Users

Replacing Road Joints With Minimum Disruption To All Road Users

The major route in and out of the Port of Tilbury sustains daily, continual heavy HGV traffic which can deteriorate road joints. A cost effective solution was required, with minimum disruption to all road users. The IKO Permatrack H Bridge Joints were chosen for their proven track record on numerous other joints installed on the UK’s motorway network.
Replacing the 55,000m2 Roof Area at Euston Station

Replacing the 55,000m2 Roof Area at Euston Station

The 55,000m2 roof area of one of London's busiest train stations was in an advanced stage of deterioration. IKO PLC liaised with roofing contractors Weatherproofing Advisors to refine the specification. Working with the public, and in a commuter environment, Weatherproofing Advisors had the added challenge of completing the project through one of the worst winters in 50+ years.
Residential Living Above a Modern Retail Development

Residential Living Above a Modern Retail Development

IKO Permatec, developed by IKO PLC, is a highly advanced and innovative hot melt waterproofing system, which provides environmental benefits as well as market leading performance. Providing zero wrapper waste, lower application temperatures and anti-root protection, the product provides many operational advantages. It is also manufactured in the UK, with a dramatically lower carbon footprint than imported systems.
Residents Benefit From New Watertight Roof

Residents Benefit From New Watertight Roof

IKO worked with installing contractors BriggsAmasco to refine the roof specification and recommended IKO’s Mach One single layer bituminous membrane system, installed to the recommendations of wind uplift calculations and performing to a 0.18U value as per requirements.
Residents Receive New Roof and Balcony Areas

Residents Receive New Roof and Balcony Areas

The project had strict schedules which meant that minimal disruption to the surrounding areas was essential. A waterproofing system was required that would meet the requirements from both the public and private sectors as well as provide a contemporary, aesthetically pleasing finish.
Roofing Overhaul To Heritage Building

Roofing Overhaul To Heritage Building

Hurst Castle, situated in the Solent, originated in the 15th century and has undergone many additions and alterations up to it’s last defensive role in WW2. Over 5000m2 of Mastic Asphalt roofing was scheduled by English Heritage/Historic England for an extensive overhaul. Throughout the project there was very close consultation with all agencies, local and national suppliers to achieve like for like replacement of the original makeup, adjusting plans at short notice as variations were uncovered.
School Receives New Single Layered Roofing System

School Receives New Single Layered Roofing System

The roof on Bede Primary School and Community Centre in Gateshead was in great need of repair. Installing roofing contractors Hodgson and Allon liaised with IKO to refine the specification to meet the client’s requirements. This included a full strip and re-cover with a flame free system to carry a 20 year guarantee. IKO chose an IKO Mach One single layer bituminous system incorporating a site specific cut-to-fall system. This project was a complex roof replacement system with multi-trades required for specialist operations.
School Roof Receives Much Needed Fire Protection and Waterproofing

School Roof Receives Much Needed Fire Protection and Waterproofing

Walker Primary School was opened in 1953 as a one-form entry primary school with seven classes. Over the years, due to its popularity, it has grown and new buildings have been added. Due to the structural design of the building, the roof trusses once exposed meant that the roof changed from one roof to several individual roofs with their own drainage and design issues which meant that each roof had to give its own tapered scheme for each area, which in some cases had to work in tandem with the abutting roof it was next to.
Shatter Resistant Tiles Complete New Roof for Residents at Golf Club Lodge

Shatter Resistant Tiles Complete New Roof for Residents at Golf Club Lodge

When starting to plan the development of a new 18 bedroomed lodge at Kingswood Golf Course, the management team were concerned about its proximity to the 18th hole and the perennial damage that had been caused over time to the existing slate roofs of the club house from golf balls. They wanted a more robust, sustainable solution for the roof of The Lodge.
The Beauty of Slate With None of the Drawbacks

The Beauty of Slate With None of the Drawbacks

When the garage at a house in Sheffield had to be rebuilt from scratch due to unforeseen circumstances, the homeowner was keen to make sure that re-cycled products were used for the job. He also wanted a roofing tile solution that would complement the original slate on the main roof of the house.
The National Grid HQ, Warwick (Carbon Neutral)

The National Grid HQ, Warwick (Carbon Neutral)

The main car park at their HQ in Warwick had been leaking for a number of years. Various systems had been employed to tackle this, however all had failed. Some areas were ‘out of action’. They were having to hire a nearby car park, then run a bus service, this was costly and inconvenient and caused disruption. The solution proposed and provided by IKO, meant stripping and replacing the existing 6,500m2 car park deck within a twelve week period, in two phases, whilst keeping the remaining 18,000m2 open, minimising disruption to the business, staff and visitors.