Changeover Solution For London Solicitors

Changeover Solution For London Solicitors

IDE Systems

When a power failure struck a UK solicitor’s office and took IT systems offline for several hours, the company risked losing international customers. This motivated the company to rethink its current electrical equipment, particularly its distribution board. Working together with our engineers, necessary equipment was designed and manufactured by IDE. Read more about our solution by clicking on the attached case study.
Event power monitoring solution helping to reduce power usage and carbon emissions – Christmas market.

Event power monitoring solution helping to reduce power usage and carbon emissions – Christmas market.

IDE Systems

Improving site power usage, such as low energy products, hybrid systems and active power switching requires the right knowledge of why and when power is needed, information that until now has been guess work and can often lead to ineffective solutions. Erica brings this information right to the engineer’s desk, enabling them to make optimum choices and demonstrate real savings. To find out more on how Erica was utilised at a Christmas market, click on our case study attached. More information on Erica can be found by visiting our website via the link below.
Fixed Power Clusters For ACC Liverpool

Fixed Power Clusters For ACC Liverpool

IDE Systems

ACC Liverpool reached out to extend its exhibition hall space in late 2015. The complex turned to IDE to produce a single point distribution system to provide power to the 8100 square metres of event space. Due to the stage constraints, Fixed Power Clusters were identified as the solution to cater to ACC Liverpool’s needs. To find out more about our solution, click on our case study attached.
Outdoor Power Clusters For AB Ports

Outdoor Power Clusters For AB Ports

IDE Systems

Ports in Newport, Swansea and Cardiff required redevelopment work to bring their electrical infrastructure up to date with modern quality standards. Due to the original connection points being built in the 1960s, the years had not been kind to the structure and electrical condition of the boxes. IDE were pivotal in upgrading the existing electrical infrastructure to allow for cranes to connect safely and efficiently to a reliable mains power supply. Read more within the case study attached.
Site power monitoring solution helping to reduce power usage and carbon emissions –construction site.

Site power monitoring solution helping to reduce power usage and carbon emissions –construction site.

IDE Systems

Improving site power usage, such as low energy products, hybrid systems and active power switching requires the right knowledge of why and when power is needed, information that until now has been guess work and can often lead to ineffective solutions. Erica brings this information right to the engineer’s desk, enabling them to make optimum choices and demonstrate real savings. To find out more on how Erica was utilised at a construction site, click on our case study attached. More information on Erica can be found by visiting our website via the link below.
Temporary Power Network For British Super Bikes

Temporary Power Network For British Super Bikes

IDE Systems

Innovations in corporate hospitality and the introduction of temporary living quarters means that the venues now resemble small cities rather than traditional racing circuits, making it even more vital that power is not interrupted during the crucial live TV broadcast of the events. Due to our knowledge and experience in the temporary power sector, IDE was able to provide specialist support to the British Superbike Championship. Read more about how we supported the Championship within our attached case study.
Temporary Power Overlays For Commercial Firm

Temporary Power Overlays For Commercial Firm

IDE Systems

When growing concerns of a buildings electrical services in the City of London came to light, problems such as water ingress and corrosion were some of the challenges to name a few. IDE worked closely to design, manufacture and deliverer a temporary overlay for the outside of the building. To find out more about this solution, click on the case study attached.