Case study
by Sika Limited
In preparation for the 2012 London Olympic Games, the swimming pool in Crystal Palace National Sports Centre has been extended to 50 metres to meet Olympic standards. When it came to the internal waterproofing of the pool, plant rooms and ventilation tunnels, plus repairs to the diving boards, a repeat of the specification that has kept the pool watertight for over 50 years was the natural choice.
Contact Sika Limited by clicking the button below to find out which products were used in this Case study.
Waterproofing Hugo Boss Case Study
Waterproofing Ashmolean Case Study
Waterproofing Gateshead Leisure Centre Case Study
Sikafloor 14 Pronto