Olympic Handball Arena Protan Prefabricated System

Case study

Olympic Handball Arena Protan Prefabricated System

by Protan (UK) Ltd

Press release regarding the Protan Prefabricated System installed at the Olympic Handball Arena, London.

Preview

No featured products in this Case study

Contact Protan (UK) Ltd by clicking the button below to find out which products were used in this Case study.

More literature from Protan (UK) Ltd

View all literature (32)