NBS Source
I'm a manufacturer
Gaskessel Wuppertal Case Study

Case study

Gaskessel Wuppertal Case Study

by Hempel A/S

If you go to Wuppertal, you will not be able to miss its local landmark: a 66m derelict gas tank right in the heart of the town itself, an undeniable feature of the urban landscape. It was built between 1950 and 1952 but as of 1997 it was used as storage for a gas power station, before falling out of use. The tank’s owner, (Stadtwerke Wuppertal) was keen to see it removed, although it had become something of an icon to all those residents living within sight of it.

Products related to this literature

View all products (28)
Hempadur 45143 - General Purpose Epoxy Primer / Intermediate -  High build Primer / Intermediate

Hempadur 45143 - General Purpose Epoxy Primer / Intermediate - High build Primer / Intermediate

More literature from Hempel A/S

View all literature (66)
Hempel's Galvosil 15700 Product Information Sheet

Hempel's Galvosil 15700 Product Information Sheet

Hyperloop Case Study

Hyperloop Case Study

Huttenwerke Krupp Mannesmann Case Study

Huttenwerke Krupp Mannesmann Case Study

Břeclav Bridge Case Story

Břeclav Bridge Case Story