NBS Source
I'm a manufacturer
FIFA World Cup Stadium Case Study

Case study

FIFA World Cup Stadium Case Study

by Hempel A/S

When the 2014 FIFA World Cup kicked off in Brazil on 12 June, Hempel had already been involved in Brazil’s intensive stadium preparation programme for three years. Our work included protecting the steel roofing structures of three stadiums that were specifically built for the event. Arena Fonte Nova in Salvador da Bahia, Estádio do Castelão in Fortaleza and Arena do Grêmio in Porto Alegre all have Hempel coatings that ensure they will remain safe and beautiful for years to come.

No related products in this Case study

Contact Hempel A/S by clicking the button below to find out which products were used in this Case study.

More literature from Hempel A/S

View all literature (66)
Hempel's Galvosil 15700 Product Information Sheet

Hempel's Galvosil 15700 Product Information Sheet

Hyperloop Case Study

Hyperloop Case Study

Huttenwerke Krupp Mannesmann Case Study

Huttenwerke Krupp Mannesmann Case Study

Břeclav Bridge Case Story

Břeclav Bridge Case Story