Drying of Gypsol Anhydrite Screeds

Technical data sheet

Drying of Gypsol Anhydrite Screeds

by GYPSOL - LKAB

This data sheet is a record of independent test data compiled by Action Dry Ltd which identifies and quantifies drying times, moisture test methods and other moisture related information on Gypsol Screeds. It shows that the drying time based on environmental conditions of 20 degrees C and 60% RH Gypsol screed at 50mm dries in 28 days and when force dried using underfloor heating dries in 13 days. Drying times are affected by site conditions, suitability of the site and depth of screed.

Preview

No featured products in this Technical data sheet

Contact GYPSOL - LKAB by clicking the button below to find out which products were used in this Technical data sheet.

More literature from GYPSOL - LKAB

View all literature (15)