NBS Source
I'm a manufacturer
Brett called in to work on key infrastructure project for the central reservation at Kingsway Widnes

Case study

Brett called in to work on key infrastructure project for the central reservation at Kingsway Widnes

by Brett Landscaping

Halton Borough Council had an easy decision to make in choosing Brett Landscaping to work with them on a key infrastructure project. The project was to rebuild and renovate a dual carriageway’s central reservation. The reservation, which featured low-level walls retaining grass verges, was showing signs of damage. The old low-level walls of the central reservation had crumbled and weathered due to a combination of weathering and rainwater pressure behind the wall.

No related products in this Case study

Contact Brett Landscaping by clicking the button below to find out which products were used in this Case study.

More literature from Brett Landscaping

View all literature (104)
Safe Handling Advice For kerbs And Flag Paving

Safe Handling Advice For kerbs And Flag Paving

Specialist Kerbs & Permeable Paving

Specialist Kerbs & Permeable Paving

Corporate Brochure

Corporate Brochure

Aura CBP TDS Sept 21

Aura CBP TDS Sept 21