NBS Source
List your products

Wind Energy Grouting Solutions - Fife Energy Park

by BASF Construction Chemicals (UK) Ltd

  Favourite

The Scottish government gave the green light to Samsung Heavy Industries to test its first 7MW offshore wind turbine at Fife Energy Park. MasterFlow 9500 was chosen for this project as it is the only ultra-high strength grout specifically designed for grouting offshore wind turbines with proven fatigue resistance. The massive turbine is connected to shore via a walkway to enable visitors to get up close to the structure. This part of the structure was also fixed to the seabed and grouted by MasterFlow 9500.

Read more

No featured products in this case study

Contact BASF Construction Chemicals (UK) Ltd by clicking the button below to find out which products were used in this case study.

More case studies from BASF Construction Chemicals (UK) Ltd

View all case studies from BASF Construction Chemicals (UK) Ltd (15)