NBS Source
List your products

West Lakes Village, Minehead

by ecodek

  Favourite

Designed in collaboration with Mumsnet, this landmark scheme involved the design, construction and fit-out of 117 chalets at the existing Butlin’s resort in Minehead. Architects Allison Pike Partnership worked with principal contractor McGoff & Byrne on this £16 million development built around two lakes with external terraced spaces and walkways, including a bridge. Each of the ‘seaside style’ chalets has an outside decked area with many of the properties featuring ecodek® balconies.

Read more

No featured products in this case study

Contact ecodek by clicking the button below to find out which products were used in this case study.

More case studies from ecodek

View all case studies from ecodek (8)