OVERVIEW
The Wembley Stadium project was one of the most expensive stadiums ever built, with costs totalling to over £789 million (£1.2 billion today).
During the construction of the Stadium, Pyramid Builders provided the brickwork, blockwork, stonework, engineering, steel Windposts, firestopping and scaffolding along with the logistical management of all associated deliveries along with main contractor Multiplex Construction UK.
The stadium was designed by Architects Foster and Partners with exceedingly high internal walls, and to make these walls stable, Windposts were required to increase lateral wall stability.
CFS manufactured and supplied steel Windposts used in the construction. Manufactured from Austenitic Stainless Steel which provides excellent corrosion protection, CFS Windposts are designed to enhance structural integrity by reducing deflection and ensuring walls remain secure and straight. We also provide design flexibility for taller or longer walls without compromising structural safety, even in high wind areas.
Based on the provided design, CFS provided custom manufactured steel Windposts up to 10m long to restrain the internal walls. These Windposts are integrated within the block walls.
Image not by CFS.
CFS WIN3 Windpost
CFS WIN1 Windpost
CFS WIN2 Windpost
Regent's Crescent
Coventry Very Light Rail Project
114 Lots Road, Chelsea Waterfront
Sackville Road
Chocolate Works - Corner Lintels, Windposts & Standard Lintels
Holland Park Phase 2 - Hi-therm+ Lintels & Windposts
St Marks Student Accommodation
Southmere Phase 1b