The project 

Located in the heart of Manchester’s city centre, Waterhouse Gardens is an exciting mixed-use development being built on the historic former Boddington Brewery site. Its namesake is homage to the architect Alfred Waterhouse, designer of Manchester Town Hall and the nearby prison with its landmark Grade II listed ventilation tower constructed in brick and sandstone. This vibrant new neighbourhood has been meticulously planned to create a community for residents looking for the modern city centre lifestyle. When finished, the project will provide 556 high quality homes, luxury amenities, and 31,000 sq.ft of commercial and retail opportunities, set across five towers ranging from 10 to 26 storeys.  

Details

Year

Completion Q2 2026

Location

Manchester, UK

Building use

Residential I Mixed

Developer

Salboy

Main contractor

Domis Construction

Brickwork contractor

Kinlan Brickwork Ltd

Rainscreen contractor

LDG Contracts

Products used

Design and specification

The elevations of each tower predominantly features a traditional brick finish, echoing the historic red brick brewery buildings that previously occupied the site to create a timeless aesthetic that sets this modern urban development firmly within Manchester’s varied architectural landscape. The towers are joined with decorative rainscreen elements to create a sense of cohesion across the site. 

Siderise were brought in by Domis early in the design phase to address the passive fire protection and drainage requirements for the masonry wall elements. With a fire performance requirement for 2-hour fire resistance on all towers, we recommended a combination of EW Cavity Barrier and Firestop and CT Cavity Tray, which work together hand in hand.

This systemised approach provides continuous fire stopping and effective moisture management sourced from a single supplier to ensure complete compatibility. Additionally, the Lamella insulation core of the EW Cavity Barriers enables them to be friction-fitted within the cavity to wet brickwork without compromising the stability of the wall structure, helping yield significant advantages in build program speed and sequencing. It also allows for the cavity barrier to be fully penetrated by masonry supports, whilst maintaining its fire resistance. Incorporating these into the design from the outset, and having the benefit of full masonry support penetration, helped to save significant money and time, as the team could omit including concrete up- and down-stands from the slab edge. 

Furthermore, Waterhouse Gardens was the first project to have our newly launched RH25-120/120 Horizontal Cavity Barrier, which was installed by LDG Contracts after the fire performance specification for the rainscreen element was changed from 90-minutes to two-hours by the project team. 

Throughout the project the Domis design team had been developing their own set of standard details to make life onsite easier on both this and future projects. To ensure that the passive fire protection elements are properly addressed, they have been working closely with Siderise Technical Services, drawing on our own standard details and test data, and asking advice on what is possible. 

Installation and inspection

Due to the volume of product needed on this large site, the cavity barriers were supplied to site in slab form and then cut to size to fit the specified depth by Kinlan’s expert team in a dedicated workshop on the site. This helped to reduce onsite wastage, maintain quality standards and enabled a continuous supply of product, when and where the bricklayers needed it. 

Siderise Site Services have provided ongoing support throughout the construction phase. This included delivering Product Information Training and ongoing site visits to provide detailing advice and inspections to check the installation was progressing as intended. This continual correspondence allowed any issues, particularly relating to the interfacing of the products, to be rectified early in the build programme ensuring a consistent quality level across the large development. Additionally, in between visits, the installation team at Kinlan were able to self-audit their work via the Siderise Inspection App. 

Summary

Waterhouse Gardens is bringing the buzz and energy back to the former brewery site, transforming it into a vibrant community for the next generation of city centre dwellers to thrive. This past-meets-future story is echoed in the relationship between Siderise and the Domis and Kinlan teams. Drawing together our knowledge and experience, we have been able to develop a high level of quality and understanding which can be applied to future projects, from developing standard details to helping to upskill the installation team. This will help to ensure the creation of safe, compliant developments for many years to come. 

No featured products in this case study

Contact Siderise Group by clicking the button below to find out which products were used in this case study.

More inspiration from Siderise Group

View inspiration
Ciel Tower

Ciel Tower

Delivering an impressive acoustic performance at World Class Arena

Delivering an impressive acoustic performance at World Class Arena

Exceeding performance criteria for London Olympics Village

Exceeding performance criteria for London Olympics Village

Bringing noise control to new levels at One Hyde Park

Bringing noise control to new levels at One Hyde Park