This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more

NBS Source

UK Specification delivering on London Schools

OVERVIEW

Little Ilford, Eastbrook and Eastbury Schools all presented distinctive design challenges in terms of access, safety and flow around the building. Added to this was the ever-present pressure to meet with the required standards for a public sector project, which included the need to use BIM level 2 throughout the design and build process.

No featured products in this case study

Contact ASSA ABLOY Opening Solutions UK & Ireland by clicking the button below to find out which products were used in this case study.

More case studies from ASSA ABLOY Opening Solutions UK & Ireland

View all case studies (18)
Canary Wharf Elizabeth Line Station

Canary Wharf Elizabeth Line Station

London Underground

London Underground

Queen Elizabeth Olympic Park

Queen Elizabeth Olympic Park

The Shard

The Shard