NBS Source
List your products

UK Specification delivering on London Schools

by ASSA ABLOY Opening Solutions UK & Ireland

  Favourite

Little Ilford, Eastbrook and Eastbury Schools all presented distinctive design challenges in terms of access, safety and flow around the building. Added to this was the ever-present pressure to meet with the required standards for a public sector project, which included the need to use BIM level 2 throughout the design and build process.

Read more

No featured products in this case study

Contact ASSA ABLOY Opening Solutions UK & Ireland by clicking the button below to find out which products were used in this case study.

More case studies from ASSA ABLOY Opening Solutions UK & Ireland

View all case studies from ASSA ABLOY Opening Solutions UK & Ireland (18)