NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The Lincoln

OVERVIEW

The Lincoln, in Manchester’s Central Business District, offers luxury Grade A office space. The building occupies a prominent position on Brazennose Street, providing a dynamic hub where work, well-being, and sustainability converge.


Background

The Lincoln, in Manchester, sits in the heart of Manchester’s Central Business District. With six storeys consisting of 102,000 sq ft of office space, the new building aimed for Grade A status.

Achieving an excellent BREEAM rating, The Lincoln opened its doors to tenants in the summer of 2021.


Challenge

The client had a specific requirement to create a secure line connecting the lift lobby to the main building. The purpose of this line was to allow the staff at the reception to have remote control over it. The client was very particular about the design of the speed gates, as they needed to complement the luxurious look of The Lincoln. The gates had to be aesthetically pleasing and blend in seamlessly with the overall design of the building. The client wanted to ensure that the gates would provide security and enhance the guests’ overall experience.


To find out more please follow the link

The Lincoln Manchester - Case Studies - Meesons


No featured products in this case study

Contact Meesons A I Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Meesons A I Ltd

View inspiration
PureGym, Nationwide

PureGym, Nationwide

Savill Garden, Windsor

Savill Garden, Windsor

2 London Wall Place, London

2 London Wall Place, London

40 Bank Street, London

40 Bank Street, London