NBS Source
I'm a manufacturer

Thames Tideway Tunnel - Carnwath Road Riverside

OVERVIEW

Cordek were asked to supply the two guide wall formers required to locate the piles that form the shaft and aeration chamber at one of the main drive sites.

No featured products in this case study

Contact Cordek Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Cordek Ltd

View all case studies (21)
Dream

Dream

Spencer Dock Bridge

Spencer Dock Bridge

London 2012 Olympic Diving Platforms

London 2012 Olympic Diving Platforms

Moorgate Shaft

Moorgate Shaft