Cordek were invited to propose a re-useable formwork solution to pre-cast the two spiral staircases within Phase One’s residential block, Circus West. A combination of detailed planning and modern digital methods of manufacture resulted in a cost effective formwork solution which achieved the quality and multiple reuses required from this demanding project.