OVERVIEW
The Challenge
Simon Balle School asked BrookhouseUK to help them create two new Unisex washrooms in their Block 1 and Block 2 Sixth Form areas of the school.
The aim was to create open plan washroom spaces but with two sides to them by creating a partial height wall separating the two sides. As the layouts were completely changing and structural work needed to take place, this was a challenging undertaking.
Full height IPS cubicles were required with separate vents in each along with new hand washing facilities. Simon Balle School were fully committed to investing in these new modern toilet blocks which future-proofed them for generations to come. They also did not want to wait until the next summer holidays to complete the work.
The Solution
BrookhouseUK, having created a strict methodology for term time work, were able to refurbish both washrooms during term-time. We created a design which included demolishing the central dividing wall and installing new half-height partition walls using timber studs and hygiene wall cladding.
Two new modern solid surface wash troughs sat on each side of the new walls which included automatic taps and automatic soap dispensers, vastly improving the facilities. Oak effect doors with contrasting dark IPS panels gave the washrooms a fresh, updated look.
New automatic dryers were installed to complete the modernisation. Simon Balle School were delighted with the results and have happily recommended BrookhouseUK to other schools.
We Provided:
Hyperion IPS - Integrated Plumbing System
Apollo+ Cubicle - Panel Cubicle
Aura Vanity Unit - Vanity Unit
Parmiter's School | Washroom Refurbishment
Ashcombe School | Washroom Refurbishment
Tower Supplies Office Refurbishment
Interconnector Office Refurbishment
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron
Aberavon Aqua Splash
Ysgol Y Bynea
Ysgol Saron
Newhaven Holiday Park
Helensburgh Leisure Centre Project
St Sidwells Point Leisure Centre Project
The Pyramids Centre Leisure Complex Project
Riverside Ice and Leisure