NBS Source
List your products

SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE

by Sika Liquid Plastics

  Favourite

All apartments are accessed at the rear of the building via stairs and walkways and the existing asphalt walkway surfaces had blistered, causing various leaks and creating a trip hazard for residents. There was an urgent requirement to carry out the walkway refurbishment while the building remained fully occupied and with minimal disruption for occupants. The building’s flat roof had also reached the end of its service life, requiring a refurbishment to protect the apartments from water ingress.

Read more

No featured products in this case study

Contact Sika Liquid Plastics by clicking the button below to find out which products were used in this case study.

More case studies from Sika Liquid Plastics

View all case studies from Sika Liquid Plastics (7)