OVERVIEW
The Brackmills Gateway development is a brownfield site with 3 speculative units being prepared for use from Q3 2022. Providing a total of 820,000 sq ft of warehousing space.
Marsh Industries has provided 5 EN858 compliant Hydroil Separators to the site in early 2022.
2no Bypass Separators provide treatment to 10% of peak flow in areas with a lower risk of pollution to the environment. Whilst 3no Full Retention Separators treat the full flow of the designated catchment area, thus preventing high risk fuel spillage areas from polluting the local environment.
Contact Marsh Industries Ltd by clicking the button below to find out which products were used in this case study.