OVERVIEW
The Brackmills Gateway development is a brownfield site with 3 speculative units being prepared for use from Q3 2022. Providing a total of 820,000 sq ft of warehousing space.
Marsh Industries has provided 5 EN858 compliant Hydroil Separators to the site in early 2022.
2no Bypass Separators provide treatment to 10% of peak flow in areas with a lower risk of pollution to the environment. Whilst 3no Full Retention Separators treat the full flow of the designated catchment area, thus preventing high risk fuel spillage areas from polluting the local environment.
Marsh Hydroil™ Full Retention Separators - Full Retention Oil Separator
General Binding Rules 2020
Separators - TSL – Magna Park South – Lutterworth
Millets Farm Centre - Ultra Polylok Sewage Treatment 125PE & 250PE
Pannetoni Park, Northampton, M1 J16 – Oil Separators
Separators - TSL – Magna Park South – Lutterworth
Pannetoni Park, Northampton, M1 J16 – Oil Separators