OVERVIEW
The remediation of St George’s Island, a large residential development in Manchester’s sought-after Castlefield area, represents one of the UK’s most significant Building Safety Fund funded projects. The development consists of five blocks ranging between 8 and 14 storeys. The remediation of the building’s façades and balconies is being spearheaded by Starfish Construction.
As the Principal Contractor, Starfish Construction manages all project aspects, including replacing combustible cladding and timber decking to ensure compliance with fire safety standards. During the project planning and design, Starfish Construction identified that a durable, non-combustible balcony decking system aligned with the project’s stringent safety and quality requirements was essential, so they partnered with MyDek for a tailored solution.
Working closely with Starfish Construction, we proposed the Luxura A1 fire-rated decking as the ideal solution to replace the existing timber balcony decks. Conversations between both parties focused on achieving a balance between aesthetics, safety, and ease of installation, ensuring that MyDek’s solution would fit seamlessly into Starfish Construction’s objectives and project timeline.
Working together, we ensured the installation of a decking system that met all fire safety regulations and supported ongoing works while residents remained in situ.
"At Starfish Construction, we take great care in system and material selection throughout our projects’ planning and design stages. It’s vital that the systems we integrate not only deliver the necessary safety and durability but also make a significant aesthetic impact on the overall design. The MyDek system and team delivered on all counts." - Joe Hulley, Associate Director (Design & Technical) at Starfish Construction
Luxura® Deck 200 A1 Fire Rated Composite Decking System - A1 Fire Rated Non-Combustible Decking
BoxRail Aluminium Decking Support System - Decking Support System
Ocean Wharf, London
Grosvenor Waterside, London
London Dock Blocks C2 & C3, London SE1
Triptych Bankside, London
A three-in-one adjustable pedestal for paving and decking
Ceramic tile rail substructure system
Private Residence, London
Brewhouse Balcony Remediation
Single Ply Warm Roof Waterproofing on Residential block of flats.
Waterproofing to domes on Historic Building
Museum of the Home, London. Koster TPO Single Ply Membrane.
Koster TPO Single Ply membrane - Overlay Project.